964 resultados para cable rating
Resumo:
A new method was developed for breaking high strength prestressed cable. The old method used an aluminum oxide grit packed into a special gripping jaw. The new method uses aluminum shims wrapped around the cable and then is gripped with a V-grip. The new method gives nearly 100% "good breaks" on the cable compared to approximately 10% good breaks with the old method. In addition, the new cable breaking method gives higher ultimate tensile strengths, is more reproducible, is quicker, cleaner and easier on equipment.
Resumo:
The goal of this project was to provide an objective methodology to support public agencies and railroads in making decisions related to consolidation of at-grade rail-highway crossings. The project team developed a weighted-index method and accompanying Microsoft Excel spreadsheet based tool to help evaluate and prioritize all public highway-rail grade crossings systematically from a possible consolidation impact perspective. Factors identified by stakeholders as critical were traffic volume, heavy-truck traffic volume, proximity to emergency medical services, proximity to schools, road system, and out-of-distance travel. Given the inherent differences between urban and rural locations, factors were considered, and weighted, differently, based on crossing location. Application of a weighted-index method allowed for all factors of interest to be included and for these factors to be ranked independently, as well as weighted according to stakeholder priorities, to create a single index. If priorities change, this approach also allows for factors and weights to be adjusted. The prioritization generated by this approach may be used to convey the need and opportunity for crossing consolidation to decision makers and stakeholders. It may also be used to quickly investigate the feasibility of a possible consolidation. Independently computed crossing risk and relative impact of consolidation may be integrated and compared to develop the most appropriate treatment strategies or alternatives for a highway-rail grade crossing. A crossing with limited- or low-consolidation impact but a high safety risk may be a prime candidate for consolidation. Similarly, a crossing with potentially high-consolidation impact as well as high risk may be an excellent candidate for crossing improvements or grade separation. The results of the highway-rail grade crossing prioritization represent a consistent and quantitative, yet preliminary, assessment. The results may serve as the foundation for more rigorous or detailed analysis and feasibility studies. Other pertinent site-specific factors, such as safety, maintenance costs, economic impacts, and location-specific access and characteristics should be considered.
Resumo:
Eighteen patients with acetabular fractures, with a mean age of 76 years, were treated with cable fixation and acute total hip arthroplasty. Nine were T-shaped fractures, 4 associated transverse and posterior wall, 2 transverse, 2 posterior column and posterior wall, and 1 anterior and posterior hemitransverse fractures. One patient experienced 3 episodes of hip dislocation within 10 months after surgery. All the others had a good outcome at a mean follow-up time of 36 months. Radiographic assessment showed healing of the fracture and a satisfactory alignment of the cup without loosening. This option provides good primary fixation, stabilizes complex acetabular fractures in elderly patients, and permits early postoperative mobilization.
Resumo:
Rapid assessment methods are valuable tools for collecting information about the quality and status of natural systems. However, they are not a substitute for detailed surveys of those systems. Users of this method should consider that the method may under-score or over-score the site that’s assessed, especially when the site is not a typical fen (i.e. a sedge meadow could score lower than fens, but in-fact be a relatively high quality sedge meadow). This assessment can be used throughout most of the spring, summer and fall period, however the ideal “index period” would be from late May through early October when native plant communities, as well as invasive species, are most apparent.
Resumo:
This main report provides a general discussion of the load testing, structural evaluation, and load rating procedures. Specific details for each bridge are provided in individual report sections. Additional supporting information on load testing, analyses, and load rating are also provided in the attached appendices.
Resumo:
Nowadays typical motor junction boxes do not incorporate cable glands, which would provide good electrical performance interms of electromagnetic compatibility. In this paper, a manufacturability and assembly analysis for the new construction of a rigid body feeder cable junction of an electric motor is presented especially for converter drives (practical tests were carried out at LUT during 2007). Although the cable junction should also clamp the cable to provide enough tensile strength, the phase conductors should not get squashed by the groundingconnection. In order to ensure good performance in an electrical mean especially in converter drives, the grounding of the cable should be connected 360 degrees around the cable. In this paper, following manufacturing technologies are discussed: traditional turning, precision and centrifugal casting, and rotation moulding. DFM(A)-aspects are presented in detail.
