936 resultados para harbour operations
Resumo:
A t the request of the Iowa State Highway Commission, the Engineering Research Institute observed the traffic operations at the Interstate 29 (1-29) and Interstate 80 (1-80) interchange in the southwest part of Council Bluffs. The general location of the site is shown in Figure 1. Before limiting the analysis to the diverging area the project staff drove the entire Council Bluffs freeway system and consulted with M r . Philip Hassenstab (Iowa State Highway Commission, District 4, Resident Maintenance Engineer at Council Bluffs). The final study scope was delineated as encompassing only the operational characteristics of the diverge area where 1-29 South and 1-80 East divide and the ramp to merge area where 1-80 West joins 1-29 North (both areas being contained within the aforementioned interchange). Supplementing the traffic operations scope, was an effort to delineate and document the applicability of video-tape techniques to traffic engineering studies and analyses. Documentation was primarily in the form of a demonstration video-tape.
Resumo:
Summary
Resumo:
Audit report on the Honey Creek Resort Operations Account maintained by Central Group Management, LLC for the year ended June 30, 2011
Resumo:
The objective of this research was to investigate the application of integrated risk modeling to operations and maintenance activities, specifically moving operations, such as pavement testing, pavement marking, painting, snow removal, shoulder work, mowing, and so forth. The ultimate goal is to reduce the frequency and intensity of loss events (property damage, personal injury, and fatality) during operations and maintenance activities. This report includes a literature review that identifies the current and common practices adopted by different state departments of transportation (DOTs) and other transportation agencies for safe and efficient highway operations and maintenance (O/M) activities. The final appendix to the report includes information for eight innovative O/M risk mitigation technologies/equipment and covers the following for these technologies/equipment: Appropriate conditions for deployment Performance/effectiveness, depending on hazard/activity Cost to purchase Cost to operate and maintain Availability (resources and references)
Resumo:
Audit report on the Operations Account of Honey Creek Resort, Moravia, Iowa as of and for the year ended June 30, 2012
Resumo:
Audit report on the Honey Creek Resort Operations Account maintained by Central Group Management, LLC for the year ended June 30, 2012
Resumo:
Report on a review of the operations of the Poweshiek County Sheriff’s Office for the period January 1, 2010 through March 31, 2013
Resumo:
Audit report on the Honey Creek Resort Operations Account maintained by Central Group Management, LLC for the year ended June 30, 2013
Resumo:
One of the more severe winter hazards is ice or compacted snow on roadways. While three methods are typically used to combat ice (salting, sanding and scraping), relatively little effort has been applied to improve methods of scraping ice from roads. In this project, a new test facility has been developed, comprising a truck with an underbody blade, which has been instrumented such that the forces to scrape ice from a pavement can be measured. A test site has been used, which is not accessible to the public, and ice covers have been sprayed onto the pavement and subsequently scraped from it, while the scraping loads have been recorded. Three different cutting edges have been tested for their ice scraping efficiency. Two of the blades are standard (one with a carbide insert, the other without) while the third blade was designed under the SHRP H-204A project. Results from the tests allowed two parameters to be identified. The first is the scraping efficiency which is the ratio of vertical to horizontal force. The lower this ratio, the more efficiently ice is being removed. The second parameter is the scraping effectiveness, which is related (in some as yet unspecified manner) to the horizontal load. The higher the horizontal load, the more ice is being scraped. The ideal case is thus to have as high a horizontal load as possible, combined with the lowest possible vertical load. Results indicate that the SHRP blade removed ice more effectively than the other two blades under equivalent conditions, and furthermore, did so with greater efficiency and thus more control. Furthermore, blade angles close to 0 deg provide for the most efficient scraping for all three blades. The study has shown that field testing of plow blades is possible in controlled situations, and that blades can be evaluated using this system. The system is available for further tests as are deemed appropriate.
Resumo:
OBJECTIVE: We sought to study the epidemiologic and medical aspects of alpine helicopter rescue operations involving the winching of an emergency physician to the victim. METHODS: We retrospectively reviewed the medical and operational reports of a single helicopter-based emergency medical service. Data from 1 January 2003 to 31 December 2008 were analysed. RESULTS: A total of 921 patients were identified, with a male:female ratio of 2:1. There were 56 (6%) patients aged 15 or under. The median time from emergency call to helicopter take-off was 7 min (IQR = 5-10 min). 840 (91%) patients suffered from trauma-related injuries, with falls from heights during sports activities the most frequent event. The most common injuries involved the legs (246 or 27%), head (175 or 19%), upper limbs (117 or 13%), spine (108 or 12%), and femur (66 or 7%). Only 81 (9%) victims suffered from a medical emergency, but these cases were, when compared to the trauma victims, significantly more severe according to the NACA index (p<0.001). Overall, 246 (27%) patients had a severe injury or illness, namely, a potential or overt vital threat (NACA score between 4 and 6). A total of 478 (52%) patients required administration of major analgesics: fentanyl (443 patients or 48%), ketamine (42 patients or 5%) or morphine (7 patients or 1%). The mean dose of fentanyl was 188 micrograms (range 25-750, SD 127). Major medical interventions such as administration of vasoactive drugs, intravenous perfusions of more than 1000 ml of fluids, ventilation or intubation were performed on 39 (4%) patients. CONCLUSIONS: The severity of the patients' injuries or illnesses along with the high proportion of medical procedures performed directly on-site validates emergency physician winching for advanced life support procedures and analgesia.
Resumo:
Report on a review of the operations of certain departments of the University of Iowa Hospitals and Clinics for the period July 1, 2010 through December 31, 2012
Resumo:
"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 2 - Construction and Maintenance Operations and Reporting. This module provides hands on examples of applications of metric measurements in the construction and maintenance field operations.