920 resultados para Dam retirement


Relevância:

10.00% 10.00%

Publicador:

Resumo:

It is a basic work to ascertain the parameters of rock mass for evaluation about stability of the engineering. Anisotropism、inhomogeneity and discontinuity characters of the rock mass arise from the existing of the structural plane. Subjected to water、weathering effect、off-loading, mechanical characters of the rock mass are greatly different from rock itself, Determining mechanical parameters of the rock mass becomes so difficult because of structure effect、dimension effect、rheological character, ‘Can’t give a proper parameter’ becomes one of big problems for theoretic analysis and numerical simulation. With the increment of project scale, appraising the project rock mass and ascertaining the parameters of rock mass becomes more and more important and strict. Consequently, researching the parameters of rock mass has important theoretical significance and actual meaning. The Jin-ping hydroelectric station is the first highest hyperbolic arch dam in the world under construction, the height of the dam is about 305m, it is the biggest hydroelectric station at lower reaches of Yalong river. The length of underground factory building is 204.52m, the total height of it is 68.83m, the maximum of span clearance is 28.90m. Large-scale excavation in the underground factory of Jin-ping hydroelectric station has brought many kinds of destructive phenomenon, such as relaxation、spilling, providing a precious chance for study of unloading parameter about rock mass. As we all know, Southwest is the most important hydroelectric power base in China, the construction of the hydroelectric station mostly concentrate at high mountain and gorge area, basically and importantly, we must be familiar with the physical and mechanical character of the rock mass to guarantee to exploit safely、efficiently、quickly, in other words, we must understand the strength and deformation character of the rock mass. Based on enough fieldwork of geological investigation, we study the parameter of unloading rock mass on condition that we obtain abundant information, which is not only important for the construction of Jin-ping hydroelectric station, but also for the construction of other big hydroelectric station similar with Jin-ping. This paper adopt geological analysis、test data analysis、experience analysis、theory research and Artificial Neural Networks (ANN) brainpower analysis to evaluate the mechanical parameter, the major production is as follows: (1)Through the excavation of upper 5-layer of the underground powerhouse and the statistical classification of the main joints fractures exposed, We believe that there are three sets of joints, the first group is lay fracture, the second group and the fourth group are steep fracture. These provide a strong foundation for the following calculation of and analysis; (2)According to the in-situ measurement about sound wave velocity、displacement and anchor stress, we analyses the effects of rock unloading effect,the results show a obvious time-related character and localization features of rock deformation. We determine the depth of excavation unloading of underground factory wall based on this. Determining the rock mass parameters according to the measurement about sound wave velocity with characters of low- disturbing、dynamic on the spot, the result can really reflect the original state, this chapter approximately the mechanical parameters about rock mass at each unloading area; (3)Based on Hoek-Brown experienced formula with geological strength index GSI and RMR method to evaluate the mechanical parameters of different degree weathering and unloading rock mass about underground factory, Both of evaluation result are more satisfied; (4)From the perspective of far-field stress, based on the stress field distribution ideas of two-crack at any load conditions proposed by Fazil Erdogan (1962),using the strain energy density factor criterion (S criterion) proposed by Xue changming(1972),we establish the corresponding relationship between far-field stress and crack tip stress field, derive the integrated intensity criterion formula under the conditions of pure tensile stress among two line coplanar intermittent jointed rock,and establish the corresponding intensity criterion for the exploratory attempt; (5)With artificial neural network, the paper focuses on the mechanical parameters of rock mass that we concerned about and the whole process of prediction of deformation parameters, discusses the prospect of applying in assessment about the parameters of rock mass,and rely on the catalog information of underground powerhouse of Jinping I Hydropower Station, identifying the rock mechanics parameters intellectually,discusses the sample selection, network design, values of basic parameters and error analysis comprehensively. There is a certain significance for us to set up a set of parameters evaluation system,which is in construction of large-scale hydropower among a group of marble mass.