Resumo:
Main concepts : The Grades of Recommendation, Assessment, Development, and Evaluation (GRADE) approach defines quality of evidence as confidence in effect estimates; this conceptualization can readily be applied to bodies of evidence estimating the risk of future of events (that is, prognosis) in broadly defined populations In the field of prognosis, a body of observational evidence (including single arms of randomized controlled trials) begins as high quality evidence. The five domains GRADE considers in rating down confidence in estimates of treatment effect-that is, risk of bias, imprecision, inconsistency, indirectness, and publication bias-as well as the GRADE criteria for rating up quality, also apply to estimates of the risk of future of events from a body of prognostic studies Applying these concepts to systematic reviews of prognostic studies provides a ful approach to determine confidence in estimates of overall prognosis in broad populations.
Resumo:
The demand for electricity is constantly growing in contemporary world and, in the same time, quality and reliability requirements are becoming more rigid. In addition, renewable sources of energy have been widely introduced for power generation, and they create specific challenges for the network. Consequently, new solution for distribution system is required, and Low Voltage Direct Current (LVDC) system is the proposed one. This thesis focuses on the investigation of specific cable features for low voltage direct current (LVDC) distribution system. The LVDC system is public ±750 VDC distribution system, which is currently being developed at Lappeen-ranta University of Technology. The aspects, considered in the thesis, are reliable and economic power transmission in distribution networks and possible power line communication in the LVDC cable.
Resumo:
The aim of this master’s thesis is to develop an algorithm to calculate the cable network for heat and power station CHGRES. This algorithm includes important aspect which has an influence on the cable network reliability. Moreover, according to developed algorithm, the optimal solution for modernization cable system from economical and technical point of view was obtained. The conditions of existing cable lines show that replacement is necessary. Otherwise, the fault situation would happen. In this case company would loss not only money but also its prestige. As a solution, XLPE single core cables are more profitable than other types of cable considered in this work. Moreover, it is presented the dependence of value of short circuit current on number of 10/110 kV transformers connected in parallel between main grid and considered 10 kV busbar and how it affects on final decision. Furthermore, the losses of company in power (capacity) market due to fault situation are presented. These losses are commensurable with investment to replace existing cable system.
Resumo:
Tämän tutkimusraportin suomenkielinen versio on osoitteessa: http://urn.fi/URN:ISBN:978-951-29-4509-2
Resumo:
Understanding hydrosedimental behavior of a watershed is essential for properly managing and using its hydric resources. The objective of this study was to verify the feasibility of the alternative procedure for the indirect determination of the sediment key curve using a turbidimeter. The research was carried out on the São Francisco Falso River, which is situated in the west of the state of Paraná on the left bank of ITAIPU reservoir. The direct method was applied using a DH-48 sediment suspended sampler. The indirect method consisted of the use of a linigraph and a turbidimeter. Based on the results obtained, it was concluded that the indirect method using a turbidimeter showed to be fully feasible, since it gave a power function-type mathematical model equal of the direct method. Furthermore, the average suspended sediment discharge into the São Francisco Falso River during the 2006/2007 harvest was calculated at 7.26 metric t day-1.
Sovereign Credit Rating Announcements and Equity Market Response: Evidence from the European Markets
Resumo:
This thesis examines the equity market reactions on credit rating announcements. The study covers 12 European countries during the period of 2000-2012. By using an event study methodology and daily collected stock market returns, the impact of the sovereign credit rating announcements to national stock indices is examined. The thesis finds evidence for the rating downgrades having a statistically significant negative effect on the stock markets. This finding is in line with earlier literature (see Brooks, 2004). The paper also discusses whether the changes in the sovereign credit ratings are contagious, anticipated by the market, and persistent. There is some evidence found for the contagion effects in case of downgrades, but not for upgrades. Markets seem to anticipate rating upgrades, but not downgrades. In addition, market´s reaction towards rating announcements seems not to be persistent.