853 resultados para termination of contract mining concession
Resumo:
Available [in Spanish] at: http://www.cepal.org/cgi-bin/getProd.asp?xml=/publicaciones/xml/0/23120/P23120.xml&xsl=/comercio/tpl/p9f.xsl&base=/tpl/top-bottom.xslt
Resumo:
Discusses the termination of desegregation decrees and the elusive meaning of unitary status, first introducing the topic and then covering Jenkins III and providing an overview of desegregation scholarship including discretion, capacity, and legitima. Also discusses the evolution of equity, including English equity, American equity, and equity and desegregation. Explores the concepts of relevant rights and interests, focusing on Hohfeld, the interest theory of rights, and the application of the rights theory. The conclusion posits that what remains is a complicated and confused desegregation jurisprudence, and that the lines that separate desegregation from integration from diversity, if there ever were such lines, are blurring. A discussion of the theoretical premises underlying desegregation appears to continue to be necessary.
Resumo:
This thesis analyses problems related to the applicability, in business environments, of Process Mining tools and techniques. The first contribution is a presentation of the state of the art of Process Mining and a characterization of companies, in terms of their "process awareness". The work continues identifying circumstance where problems can emerge: data preparation; actual mining; and results interpretation. Other problems are the configuration of parameters by not-expert users and computational complexity. We concentrate on two possible scenarios: "batch" and "on-line" Process Mining. Concerning the batch Process Mining, we first investigated the data preparation problem and we proposed a solution for the identification of the "case-ids" whenever this field is not explicitly indicated. After that, we concentrated on problems at mining time and we propose the generalization of a well-known control-flow discovery algorithm in order to exploit non instantaneous events. The usage of interval-based recording leads to an important improvement of performance. Later on, we report our work on the parameters configuration for not-expert users. We present two approaches to select the "best" parameters configuration: one is completely autonomous; the other requires human interaction to navigate a hierarchy of candidate models. Concerning the data interpretation and results evaluation, we propose two metrics: a model-to-model and a model-to-log. Finally, we present an automatic approach for the extension of a control-flow model with social information, in order to simplify the analysis of these perspectives. The second part of this thesis deals with control-flow discovery algorithms in on-line settings. We propose a formal definition of the problem, and two baseline approaches. The actual mining algorithms proposed are two: the first is the adaptation, to the control-flow discovery problem, of a frequency counting algorithm; the second constitutes a framework of models which can be used for different kinds of streams (stationary versus evolving).
Resumo:
While the 1913-1914 copper country miners’ strike undoubtedly plays an important role in the identity of the Keweenaw Peninsula, it is worth noting that the model of mining corporations employing large numbers of laborers was not a foregone conclusion in the history of American mining. Between 1807 and 1847, public mineral lands in Missouri, in the Upper Mississippi Valley, and along the southern shore of Lake Superior were reserved from sale and subject to administration by the nation’s executive branch. By decree of the federal government, miners in these regions were lessees, not landowners. Yet, in the Wisconsin lead region especially, federal authorities reserved for independent “diggers” the right to prospect virtually unencumbered. In doing so, they preserved a comparatively egalitarian system in which the ability to operate was determined as much by luck as by financial resources. A series of revolts against federal authority in the early nineteenth century gradually encouraged officers in Washington to build a system in the copper country in which only wealthy investors could marshal the resources to both obtain permits and actually commence mining operations. This paper will therefore explore the role of the federal government in establishing a leasing system for public mineral lands in the years previous to the California Gold Rush, highlighting the development of corporate mining which ultimately set a stage for the wave of miners’ strikes in the late nineteenth and early twentieth centuries.
Resumo:
Implantable Cardioverter Defibrillator (ICD) implantation is the only established therapy for primary or secondary prevention of sudden cardiac death in patients with Hypertrophic Cardiomyopathy (HCM). Ineffectiveness of shock therapy for the termination of potentially fatal ventricular arrhythmias in ICD recipients is rare in the presence of appropriate arrhythmia detection by the device. We report the case of a 48-year-old woman with HCM and a single chamber ICD, who received five inefficient high-energy (35 Joules) shocks for the termination of an appropriately detected episode of Ventricular Tachycardia (VT). The episode was safely terminated with a subsequent application of Antitachycardia Pacing (ATP) by the device. At the following ICD control, an acceptable defibrillation threshold was detected.