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Rock mass is widely recognized as a kind of geologic body which consists of rock blocks and discontinuities. The deformation and failure of rock mass is not only determined by rock block,but also by discontinuity which is virtually more important. Mutual cutting and combination of discontinuities controlled mechanical property of rock mass. The complex cutting of discontinuities determine the intense anisotropy on mechanical property of rock mass,especially under the effect of ground stress. Engineering practice has show that the brittle failure of hard rock always occurs when its working stress is far lower than the yield strength and compressive strength,the failure always directly related to the fracture propagation of discontinuities. Fracture propagation of discontinuities is the virtue of hard rock’s failure. We can research the rock mass discontinuous mechanical properties precisely by the methods of statistical analysis of discontinuities and Fracture Mechanics. According to Superposition Principle in Fracture Mechanics,A Problem or C Problem could be chosen to research. Problem A mainly calculates the crack-tip stress field and displacement field on internal discontinuities by numerical method. Problem C calculate the crack-tip stress field and displacement field under the assumption of that the mainly rock mass stress field has been known. So the Problem C avoid the complex mutual interference of stress fields of discontinuities,which is called crack system problem in Fracture Mechanics. To solve Problem C, field test on stress field in the rock mass is needed. The linear Superposition of discontinuities strain energies are Scientific and Rational. The difference of Fracture Mechanics between rock mass and other materials can mostly expression as:other materials Fracture Mechanics mostly face the problem A,and can’t avoid multi-crack puzzle, while the Rock mass Fracture Mechanics answer to the Problem C. Problem C can avoid multi-discontinuities mutual interference puzzle via the ground stress test. On the basis of Problem C, Fracture Mechanics could be used conveniently in rock mass. The rock mass statistics fracture constitutive relations, which introduced in this article, are based on the Problem C and the Discontinuity Strain Energy linear superposition. This constitutive relation has several merits: first, it is physical constitutive relation rather than empirical; second, it is very fit to describe the rock mass anisotropy properties; third, it elaborates the exogenous factors such as ground stress. The rock mass statistics fracture constitutive relation is the available approach to answer to the physical, anisotropic and ground stress impacted rock mass problems. This article stand on the foundation of predecessor’s statistics fractures constitutive relation, and improved the discontinuity distributive function. This article had derived the limitation of negative exponential distribution in the course of regression analysis, and advocated to using the two parameter negative exponential distribution for instead. In order to solve the problems of two-dimension stability on engineering key cross-sectional view in rock mass, this article derived the rock mass planar flexibility tensor, and established rock mass two-dimension penetrate statistics fracture constitutive relation on the basis of penetrate fracture mechanics. Based on the crack tip plasticity research production of penetrate fracture, for example the Irwin plasticity equifinality crack, this article established the way to deal with the discontinuity stress singularity and plastic yielding problem at discontinuity tip. The research on deformation parameters is always the high light region of rock mass mechanics field. After the dam foundation excavation of XiaoWan hydroelectric power station, dam foundation rock mass upgrowthed a great deal of unload cracks, rock mass mechanical property gotten intricacy and strong anisotropy. The dam foundation rock mass mostly upgrowthed three group discontinuities: the decantation discontinuity, the steep pitch discontinuity, and the schistosity plane. Most of the discontinuities have got partial unload looseness. In accordance with ground stress field data, the dam foundation stress field greatly non-uniform, which felled under the great impaction of tectonic stress field, self-weight stress field, excavation geometric boundary condition, and excavation, unload. The discontinuity complexity and stress field heterogeneity, created the rock mass mechanical property of dam foundation intricacy and levity. The research on the rock mass mechanics, if not take every respected influencing factor into consideration as best as we can, major errors likely to be created. This article calculated the rock mass elastic modulus that after Xiao Wan hydroelectric power station dam foundation gutter excavation finished. The calculation region covered possession monolith of Xiao Wan concrete double-curvature arch dam. Different monolith were adopted the penetrate fracture statistics constitutive relation or bury fracture statistics constitutive relation selectively. Statistics fracture constitutive relation is fit for the intensity anisotropy and heterogeneity rock mass of Xiao Wan hydroelectric power station dam foundation. This article had contrastive analysis the statistics fracture constitutive relation result with the inclined plane load test actual measurement elastic modulus and RMR method estimated elastic modulus, and find that the three methods elastic modulus have got greatly comparability. So, the statistics fracture constitutive relations are qualified for trust. Generally speaking,this article had finished following works based on predecessors job: “Argumentation the C Problems of superposition principle in Fracture Mechanics, establish two-dimension penetrate statistics fracture constitutive relation of rock mass, argue the negative exponential distribution limitation and improve it, improve of the three-dimension berry statistics fracture constitutive relation of rock mass, discontinuity-tip plastic zone isoeffect calculation, calculate the rock mass elastic modulus on two-dimension cross-sectional view”. The whole research clue of this article inherited from the “statistics rock mass mechanics” of Wu Faquan(1992).