859 resultados para Multi-stage planning
Resumo:
The spectrum characteristic of the EMC ranges from eclogites (containing omphacite and/or jadeite, garnet, phengite, glaucophane, zoisite, chloritoid, rutile) to phengite schists, calcschists, and marbles, as well as a variety of orthogneisses. Despite the intense polyphase deformation and HP-metamorphic recrystallization, it is possible in some locations to recognize pre-Alpine characteristics in some of the protoliths. For instance, two types of felsic orthogneiss can be distinguished in the Aosta Valley, one derived from Permian granitoids (with local preservation of intrusive contacts, magmatic inclusions, leucocratic veins and other magmatic structures; Stop 3), the other derived from pre-Variscan leuco-monzogranite, such as the building stone mined at the “Argentera” quarry near Settimo Vittone / Montestrutto (Stop 2; so-called “Verde Argento” contains jadeite, phengite, K-feldspar, quartz). Polycyclic and more rarely monocyclic metasediments contain evidence of a complex Alpine PTDt-evolution, locally including relics of their prograde history from blueschist, one or more stages at eclogite facies. Recent petrochronological studies have dated this HP-evolution of the Sesia Zone in some detail. In the area visited, clear evidence of HP-cycling has been identified in one km-size tectonic slice (Stop 1), but not in adjacent parts of the EMC, indicating “yo-yo tectonics”. Partial retrogression and attendant ductile to brittle deformation of the HP-rocks is evident in one of the outcrops (Stop 4). Apart from the four localities in the Sesia Zone, a final outcrop introduces HP-rocks of the adjacent Piemonte oceanic unit, specifically calc-schists and ophiolite members of the “Zermatt-Saas” zone. The hilltop outcrop (Stop 5) displays foliated antigorite schist with peridotite relics (clinopyroxene, spinel) containing lenses derived from doleritic dykes. These fine-grained metarodingites and the folded veins containing Mg-chlorite and titanoclinohumite within serpentinite once again indicate equilibration under low-temperature eclogite facies conditions. However, these units reached that HP stage more than 20 Ma after the youngest eclogite facies imprint recognized in the Sesia Zone. Despite nearly half a century of intense study in the Sesia Zone, the complex assembly of its HP-terranes and their relation to more external parts of the Western Alps remains incompletely understood. This field guide merely introduces a few of the classic outcrops and discusses some of the critical evidence they contain, but it could not incorporate details on each stage of the evolution recognized so far.
Resumo:
Many phase II clinical studies in oncology use two-stage frequentist design such as Simon's optimal design. However, they have a common logistical problem regarding the patient accrual at the interim. Strictly speaking, patient accrual at the end of the first stage may have to be suspended until all patients have events, success or failure. For example, when the study endpoint is six-month progression free survival, patient accrual has to be stopped until all outcomes from stage I is observed. However, study investigators may have concern when accrual is suspended after the first stage due to the loss of accrual momentum during this hiatus. We propose a two-stage phase II design that resolves the patient accrual problem due to an interim analysis, and it can be used as an alternative way to frequentist two-stage phase II studies in oncology. ^
Resumo:
Different possible input filter configurations for a modular three-phase PWM rectifier system consisting of three interleaved converter cells are studied. The system is designed for an aircraft application where MIL-STD-461E conducted EMI standards have to be met and system weight is a critical design issue. The importance of a LISN model on the simulated noise levels and the effect of interleaving and power unbalance between the different converter modules is discussed. The effect of the number of filter stages and the degree of distribution of the filter stages among the individual converter modules on the weight and losses of the input filter is studied and optimal filter structures are proposed.
Resumo:
This paper presents a methodology and algorithm for Air Traffic Control (ATC) to efficiently achieve schedules arrival times through speed control in the presence of uncertainty. The methodology does not assume the availability of airborne time of arrival control and can therefore be applied to legacy aircraft. The speed advisories are calculated in a manner that allows for sufficient control margin to, if required, adjust the aircraft's trajectory at a later stage to correct for estimated arrival time drift at the lowest impact to efficiency. The methodology is therefore envisioned to prevent major last-minute interventions and instead assists ATC in allowing more continuous descent approaches to be conducted by aircraft leading to more efficient operations.
Resumo:
On cover: Saline water conversion research.
Resumo:
Abstract not available
Resumo:
Electric distribution networks are now in the era of transition from passive to active distribution networks with the integration of energy storage devices. Optimal usage of batteries and voltage control devices along with other upgrades in network needs a distribution expansion planning (DEP) considering inter-temporal dependencies of stages. This paper presents an efficient approach for solving multi-stage distribution expansion planning problems (MSDEPP) based on a forward-backward approach considering energy storage devices such as batteries and voltage control devices such as voltage regulators and capacitors. The proposed algorithm is compared with three other techniques including full dynamic, forward fill-in, backward pull-out from the point of view of their precision and their computational efficiency. The simulation results for the IEEE 13 bus network show the proposed pseudo-dynamic forward-backward approach presents good efficiency in precision and time of optimization.
