998 resultados para VLSI implementation
Resumo:
The rising problems associated with construction such as decreasing quality and productivity, labour shortages, occupational safety, and inferior working conditions have opened the possibility of more revolutionary solutions within the industry. One prospective option is in the implementation of innovative technologies such as automation and robotics, which has the potential to improve the industry in terms of productivity, safety and quality. The construction work site could, theoretically, be contained in a safer environment, with more efficient execution of the work, greater consistency of the outcome and higher level of control over the production process. By identifying the barriers to construction automation and robotics implementation in construction, and investigating ways in which to overcome them, contributions could be made in terms of better understanding and facilitating, where relevant, greater use of these technologies in the construction industry so as to promote its efficiency. This research aims to ascertain and explain the barriers to construction automation and robotics implementation by exploring and establishing the relationship between characteristics of the construction industry and attributes of existing construction automation and robotics technologies to level of usage and implementation in three selected countries; Japan, Australia and Malaysia. These three countries were chosen as their construction industry characteristics provide contrast in terms of culture, gross domestic product, technology application, organisational structure and labour policies. This research uses a mixed method approach of gathering data, both quantitative and qualitative, by employing a questionnaire survey and an interview schedule; using a wide range of sample from management through to on-site users, working in a range of small (less than AUD0.2million) to large companies (more than AUD500million), and involved in a broad range of business types and construction sectors. Detailed quantitative (statistical) and qualitative (content) data analysis is performed to provide a set of descriptions, relationships, and differences. The statistical tests selected for use include cross-tabulations, bivariate and multivariate analysis for investigating possible relationships between variables; and Kruskal-Wallis and Mann Whitney U test of independent samples for hypothesis testing and inferring the research sample to the construction industry population. Findings and conclusions arising from the research work which include the ranking schemes produced for four key areas of, the construction attributes on level of usage; barrier variables; differing levels of usage between countries; and future trends, have established a number of potential areas that could impact the level of implementation both globally and for individual countries.
Resumo:
Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course
Resumo:
The implementation of ‘good governance’ in Indonesia’s regional government sector became a central tenet in governance research following the introduction of the national code for governance in 2006. The code was originally drafted in 1999 as a response to the Asian financial crises and many cases of unearthed corruption, collusion, and nepotism. It was reviewed in 2001 and again in 2006 to incorporate relevant political, economical, and social developments. Even though the national code exists along with many regional government decrees on good governance, the extent of implementation of the tenets of good governance in Indonesia’s regional government is still questioned. Previous research on good governance implementation in Indonesian regional government (Mardiasmo, Barnes and Sakurai, 2008) identified differences in the nature and depth of implementation between various Indonesian regional governments. This paper analyses and extends this recent work and explores key factors that may impede the implementation and sustained application of governance practices across regional settings. The bureaucratic culture of Indonesian regional government is one that has been shaped for over approximately 30 years, in particular during that of the Soeharto regime. Previous research on this regime suggests a bureaucratic culture with a mix of positive and negative aspects. On one hand Soeharto’s regime resulted in strong development growth and strong economic fundamentals, resulting in Indonesia being recognised as one of the Asian economic tigers prior to the 1997 Asian financial crises. The financial crises however revealed a bureaucratic culture that was rife with corruption, collusion, and nepotism. Although subsequent Indonesian governments have been committed to eradicating entrenched practices it seems apparent that the culture is ingrained within the bureaucracy and eradication of it will take time. Informants from regional government agree with this observation, as they identify good governance as an innovative mechanism and to implement it will mean a deviation from the “old ways.” Thus there is a need for a “changed” mind set in order to implement sustained governance practices. Such an exercise has proven to be challenging so far, as there is “hidden” resistance from within the bureaucracy to change its ways. The inertia of such bureaucratic cultures forms a tension against the opportunity for the implementation of good governance. From this context an emergent finding is the existence of a ‘bureaucratic generation gap’ as an impeding variable to enhanced and more efficient implementation of governance systems. It was found that after the Asian financial crises the Indonesian government (both at national and regional level) drew upon a wider human resources pool to fill government positions – including entrants from academia, the private sector, international institutions, foreign nationals and new graduates. It suggested that this change in human capital within government is at the core of this ‘inter-generational divide.’ This divergence is exemplified, at one extreme, by [older] bureaucrats who have been in-position for long periods of time serving during the extended Soeharto regime. The “new” bureaucrats have only sat in their positions since the end of Asian financial crisis and did not serve during Soeharto’s regime. It is argued that the existence of this generation gap and associated aspects of organisational culture have significantly impeded modernising governance practices across regional Indonesia. This paper examines the experiences of government employees in five Indonesian regions: Solok, Padang, Gorontalo, Bali, and Jakarta. Each regional government is examined using a mixed methodology comprising of on-site observation, document analysis, and iterative semi-structured interviewing. Drawing from the experiences of five regional governments in implementing good governance this paper seeks to better understand the causal contexts of variable implementation governance practices and to suggest enhancements to the development of policies for sustainable inter-generational change in governance practice across regional government settings.