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Lukeqin arc belt is a compound structure generated by multi-movements and composed of 6 sub-structural zones, which are connected by Huoyanshan Mountain. General characteristics of the arc belt are multi-patterns of structure, multi-phases for petroleum, multi-types of trap and multi-layers for reservoirs. As a part of the eastern Lukeqin arc belt located on the south of Taibei depression, Lukeqin structural zone behaves as a complex faulted-fold zone, in which the formation and distribution of hydrocarbons are controlled by structures. As the dominant source of dynamics for the second migration of hydrocarbon, structure stress field is closely related with the potentials of hydrodynamics. Results derived from the simulations of stress field by finite element method indicate that the northwest tending faults prefer seal to the northeast tending ones. The reason is that the northwest tending faults were squeezed more strongly than the northeast tending ones. Therefor, the northeast tending faults become always the paths for oil to migrate southeastward. Lukeqin structural zone is the main site for oil to concentration because it is surrounded by high stress. Situated on the front of the foreland basin of Turpan-Hami, Lukeqing arc belt is a dam to hold back the southward migrating oil from Shengbei depression. The axis line of Shenquan-Shengnan-Yanmuxi, Lukeqin and Yubei controls the migrating paths and concentrating process of oil and gas. Results derived from stress simulation and structure analyses indicate consistently that both Yubei and Lukeqin structural zones are the favorite areas for oil to migrate. The generally southward paths for oil to migrate out of Taibei depression can be two ways. One of them is from Taibei depression to Yubei structural zone and the other is from Taibei depression to Lukeqin structural zone. By the both ways, oil migrated upward along the faults and southeastward along the structural axis to concentrate in either Permian or Triassic system. The newly ascertained path for oil migration, which is accurately southeastward instead of coarsely southward, indicates the directions for further explorations on the compound Lukeqin block zone. Five kinds of seal models of fault are all found in Lukeqin block zone by studying the seal features of faults occurred in the zone. Having studied the fault seal and their controlling factors by fuzzy set method, the paper deems that the northwest tended faults are better than the northeast tended ones for oil to concentrate. The most important factors to decide the seal extent of faults in this zone are the characteristics of main stress and fluids instead of capillary pressure differences between the two sides of fault and smear mud factors. There exist seal differences not only between the faults of different time but also between the sections within a fault due to the variation of depths, strata and positions. The general distribution rules of reservoirs were dominated by the seal characteristics of a fault during the time reservoirs formed. While the current features of fault seal decide the conservation of reservoirs and heights of oil accumulations. Seal or not of a fault is not absolute because the essential for fault to seal is the distribution of permeability of fault zone. Therefor, the multi cyclical activities of faults create the space-time variation of seal features of the fault. Totally, the seal extent of the faults within the area is not as perfect as to accumulate ordinary crude. Crude oil can only be sealed when it becomes viscous. Process for crude oil to become viscous and viscous happened strongly because of the fault-fold movements. Shallowly burying and even revealing of the objective layers of the reservoirs made the crude oil to be thickened by water washing biologically degradation and oxidation degradation. The northwestward deepening during or after the reservoir formation of the structural zone provided the power for oil to migrate one or more times. The main reason for oil accumulation is the formation of Lukeqin block zone during Xishanyao stage, middle Jurassic Period, Early Yanshanian Movement. While the main reason for reservoir conservation is the placidity of Triassic blocks after the formation of reservoirs. Contrasting to former opinions, it is concluded that the reservoirs in Lukeqin zone, including viscous reservoirs, were formed by one time but not more times. So the author proposes the opinion that the reservoirs of viscous oil were formed by viscous oil migration under the conditions of aptitude sets of fault seals controlled by fluid and other factors. To grope the distribution rules outside Taibei depression and discuss the formation mechanism of Anjurassic reservoirs, it is necessary to study the dominate factors for the formation of reservoirs in Lukeqin structural zone such as structural stress, fault seals and thickening mechanism of crude oil. Also, the necessary studies are the key to break through the Taibei depression and Anjurassic systems. Therefor, they are significant for the future exploration and reserve increasing of hydrocarbon within the Turpan-Hami basin. The paper studied the distribution rules of block reservoirs and forecasted the favorable zones for further exploration in Turpan-Hami basin. Conclusions can be useful for not only the exploration in the area but also the theory consult in the adjacent areas.