Prevention in underground construction with sequential excavation method


Autoria(s): Tender, M.; Couto, J. Pedro; Ferreira, T. P.
Data(s)

01/02/2015

Resumo

This paper aims to describe the Sequential Excavation Method, used for excava-tion in underground works, as well as the related risks and preventive measures. This method has characteristics that differentiate it from other tunnelling techniques: it uses a larger number of workers and equipment; it has a high concurrency of tasks with various workers and equip-ment quite exposed to hazards; and it uses many potentially aggressive chemicals. Firstly, it is given a broad overview of this issue. Afterwards, it will be presented the results of a survey to a sample of experienced technicians, aimed at gauging the relevance of a set of guidelines relat-ing to the design and work phases, applicable to the domestic market and prepared following technical visits to works abroad.

Identificador

Tender M., Couto J. P., Ferreira T. P. Prevention in Underground Construction with Sequential Excavation Method, Occupational Safety and Hygiene III, Issue Vol 1, pp. 421-424, 978-1-138-02765-7, 2015

978-1-138-02765-7

http://hdl.handle.net/1822/38861

Idioma(s)

eng

Publicador

Taylor & Francis

Relação

https://www.crcpress.com/Occupational-Safety-and-Hygiene-III/Arezes-Baptista-Barroso-Carneiro-Cordeiro-Costa-Melo-Miguel-Perestrelo/9781138027657#googlePreviewContainer

Direitos

info:eu-repo/semantics/restrictedAccess

Palavras-Chave #Prevention in underground construction #Safety Construction #Sequential Excavation Method
Tipo

info:eu-repo/semantics/bookPart