Resumo:
Crash data involving taxis indicates that such drivers are over represented in crashes and are one to two times more likely to be involved in a fatality crash. This study reports on the pre intervention survey to provide a baseline measure of the self-reported attitudes and corresponding driving behaviours of a sample of taxi drivers. Results indicate that some taxi drivers willingly admit to engaging in unsafe driving practices. In addition, preliminary results of a post intervention survey revealed that taxi drivers’ safety perceptions, attitude and behaviours improved after completing a Driving Diary intervention.
Resumo:
Construction sector policy makers have the opportunity to create improvements and develop economic, social and environmental sustainability through supply chain economics. The idea of the supply chain concept to improve firm behaviour and industry performance is not new. However there has been limited application and little or no measurement to monitor successful implementation. Often purchasing policies have been developed with sound strategic procurement principles but even these have had limited penetration in to the processes and practices of infrastructure agencies. The research reported in this paper documents an action research study currently being undertaken in the Australian construction sector which aims to explore supply chain economic policy implementation for sectoral change by two government agencies. The theory which informs this study is the emerging area of construction supply chain economics. There are five stages to the project including; demand analysis, chain analysis, government agency organizational audit, supplier strategy and strategic alignment. The overall objective is towards the development of a Supplier Group Strategy Map for two public sector agencies. Two construction subsectors are examined in detail; construction and demolition waste and precast concrete. Both of these subsectors are critical to the economic and environmental sustainability performance of the construction sector and the community as a whole in the particular jurisdictions. The local and state government agencies who are at the core of the case studies rely individually on the performance of these sectors. The study is set within the context of a sound state purchasing policy that has however, had limited application by the two agencies. Partial results of the study are presented and early findings indicate that the standard risk versus expenditure procurement model does not capture the complexities of project, owner and government risk considerations. A new model is proposed in this paper, which incorporates the added dimension of time. The research results have numerous stakeholders; they will hold particular value for those interested in regional construction sector economics, government agencies who develop and implement policy and who have a large construction purchasing imprint and the players involved in the two subsectors. Even though this is a study in Australia it has widespread applicability as previous research indicates that procurement reform is of international significance and policy implementation is problematic.
Resumo:
This publication, summarising outcomes of an investigation into eTendering as a part of a CRC Construction Innovation research project, presents guidelines and recommendations to be considered when implementing eTendering systems, procedures and policies.