Resumo:
In order to develop a strategic plan that will guide their priorities and resource allocation for 2018-2021, North Carolina Sea Grant has implemented a multi-stage process designed to increase stakeholder engagement and to better assess and serve the coastal priorities of North Carolinians. This project explores strengths and potential areas for improvement within NC Sea Grant’s planning process with a specific focus on maximizing stakeholder engagement. By interviewing staff, observing focus groups, and creating a survey instrument for public distribution, we developed a set of recommendations highlighting the ways that NC Sea Grant can better facilitate inclusion of stakeholder, public, and staff input in its strategic planning process, such as holding some stakeholder events outside of typical business hours and discussing ways to incorporate diversity into the strategic plan.
Resumo:
This paper proposes strategies to reduce the number of variables and the combinatorial search space of the multistage transmission expansion planning problem (TEP). The concept of the binary numeral system (BNS) is used to reduce the number of binary and continuous variables related to the candidate transmission lines and network constraints that are connected with them. The construction phase of greedy randomized adaptive search procedure (GRASP-CP) and additional constraints, obtained from power flow equilibrium in an electric power system are employed for more reduction in search space. The multistage TEP problem is modeled like a mixed binary linear programming problem and solved using a commercial solver with a low computational time. The results of one test system and two real systems are presented in order to show the efficiency of the proposed solution technique. © 1969-2012 IEEE.
Resumo:
The complexity of planning a wireless sensor network is dependent on the aspects of optimization and on the application requirements. Even though Murphy's Law is applied everywhere in reality, a good planning algorithm will assist the designers to be aware of the short plates of their design and to improve them before the problems being exposed at the real deployment. A 3D multi-objective planning algorithm is proposed in this paper to provide solutions on the locations of nodes and their properties. It employs a developed ray-tracing scheme for sensing signal and radio propagation modelling. Therefore it is sensitive to the obstacles and makes the models of sensing coverage and link quality more practical compared with other heuristics that use ideal unit-disk models. The proposed algorithm aims at reaching an overall optimization on hardware cost, coverage, link quality and lifetime. Thus each of those metrics are modelled and normalized to compose a desirability function. Evolutionary algorithm is designed to efficiently tackle this NP-hard multi-objective optimization problem. The proposed algorithm is applicable for both indoor and outdoor 3D scenarios. Different parameters that affect the performance are analyzed through extensive experiments; two state-of-the-art algorithms are rebuilt and tested with the same configuration as that of the proposed algorithm. The results indicate that the proposed algorithm converges efficiently within 600 iterations and performs better than the compared heuristics.
Resumo:
DMAPS (Distributed Multi-Agent Planning System) is a planning system developed for distributed multi-robot teams based on MAPS (Multi-Agent Planning System). MAPS assumes that each agent has the same global view of the environment in order to determine the most suitable actions. This assumption fails when perception is local to the agents: each agent has only a partial and unique view of the environment. DMAPS addresses this problem by creating a probabilistic global view on each agent by fusing the perceptual information from each robot. The experimental results on consuming tasks show that while the probabilistic global view is not identical on each robot, the shared view is still effective in increasing performance of the team.
Resumo:
This paper proposes a new multi-resource multi-stage scheduling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints have been considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times of equipment; equipment-assignment-dependent operation times of blocks; distances between each pair of blocks; due windows of blocks; material properties of blocks; swell factors of blocks; and slope requirements of blocks. It is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level. The model also provides an intelligent decision support tool to account for the availability and usage of equipment units for drilling, blasting and excavating stages.
Resumo:
In this paper we present a novel application of scenario methods to engage a diverse constituency of senior stakeholders, with limited time availability, in debate to inform planning and policy development. Our case study project explores post-carbon futures for the Latrobe Valley region of the Australian state of Victoria. Our approach involved initial deductive development of two ‘extreme scenarios’ by a multi-disciplinary research team, based upon an extensive research programme. Over four workshops with the stakeholder constituency, these initial scenarios were discussed, challenged, refined and expanded through an inductive process, whereby participants took ‘ownership’ of a final set of three scenarios. These were both comfortable and challenging to them. The outcomes of this process subsequently informed public policy development for the region. Whilst this process did not follow a single extant structured, multi-stage scenario approach, neither was it devoid of form. Here, we seek to theorise and codify elements of our process – which we term ‘scenario improvisation’ – such that others may adopt it.
Resumo:
Electrical switching studies on amorphous Si15Te75Ge10 thin film devices reveal the existence of two distinct, stable low-resistance, SET states, achieved by varying the electrical input to the device. The multiple resistance levels can be attributed to multi-stage crystallization, as observed from temperature dependant resistance studies. The devices are tested for their ability to be RESET with minimal resistance degradation; further, they exhibit a minimal drift in the SET resistance value even after several months of switching. (c) 2013 Elsevier B.V. All rights reserved.