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As a marginal subject, dynamic responses of slopes is not only an important problem of engineering geology (Geotechnical problem), but also of other subjects such as seismology, geophysics, seismic engineering and engineering seismic and so on. Owning to the gulf between different subjects, it is arduous to study dynamic responses of slopes and the study is far from ripeness. Studying on the dynamic responses of slopes is very important in theories as well as practices. Supported by hundreds of bibliographies, this paper systemically details the development process of this subject, introduces main means to analyze this subject, and then gives brief remarks to each means respectively. Engineering geology qualitative analysis is the base of slopes dynamic responses study. Because of complexity of geological conditions, engineering geology qualitative analysis is very important in slopes stability study, especially to rock slopes with complex engineering geology conditions. Based on research fruits of forerunners, this paper summarizes factors influencing slopes dynamic stability into five aspects as geology background, stratums, rock mass structure, and topography as well as hydrogeology condition. Based on rock mass structure controlling theory, engineering geology model of the slope is grouped into two typical classes, one is model with obvious controlling discontinuities, which includes horizontal bedded slope, bedding slope, anti-dip slope, slide as well as slope with base rock and weathered crust; the other is model without obvious controlling discontinuities, which includes homogeneous soil slope, joint rock mass slope. Study on slope failure mechanism under dynamic force, the paper concludes that there are two effects will appear in slope during strong earthquake, one is earthquake inertia force, the other is ultra pore pressure buildup. The two effects lead to failure of the slope. To different types of slope failure, the intensity of two effects acting on the slope is different too. To plastic flow failure, pore pressure buildup is dominant; to falling rock failure and toppling failure, earthquake inertia force is dominant in general. This paper briefly introduces the principle of Lagrangian element method. Through a lot of numerical simulations with FLAC3D, the paper comprehensively studies dynamic responses of slopes, and finds that: if the slope is low, displacement, velocity and acceleration are linear enlarging with elevation increasing in vertical direction; if the slope is high enough, displacement, velocity and acceleration are not linear with elevation any more, on the other hand, they fluctuate with certain rhythm. At the same time, the rhythm appears in the horizontal direction in the certain area near surface of the slope. The distribution form of isoline of displacement, velocity and acceleration in the section of the slope is remarkably affected by the slope angle. In the certain area near the slope surface, isoline of displacement, velocity and acceleration is parallel to the surface of the slope, in the mean time, the strike direction of the extreraum area is parallel to the surface of the slope too. Beyond this area, the isoline direction and the strike direction of the extremum area turn to horizontal with invariable distance. But the rhythm appearing or not has nothing to with the slope angle. The paper defines the high slope effect and the low slope effect of slopes dynamic responses, discusses the threshold height H^t of the dynamic high slope effect, and finds that AW is proportional to square root of the dynamic elastic moduli El P , at the same time, it is proportional to period Tof the dynamic input. Thus, the discriminant of H^t is achieved. The discriminant can tell us that to a slope, if its height is larger than one fifth of the wavelength, its response regular will be the dynamic high slope effect; on the other hand, its response regular will be the dynamic low slope effect. Based on these, the discriminant of different slopes taking on same response under the same dynamic input is put forward in this paper. At the same time, the paper studies distribution law of the rhythm extremum point of displacement, velocity and acceleration, and finds that there exists relationship of N = int among the slope height H, the number of the rhythm extremum VHlhro) point N and ffthre- Furthermore, the paper points out that if N^l, the response of the slope will be dynamic high slope effect; \fNdam planned in building in the world. However, deep fractures are well developed at the left abutment slope, so stability of the slope is a key engineering geological problem. The paper studies the dynamic stability of the slope. In the analysis, considering regional geology and regional seismology of the slope, combining with characteristics of the slope as well as the scale of the project, PGA(peak ground acceleration) of the site is decided (about 197.1cm/s2) by engineering seismology, and then the seismic input used in the slope dynamic analysis is determined. Comprehensive studies are carried out on the slope, especially to its deep fractures, and then the paper concludes that the deep fractures of slope are the result of the combination unloading effect of gravity and tectonic stress. At the same time, the failure model of the slope under dynamic input is attained. Based on these, the stability is comprehensively studied for section IV-IV with numerical simulation method as well as method putting forward in chapter 5. At last, the paper concludes that under dynamic input, the section will slide along fault f9, some deep fractures and fault/5 with certain permanent displacement, and this must be taken into consideration in the engineering.