Resumo:
In this paper we discuss our current efforts to develop and implement an exploratory, discovery mode assessment item into the total learning and assessment profile for a target group of about 100 second level engineering mathematics students. The assessment item under development is composed of 2 parts, namely, a set of "pre-lab" homework problems (which focus on relevant prior mathematical knowledge, concepts and skills), and complementary computing laboratory exercises which are undertaken within a fixed (1 hour) time frame. In particular, the computing exercises exploit the algebraic manipulation and visualisation capabilities of the symbolic algebra package MAPLE, with the aim of promoting understanding of certain mathematical concepts and skills via visual and intuitive reasoning, rather than a formal or rigorous approach. The assessment task we are developing is aimed at providing students with a significant learning experience, in addition to providing feedback on their individual knowledge and skills. To this end, a noteworthy feature of the scheme is that marks awarded for the laboratory work are primarily based on the extent to which reflective, critical thinking is demonstrated, rather than the amount of CBE-style tasks completed by the student within the allowed time. With regard to student learning outcomes, a novel and potentially critical feature of our scheme is that the assessment task is designed to be intimately linked to the overall course content, in that it aims to introduce important concepts and skills (via individual student exploration) which will be revisited somewhat later in the pedagogically more restrictive formal lecture component of the course (typically a large group plenary format). Furthermore, the time delay involved, or "incubation period", is also a deliberate design feature: it is intended to allow students the opportunity to undergo potentially important internal re-adjustments in their understanding, before being exposed to lectures on related course content which are invariably delivered in a more condensed, formal and mathematically rigorous manner. In our presentation, we will discuss in more detail our motivation and rationale for trailing such a scheme for the targeted student group. Some of the advantages and disadvantages of our approach (as we perceived them at the initial stages) will also be enumerated. In a companion paper, the theoretical framework for our approach will be more fully elaborated, and measures of student learning outcomes (as obtained from eg. student provided feedback) will be discussed.
Resumo:
This paper aimed to explore the proportion associated with the perceived importance and the actual use of performance indicators from manufacturing and non manufacturing industries. The sample was 86 small and medium sized-organizations in Thailand. The perceived importance and the actual use of financial and non financial indicators were found to be significantly related among manufacturing and non manufacturing industries. KPI 3, 9, and 12 (i.e. sales and sales growth; quality of products and /or services; and process time) were perceived the most importance among manufacturing managers (85.3%, 79.4% and 76.5% respectively). While KPI 6, 9, and 12 (i.e. customer satisfaction, quality of products and /or services; and process time) were perceived the most importance among non manufacturing managers (84.8%, 93.5%, and 84.8% respectively). Interestingly, the most used KPIs for manufacturing were sales and sales growth (64.7%); profit margins (61.8%); and customer satisfaction (84.8) while non manufacturing used quality products/services (60.9%); sales and sales growth (54.3%) and employee development (54.3%) respectively. Limitation and implication were also discussed.
Resumo:
In an empirical test and extension of Klein Conn and Sorra’s model of innovation implementation effectiveness, we apply structural equation modelling to identify the generalizability of their data-modified model in comparison with their theorised model. We examined the implementation of various types of innovations in a sample of 135 organizations. We found that the data supported the original model rather than the data-modified model, such that implementation climate mediated polices and practices and implementation effectiveness, while implementation effectiveness partially mediated the relationship between implementation climate and innovation effectiveness. Furthermore, we extend their model to suggest that non-financial resources availability plays a critical role in implementation policies and practices.
Resumo:
To explore potential barriers to and facilitators for implementing occupational road safety initiatives, in-depth interviews were conducted with personnel from four major Australian organizations. Twenty-four participants were involved in the interviews comprising 16 front line employees and eight managers. The interviews identified that employees perceived six organizational characteristics as potential barriers to implementing occupational road safety initiatives. These included: prioritisation of production over safety; complacency towards occupational road risks; insufficient resources; diversity; limited employee input in safety decisions; and a perception that road safety initiatives were an unnecessary burden. Of these organizational characteristics, prioritisation of production over safety and complacency were the most frequently cited barriers. In regards to facilitators, participants perceived three organizational characteristics as potential facilitators to implementing occupational road safety initiatives. These included: management commitment; the presence of existing systems that could support the implementation of initiatives; and supportive relationships. Of these organizational characteristics, management commitment was the most frequently cited facilitator.
Resumo:
This paper proposes a plan to evaluate ways in which EQ Staff undertake their responsibility to implement the substantive policy, Inclusive Education Statement- 2005, Education Queensland. The Inclusive Education Statement, 2005 (Education Queensland), is a substantive policy that drove the development of the subsequent procedures, CRP-PR-009: Inclusive Education. These procedures state that “All Education Queensland (EQ) staff have responsibilities ........to implement the Inclusive Education Statement 2005”.