Resumo:
Deregulation strategies and their regulating effects: The case of the termination of Social Assistance for rejected asylum seekers in Switzerland. In Switzerland, rejected asylum seekers no longer have any residence rights. In 2003 the Swiss state decided to terminate the so far granted social assistance for people with a non-entry decision on their asylum request. In 2008 the termination of social assistance was expanded to all rejected asylum seekers. Nevertheless, facing the impossibility of deporting them, the Swiss state entitled this group of people to emergency assistance. It is a basic, which is stated in the Swiss Federal constitution. In this context, new structures were established specially for rejected asylum seekers. These structures had to be set up, financed, controlled, managed and legitimized. For example, collective centres were set up exclusively for rejected asylum seekers. In this speech, I want to analyze the political and bureaucratic process of terminating social assistance for rejected asylum seekers. The exclusion of rejected asylum seekers from social aid was embedded in a wider austerity program of the Federal State. The Federal Migration Office had been requested to save money. The main official goal was to reduce the support of these illegalized people, reduce any structures that would prolong their stay on Swiss ground and to set incentives so that they would leave the country on their own. But during the implementation, new regulating effects emerged. Drawing on ethnographic material, I will highlight these “messy procedures” (Sciortino 2004). First, I will analyze the means and goals developed by the Federal authorities while conceptualising the termination of social assistance. Second, I will focus on the new built structures and elaborate the practices and legitimating strategies of the authorities. As a conclusion, I will analyze the ambivalences of these processes which, at the end, established specific structures for the “unwanted”.
Resumo:
BACKGROUND -This study aimed to determine five-year efficacy of catheter ablation for persistent atrial fibrillation (PsAF) using AF termination as a procedural endpoint. METHODS AND RESULTS -150 patients (57±10 years) underwent PsAF ablation using a stepwise ablation approach (pulmonary vein isolation, electrogram-guided and linear ablation) with the desired procedural endpoint being AF termination. Repeat ablation was performed for recurrent AF or atrial tachycardia (AT). AF was terminated by ablation in 120 patients (80%). Arrhythmia-free survival rates after a single procedure were 35.3±3.9%, 28.0±3.7%, and 16.8±3.2% at 1, 2, and 5 years, respectively. Arrhythmia-free survival rates after the last procedure (mean 2.1±1.0 procedures) were 89.7±2.5%, 79.8±3.4%, and 62.9±4.5%, at 1, 2, and 5 years, respectively. During a median follow-up of 58 (IQR 43-73) months following the last ablation procedure, 97 of 150 (64.7%) patients remained in sinus rhythm without antiarrhythmic drugs (AADs). Another 14 (9.3%) patients maintained sinus rhythm after re-initiation of AADs, and an additional 15 (10.0%) patients regressed to paroxysmal recurrences only. Failure to terminate AF during the index procedure (HR 3.831; 95%CI: 2.070-7.143; p<0.001), left atrial diameter ≥50mm (HR 2.083; 95%CI: 1.078-4.016; p=0.03), continuous AF duration ≥18 months (HR 1.984; 95%CI: 1.024-3.846; p<0.04) and structural heart disease (HR 1.874; 95% CI: 1.037-3.388; p=0.04) predicted arrhythmia recurrence. CONCLUSIONS -In patients with PsAF, an ablation strategy aiming at AF termination is associated with freedom from arrhythmia recurrence in the majority of patients over a 5-year follow up period.Procedural AF non-termination and specific baseline factors predict long-term outcome after ablation.
Resumo:
In heart, a robust regulatory mechanism is required to counteract the regenerative Ca2+-induced Ca2+ release from the sarcoplasmic reticulum. Several mechanisms, including inactivation, adaptation, and stochastic closing of ryanodine receptors (RyRs) have been proposed, but no conclusive evidence has yet been provided. We probed the termination process of Ca2+ release by using a technique of imaging local Ca2+ release, or “Ca2+ spikes”, at subcellular sites; and we tracked the kinetics of Ca2+ release triggered by L-type Ca2+ channels. At 0 mV, Ca2+ release occurred and terminated within 40 ms after the onset of clamp pulses (0 mV). Increasing the open-duration and promoting the reopenings of Ca2+ channels with the Ca2+ channel agonist, FPL64176, did not prolong or trigger secondary Ca2+ spikes, even though two-thirds of the sarcoplasmic reticulum Ca2+ remained available for release. Latency of Ca2+ spikes coincided with the first openings but not with the reopenings of L-type Ca2+ channels. After an initial maximal release, even a multi-fold increase in unitary Ca2+ current induced by a hyperpolarization to −120 mV failed to trigger additional release, indicating absolute refractoriness of RyRs. When the release was submaximal (e.g., at +30 mV), tail currents did activate additional Ca2+ spikes; confocal images revealed that they originated from RyRs unfired during depolarization. These results indicate that Ca2+ release is terminated primarily by a highly localized, use-dependent inactivation of RyRs but not by the stochastic closing or adaptation of RyRs in intact ventricular myocytes.