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Study of 3D visualization technology of engineering geology and its application to engineering is a cross subject which includes geosciences, computer, software and information technology. Being an important part of the secondary theme of National Basic Research Program of China (973 Program) whose name is Study of Multi-Scale Structure and Occurrence Environment of Complicated Geological Engineering Mass(No.2002CB412701), the dissertation involves the studies of key problems of 3D geological modeling, integrated applications of multi-format geological data, effective modeling methods of complex approximately layered geological mass as well as applications of 3D virtual reality information management technology.The main research findings are listed below:Integrated application method of multi-format geological data is proposed,which has solved the integrated application of drill holes, engineering geology plandrawings, sectional drawings and cutting drawings as well as exploratory trenchsketch. Its application can provide as more as possible fundamental data for 3Dgeological modeling.A 3D surface construction method combined Laplace interpolation points withoriginal points is proposed, so the deformation of 3D model and the crossing error ofupper and lower surface of model resulted from lack of data when constructing alaminated stratum can be eliminated.3D modeling method of approximately layered geological mass is proposed,which has solved the problems of general modeling method based on the sections or points and faces when constructing terrain and concordant strata.The 3D geological model of VII dam site of Xiangjiaba hydropower stationhas been constructed. The applications of 3D geological model to the auto-plotting ofsectional drawing and the converting of numerical analysis model are also discussed.3D virtual reality information integrated platform is developed, whose mostimportant character is that it is a software platform having the functions of 3D virtualreality flying and multi-format data management simultaneously. Therefore, theplatform can load different 3D model so as to satisfy the different engineeringdemands.The relics of Aigong Cave of Longyou Stone Caves are recovered. Thereinforcement plans of 1# and 2# cave in phoenix hill also be expressed. The intuitiveexpression provided decision makers and designers a very good environment.The basic framework and specific functions of 3D geological informationsystem are proposed.The main research findings in the dissertation have been successfully applied to some important engineering such as Xiangjiaba hydropower station, a military airport and Longyou Stone Caves etc.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Gaochentou region is located in the southwest direction of Gaochentou village in Huanghua city of Hebei province. In regionally structural position, It lies in Qikou sag In the middle part of Huanghua depression, which belongs to the east part of the south Dagang structure zone in the middle part of Huanghua depression. Its' very beneficial at regional structure in Gaochentou , and It becomes the advantage area for oil and gas gathered and preserved, Sandstone reservoir of Dongying Formation is main bearing bed .Dongying Formation in Gaochentou region of Huanghua depression is consisted of set of mudstone and sandstone interbeds by deposited delta fades . Dongying Formation can be divided into 3 members from above to below: the first member of Dongying Formation (FMDF), the second member of Dongying Formation (SMDF), and third member of Dongying Formation (TMDF). The lithology of the upper part of FMDF was consisted of mostly middle-grained and fine-grained sandstone, and it is small for the oil-bearing area of the sand bodies .The lithology of the lower part is coarse-grained sandstone bodies which are well connected between sandstone bodies of wells, and the lower part was main bed of oil production in Dongying Formation; SMDF and TMDF are consisted of larger scale set of mudstone, in which the sandbodies are lenticular and pinch out quickly, and the lithology was mostly fine sandstone and silt stone, in which there are little oil and gas .Because the reservoirs in this area are largely influenced by the factors such as lithology, fault and others, and the reservoirs have the strong,heterogeneity , there exists the problem of oil-down and water-up for vertical distribution of oil and gas bearing. It is not very clearly for the three dimension distribution of sandstone , and the geology researchs is not enough. So, it can't satisfy the need of further development and production for Gaochentou oilfield.Having the key problem of oil-down and water-up and the mechanism of the reservoir for Gaochentou area, There are as follow study works, the first, is study of the high-resolution correlation of sequence stratigraphy and sedimentary microfacies. Dongying Formation was divided into three parasequence sets and each parasequence set was divided into different amount of parasequences. FMDF, as the main oil and gas producing bed, can be divided into seven parasequences. Oil and gas are discovered in six parasequences except the seventh. On the basis of study of sedimentary microfacies, the sediments of Dongying Formation are considered deposited mainly in delta front subfacies. The microfacies types of