Estimation of existing cable systems in generator-busbar unit and choice the optimal solution for its modernization


Autoria(s): Dzhusupova, Rimma
Data(s)

23/06/2010

23/06/2010

2010

Resumo

The aim of this master’s thesis is to develop an algorithm to calculate the cable network for heat and power station CHGRES. This algorithm includes important aspect which has an influence on the cable network reliability. Moreover, according to developed algorithm, the optimal solution for modernization cable system from economical and technical point of view was obtained. The conditions of existing cable lines show that replacement is necessary. Otherwise, the fault situation would happen. In this case company would loss not only money but also its prestige. As a solution, XLPE single core cables are more profitable than other types of cable considered in this work. Moreover, it is presented the dependence of value of short circuit current on number of 10/110 kV transformers connected in parallel between main grid and considered 10 kV busbar and how it affects on final decision. Furthermore, the losses of company in power (capacity) market due to fault situation are presented. These losses are commensurable with investment to replace existing cable system.

Identificador

http://www.doria.fi/handle/10024/63032

Idioma(s)

en

Palavras-Chave #power losses #thermal impulses #short circuit calculation #power cables, reliability
Tipo

Master's thesis

Diplomityö