Resumo:
The irreversible proteolytic mechanism by which protease-activated receptor-1 (PAR1), the G protein-coupled receptor (GPCR) for thrombin, is activated raises the question of how it is shut off. Like classic GPCRs, activated PAR1 is rapidly phosphorylated and internalized, but unlike classic GPCRs, which recycle, internalized PAR1 is sorted to lysosomes. A chimeric PAR1 bearing the substance P receptor’s cytoplasmic carboxyl tail sequestered and recycled like wild-type substance P receptor. In cells expressing this chimera, signaling in response to the PAR1-activating peptide SFLLRN ceased as expected upon removal of this agonist. Strikingly, however, when the chimera was activated proteolytically by thrombin, signaling persisted even after thrombin was removed. This persistent signaling was apparently due to “resignaling” by previously activated receptors that had internalized and recycled back to the cell surface. Thus the cytoplasmic carboxyl tail of PAR1 specifies an intracellular sorting pattern that is linked to its signaling properties. In striking contrast to most GPCRs, sorting of activated PAR1 to lysosomes rather than recycling is critical for terminating PAR1 signaling—a trafficking solution to a signaling problem.
Resumo:
The replication terminator protein (RTP) of Bacillus subtilis causes polar fork arrest at replication termini by sequence-specific interaction of two dimeric proteins with the terminus sequence. The crystal structure of the RTP protein has been solved, and the structure has already provide valuable clues regarding the structural basis of its function. However, it provides little information as to the surface of the protein involved in dimer-dimer interaction. Using site-directed mutagenesis, we have identified three sites on the protein that appear to mediate the dimer-dimer interaction. Crystallographic analysis of one of the mutant proteins (Y88F) showed that its structure is unaltered when compared to the wild-type protein. The locations of the three sites suggested a model for the dimer-dimer interaction that involves an association between two beta-ribbon motifs. This model is supported by a fourth mutation that was predicted to disrupt the interaction and was shown to do so. Biochemical analyses of these mutants provide compelling evidence that cooperative protein-protein interaction between two dimers of RTP is essential to impose polar blocks to the elongation of both DNA and RNA chains.
Resumo:
All transcription terminators for RNA polymerase I (pol I) that have been studied so far, ranging from yeast to humans, require a specific DNA binding protein to cause termination. In yeast, this terminator protein has been identified as Reb1p. We now show that, in addition to the binding site for Reb1p, the yeast pol I terminator also requires the presence of a T-rich region coding for the last 12 nucleotides of the transcript. Reb1p cooperates with this T-rich element, both to pause the polymerase and to effect release of the transcript. These findings have implications for the termination mechanism used by all three nuclear RNA polymerases, since all three are known to pause at this terminator.
Resumo:
Early project termination is one of the most difficult decisions to be made by Research and Development managers. While there is the risk of terminating good projects, there is also the opposite risk of not terminating bad projects and overspend resources in unproductive research. Criteria used for identifying these projects are common subject of research in Business Administration. In addition, companies might take important lessons from its interrupted projects that could improve their overall portfolio technical and commercial success. Finally, the set and weight of criteria, as well as the procedures companies use for achieve learning from cancelled projects may vary depending on the project type. This research intends to contribute to the understanding of policies applied to projects that were once considered attractive, but by some reason is not appreciated anymore. The research addressed the question: How companies deal with projects that become unattractive? More specifically, this research tried to answer the following questions: (1) Are projects killed or (otherwise) they die naturally by lack of resources? (2) What criteria are used to terminate projects during development? (3) How companies learn from the terminated projects to improve the overall portfolio performance? (4) Are the criteria and learning procedures different for different types of projects? In order to answer these questions, we performed a multiple case study with four companies that are reference in business administration and innovation: (1) Oxiteno, considered the base case, (2) Natura, the literal replication, (3) Mahle and (4) AES, the theoretical replications. The case studies were performed using a semi-structured protocol for interviews, which were recorded and analyzed for comparison. We found that the criteria companies use for selecting projects for termination are very similar to those anticipated by the literature, except for a criteria related to compliance. We have evidences to confirm that the set of criteria is not altered when dealing with different project types, however the weight they are applied indeed varies. We also found that learning with cancelled projects is yet very incipient, with very few structured formal procedures being described for capturing learning with early-terminated projects. However, we could observe that these procedures are more common when dealing with projects labeled as innovative, risky, big and costly, while those smaller and cheaper derivative projects aren\'t subject of a complete investigation on the learning they brought to the company. For these, the most common learning route is the informal, where the project team learns and passes the knowledge though interpersonal information exchange. We explain that as a matter of cost versus benefit of spending time to deeply investigate projects with little potential to bring new knowledge to the project team and the organization