Dongying Formation are sub-water distirbutary channel, sub-water natural bank, inter distributary channel bay, distributary channel mouth dam, and delta front mat sand.Seismic facies analysis and logging-constrained inversion technique were applied by Author for transverse prediction of sandstone reservoir. Having 4 modes of interwell single sandbodies correlation technique, Author have described distribution characteristics of sandbodies, and established geological reservoir model of Gaochentou reservoir.Author presented that the reservoirs characteristic have very strong heterogeneity ,and In the section of sandstone interlayed with mudstone,the folium sandstone interlayed with each other, and the wedge shaped sandbodies pinched out in the mudstone. So the pinch-out up sandstone trap and lenticular sandstone trap are easily formed. They are most small scale overlying pinches out in the place of slope. This article applies the concept of deep basin oil to resolve reasonably the problem of which the oil is below the water in Gaochentou area. Combined with the study of sedimentary facies, reservoir and other aspects, the mechanism and patterns of deep basin oil are studied on the basis of characteristics in Gaochentou area.On the basis of the above study, the mechanism of the oil and gas' migration and accumulation in isotropic sandstone and heterogeneous sandstone are thoroughly analyzed through experiments on physical modeling. Experiments on physical modeling show that the discrepancy between sand layers with different permeability and thickness has important influence on the direction, path, and injection layer of oil's migration. At the beginning of the injection of oil and gas in high permeability sand layer, the pressure is low, the migration resistance is small, and the oil and gas are more easily displacing the water in sand. So it can act as good transformation layer or reservoir. But at the beginning of the injection of oil and gas in sand layer with low permeability, the pressure is high, the migration resistance is big, and the oil and gas are more difficultly displacing the water in sand. So it can only act as bad or worse transformation layer or reservoir. Even if it cannot act as transformation layer or reservoir, it can act as water layer or dry layer. The discrepancy between sand layers on permeability and thickness can make discrepancy in injection of oil and gas between different layers. Consequently it leads to small amount of oil and gas injection in sand layers with low permeability. Ultimately it affects the oil's accumulation and distribution in different sand layers.At Last, combining analysis of the structure and pool forming condition, The thesis has established models of reservoir formation to predict the advantage distribution of oil and gas bearing , and put forward the prospective target It is not only of theoretical signification for explosion and importance, but also has realistic value in guiding the progressive petroleum exploration and exploitation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Guangxi Longtan Hydropower Station is not only a representative project of West Developing and Power Transmission from West to East in China, but also the second Hydropower Station to Three Gorges Project which is under construction in China. There are 770 X 104m3 creeping rock mass on the left bank slope in upper reaches, in which laid 9 water inlet tunnels and some underground plant buildings. Since the 435m high excavated slope threatens the security of the Dam, its deformation and stability is of great importance to the power station.Based on the Autodesk Map2004, Longtan Hydropower Station Monitoring Information System on Left Bank has been basically finished on the whole. Integrating the hydropower station monitoring information into Geographic Information System(GIS) environment, managers and engineers can dynamically gain the deformation information of the slop by query the symbols. By this means, designers can improve the correctness of analysis, and make a strategic and proper decision. Since the system is beneficial to effectively manage the monitoring-data, equitably save the cost of design and safe construction, and decrease the workload of the engineers, it is a successful application to the combination of hydropower station monitoring information management and computer information system technology.At the same time, on the basis of the geological analysis and rock mass toppling deformation and failure mechanism analysis of Longtan engineering left bank slope, the synthetic space-time analysis and influence factors analysis on the surface monitoring data and deep rock mass monitoring data of A-zone on left bank slope are carried on. It shows that the main intrinsic factor that effects the deformation of Zone A is the argillite limestone interbedding toppling structure, and its main external factors are rain and slope excavation. What's more, Degree of Reinforcement Demand(DRD) has been used to evaluate the slop reinforce effect of Zone A on left bank according to the Engineering Geomechanics-mate-Synthetics(EGMS). The result shows that the slop has been effective reinforced, and it is more stable after reinforce.At last, on the basis of contrasting with several forecast models, a synthetic forecast GRAV model has been presented and used to forecast the deformation of zone A on left bank in generating electricity period. The result indicates that GRAV model has good forecast precision, strong stability, and practical valuable reliability.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

稀土元素成矿与地壳的构造运动密切相关,稀土在中元古代具有大规模暴发性成矿特征。云南武定迤纳厂稀土铁铜矿床为昆阳群因民组出现稀土富集成矿的典型代表。本论文选择迤纳厂矿床为主要研究对象,系统研究矿床不同类型岩(矿)石和矿物的稀土元素地球化学特征,探讨富稀土的成矿流体、成矿物质来源和稀土元素成矿时代,揭示昆阳裂谷初期因民组稀土元素富集的地球化学机制。主要认识如下:1、迤纳厂矿床产于昆阳裂谷初期形成的禄丰一武定火山断陷盆地中。早中元古界昆阳群分布于绿汁江岩石圈断裂和小江一易门断裂的夹持地带,呈狭长状展布。迤纳厂矿床赋矿地层为昆阳群因民组上段的硅质白云岩和碱性火山岩(粗面安山岩)。矿体产出形态和矿石的结构构造等均显示矿体与赋矿地层同沉积特征;出现独立矿物氟碳饰矿、独居石及褐帘石,磷灰石、萤石、菱铁矿等矿物中也含有一定量的稀土,沿矿体走向和垂向稀土元素变化不大。2、矿体顶、底板围岩(石榴石黑云母片岩、钠长黑云母片岩等)的原岩为碱性火山岩(粗面安山岩),相对富集大离子亲石元素Ba、Cs、Rb、K、LRE日及贫Zr、Sr、Ti、Hf、HEE,为早元古代末期一中元古代早期交代富集地慢低程度部分熔融所形成的碱性火山岩。矿石稀土总量高(645-4443)×10-6,强烈富集轻稀土((La/Tb)N=17.3-81.1),稀土元素分布特征明显不同于矿区正常沉积的硅质白云岩和后期侵入的钠长石英斑岩及火山角砾岩,而与矿体顶、底板碱性火山岩中稀土元素配分特征基本一致,暗示稀土成矿物质来源与碱性火山岩有密切的关系;3、矿石中微量元素组合及变化特征与现代海底正在喷出的热液和热液沉积物中元素组合有较大的可比性,明显不同与火成碳酸岩型稀土矿床中的特征元素组合;在微量元素判别图解(Al-Fe-Mn、Fe/Ti-Al/(Al+Fe+Mn)、U-Th、Y-P2O5等)中,逸纳厂矿石均投影在热水沉积区,矿石的Y/Ho值与黑烟囱值接近,表明成矿流体为高温、还原性质,稀土成矿可能以热水沉积作用方式为主;4、对矿石中主要矿物萤石、菱铁矿、磁铁矿、石英、方解石的稀土元素特征研究表明,矿石沉积时不同矿物中稀土元素分布特征基本相同,主要受成矿流体中稀土分布特征制约。而后期变质作用形成的矿物,其稀土元素分布主要受矿物晶体结构控制。同期成矿流体从早期到晚期(块状矿石→条带状矿石),轻重稀土分异变小,稀土总量增加,条带状矿石中稀土含量最高;矿石黄铜矿6345值变化在一任3%0到2g%。范围,显示慢源硫特征;菱铁矿6r3C(8%-9.1%)、δ18O(-11.17%-15.37)‰指示成矿流体具岩浆来源和有机质的脱梭酸分解作用参与;成矿流体中稀土元素可能主要以(RE(CO3)3F)4-、(既(CO3)3F2)、(RE(F,Cl万等形式迁移,当温度降低时沉淀出氟碳饰矿等稀土矿物;5、矿石和萤石单矿物 Sm-Nd等时线年龄分别为1621士110Ma和15:38士43Ma,与矿区碱性火山岩错石的U-Pb年龄1676Ma、因民组顶部石英正长斑岩的错石U-P1。年龄1685Ma基本一致,也与因民组地层年龄1765M。较为接近,反映成矿时代为早元古代晚期和中元古代早期:这一时间也与一早元古代晚期一中元古代早期昆阳裂谷初始裂陷阶段,大量来自于地幔的碱性火山岩喷发事件相吻合。矿石。Nd(t):-2.87-3.60,萤石单矿物εNd(t):-3.93-5.90,变化范围较窄并全为负值,接近0,指示源区为富集地幔。同时结合矿床形成的构造一地质环境及矿体产出的地质形态,认为逛纳厂稀土铁铜矿床可能是在昆阳裂谷初期,在碱性火山岩浆喷发的间歇期,来自地幔富稀土、挥发份的成矿流体由火山喷流一同生沉积方式形成的矿床。6、昆阳群因民组地层中出现的稀土富集、成矿与我国的白云鄂博稀土REE-Fe-Nb超大型矿一床和澳大利亚的olympic Dam Cu-U-Au-Ag-REE超大型矿床,在成矿时代、产出大地构造背景、成矿物质来源等方面具有较大的相似性,均体现成矿受控于中元古代1.5Ga超大陆聚合前或随后裂解初始阶段伴随的非造山型碱性岩浆或热液作用,稀土来源于超大陆拼合前因板块俯冲交代而形成的富集地幔。

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Wylleman, P., Alfermann, D., Lavallee, D. (2004). Career transitions in sport: European perspectives. Psychology of Sport and Exercise, 5 (1), 7-20 RAE2008

Relevância:

10.00% 10.00%

Publicador:

Resumo:

North, J., Lavallee, D., An investigation of potential users of career transition services in the United Kingdom, Psychology of Sport and Exercise, Vol. 5, No. 1. (January 2004), pp. 77-84. RAE2008

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Wydział Filologii Polskiej i Klasycznej: Instytut Filologii Polskiej

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monografia apresentada à Universidade Fernando Pessoa como parte dos requisitos para obtenção do grau de Licenciada em Medicina Dentária

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As the economic burden of HIV/AIDS increases in sub-Saharan Africa, the allocation of the burden among levels and sectors of societies is changing. The private sector has greater scope than government, households, or NGOs to avoid the economic burden of AIDS, and a systematic shifting of the burden away from the private sector is underway. Common practices that shift the AIDS burden from businesses to households and government include pre-employment screening, reduced employee benefits, restructured employment contracts, outsourcing of less skilled jobs, selective retrenchments, and changes in production technologies. In South Africa, more than two thirds of large employers have reduced health care benefits or required larger contributions by employees. Most firms have replaced defined benefit retirement funds, which expose the firm to large annual costs but provide long-term support for families, with defined contribution funds, which eliminate firm risk but provide little to families of younger workers who die of AIDS. Contracting out of previously permanent jobs also shields firms from costs while leaving households and government to care for affected workers and their families. Many of these changes are responses to globalization and would have occurred in the absence of AIDS, but they are devastating for employees with HIV/AIDS. This paper argues that the shifting of the economic burden of AIDS is a predictable response by business to which a thoughtful public policy response is needed. Countries should make explicit decisions about each sector’s responsibilities if a socially desirable allocation is to be achieved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Ecological concern prompts poor and indigenous people of India to consider how a society can ensure both protection of nature and their rightful claim for a just and sustainable future. Previous discussions defended the environment while ignoring the struggles of the poor for sustenance and their religious traditions and ethical values. Mohandas Karamchand Gandhi addressed similar socio-ecological concerns by adopting and adapting traditional religious and ethical notions to develop strategies for constructive, engaged resistance. The dissertation research and analysis verifies the continued relevance of the Gandhian understanding of dharma (ethics) in contemporary India as a basis for developing eco-dharma (eco-ethics) to link closely development, ecology, and religious values. The method of this study is interpretive, analytical, and critical. Françoise Houtart’s social analytical method is used to make visible and to suggest how to overcome social tensions from the perspective of marginalized and exploited peoples in India. The Indian government's development initiatives create a nexus between the eco-crisis and economic injustice, and communities’ responses. The Chipko movement seeks to protect the Himalayan forests from commercial logging. The Narmada Bachao Andolan strives to preserve the Narmada River and its forests and communities, where dam construction causes displacement. The use of Gandhian approaches by these movements provides a framework for integrating ecological concerns with people's struggles for survival. For Gandhi, dharma is a harmony of satya (truth), ahimsa (nonviolence), and sarvodaya (welfare of all). Eco-dharma is an integral, communitarian, and ecologically sensitive ethical paradigm. The study demonstrates that the Gandhian notion of dharma, implemented through nonviolent satyagraha (firmness in promoting truth), can direct community action that promotes responsible economic structures and the well-being of the biotic community and the environment. Eco-dharma calls for solidarity, constructive resistance, and ecologically and economically viable communities. The dissertation recommends that for a sustainable future, India must combine indigenous, appropriate, and small- or medium-scale industries as an alternative model of development in order to help reduce systemic poverty while enhancing ecological well-being.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this research, we aim to develop a conceptual framework to assess the entrepreneurial properties of the Vietnamese reform, known as Doi Moi, even before the kickoff of Doi Moi policy itself. We argued that unlike many other scholars’ assertion, economic crisis and harsh realities were neither necessary nor sufficient conditions for the reform to take place, but the entrepreurial elements and undertaking were, at least for case of Vietnam’s reform. Entrepreneurial process on the one hand sought for structural changes, kicked off innovation, and on the other its induced outcome further invited changes and associated opportunities. The paper also concludes that an assessment of possibility for the next stage of Doi Moi in should take into account the entrepreneurial factors of the economy, and by predicting the emergence of new entrepreneurial facets in the next phase of economic development.