914 resultados para MANAGEMENT INDICATORS


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The paper aims to explore the key competitiveness indicators (KCIs) that provide the guidelines for helping new real estate developers (REDs) achieve competitiveness during their inception stage in which the organisations start their business. Design/methodology/approach – The research was conducted using a combination of various methods. A literature review was undertaken to provide a proper theoretical understanding of organisational competitiveness within RED's activities and developed a framework of competitiveness indicators (CIs) for REDs. The Delphi forecasting method is employed to investigate a group of 20 experts' perception on the relative importance between CIs. Findings – The results show that the KCIs of new REDs are capital operation capability, entrepreneurship, land reserve capability, high sales revenue from the first real estate development project, and innovation capability. Originality/value – The five KCIs of new REDs are new. In practical terms, the examination of these KCIs would help the business managers of new REDs to effectively plan their business by focusing their efforts on these key indicators. The KCIs can also help REDs provide theoretical constructs of the knowledge base on organisational competitiveness from a dynamic perspective, and assist in providing valuable experiences and in formulating feasible strategies for survival and growth.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Changes in grassland management intended to increase productivity can lead to sequestration of substantial amounts of atmospheric C in soils. Management-intensive grazing (MiG) can increase forage production in mesic pastures, but potential impacts on soil C have not been evaluated. We sampled four pastures (to 50 cm depth) in Virginia, USA, under MiG and neighboring pastures that were extensively grazed or bayed to evaluate impacts of grazing management on total soil organic C and N pools, and soil C fractions. Total organic soil C averaged 8.4 Mg C ha(-1) (22%) greater under MiG; differences were significant at three of the four sites examined while total soil N was greater for two sites. Surface (0-10 cm) particulate organic matter (POM) C increased at two sites; POM C for the entire depth increment (0-50 cm) did not differ significantly between grazing treatments at any of the sites. Mineral-associated C was related to silt plus clay content and tended to be greater under MiG. Neither soil C:N ratios, POM C, or POM C:total C ratios were accurate indicators of differences in total soil C between grazing treatments, though differences in total soil C between treatments attributable to changes in POM C (43%) were larger than expected based on POM C as a percentage of total C (24.5%). Soil C sequestration rates, estimated by calculating total organic soil C differences between treatments (assuming they arose from changing grazing management and can be achieved elsewhere) and dividing by duration of treatment, averaged 0.41 Mg C ha(-1) year(-1) across the four sites.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project discusses a component of the research study conducted to provide construction organizations with a generic benchmarking framework to assess their extent of information communication technology (ICT) adoption for building project management processes. It defines benchmarking and discusses objectives of the required benchmarking framework and development of the framework. The study focuses on ICT adoption by small and medium enterprises (SMEs) in the construction industry and with respect to SMEs it is important to understand processes, their indicators, and measures in the local context. Structure of the suggested benchmarking framework has been derived after extensive literature survey and a questionnaire survey conducted in the Indian construction industry. The suggested benchmarking process is an iterative process divided into four stages. It can be implemented at organization and industry levels for rating the construction organizations for ICT adoption and performance measurement. The framework has a generic structure and can be generalized and applied for other countries with due considerations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The trend of diminished funding, demands for greater efficiency and higher public accountability have led to a rapid expansion of interest in the bibliometric assessment of research performance of universities. A pilot research is conducted to provide a preliminary overview of the research performance of the building and construction schools or departments through the analysis of bibliometric indicators including the journal impact factor (JIF) published by Institute for Scientific Information (ISI). The suitability of bibliometric evaluation approaches as a measure of research quality in building and construction management research field is discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Studies indicate project success should be viewed from the different perspectives of the individual stakeholders. Project managers are owner’s agents. In order to allow early corrective actions to take place in case a project is diverted from plan, to accurately report perceived success of the stakeholders by project managers is essential, though there has been little systematic research in this area. The aim of this paper is to report the findings of an empirical study that compares the level of alignment between project managers and key stakeholders on a list of project performance indicators. A telephone survey involving 18 complex project managers and various key project stakeholder groups was conducted in this study. Krippendorff’s Kappa alpha reliability test was used to assess the alignment levels between project managers and stakeholders. Despite the overall agreement level between project manager and stakeholders is only medium; results have also identified 12 performance indicators that have significant level of agreement between project managers and stakeholders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Prognostics and asset life prediction is one of research potentials in engineering asset health management. We previously developed the Explicit Hazard Model (EHM) to effectively and explicitly predict asset life using three types of information: population characteristics; condition indicators; and operating environment indicators. We have formerly studied the application of both the semi-parametric EHM and non-parametric EHM to the survival probability estimation in the reliability field. The survival time in these models is dependent not only upon the age of the asset monitored, but also upon the condition and operating environment information obtained. This paper is a further study of the semi-parametric and non-parametric EHMs to the hazard and residual life prediction of a set of resistance elements. The resistance elements were used as corrosion sensors for measuring the atmospheric corrosion rate in a laboratory experiment. In this paper, the estimated hazard of the resistance element using the semi-parametric EHM and the non-parametric EHM is compared to the traditional Weibull model and the Aalen Linear Regression Model (ALRM), respectively. Due to assuming a Weibull distribution in the baseline hazard of the semi-parametric EHM, the estimated hazard using this model is compared to the traditional Weibull model. The estimated hazard using the non-parametric EHM is compared to ALRM which is a well-known non-parametric covariate-based hazard model. At last, the predicted residual life of the resistance element using both EHMs is compared to the actual life data.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper discusses the level of effectiveness of quality principles and quality management system implementation and the relationship with performance of ISO9000 certified Indonesian contractors. It also discusses the statistical relationship between quality management systems (QMSs) and key performance indicators (KPIs) amongst a large sample of Indonesian construction companies. Data collected is from questionnaire surveys involving Quality Managers, Managers, and Project and Site Engineers representing 77 different companies. Results indicate that even though some contractors have not yet effectively implemented an effective QMS, most of the KPIs of respondent companies are still at the level of high performance. The statistical results show that the relationship between variables of ISO9000 QMS principles and contractors’ KPIs is significant. These results suggest that an increment in the implementation level of QMS principles can increase KPIs, however that much effort is still required for Indonesian contractors to fully effectively implement QMS principles and thus substantially improve performance against KPIs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Evaluating the safety of different traffic facilities is a complex and crucial task. Microscopic simulation models have been widely used for traffic management but have been largely neglected in traffic safety studies. Micro simulation to study safety is more ethical and accessible than the traditional safety studies, which only assess historical crash data. However, current microscopic models are unable to mimic unsafe driver behavior, as they are based on presumptions of safe driver behavior. This highlights the need for a critical examination of the current microscopic models to determine which components and parameters have an effect on safety indicator reproduction. The question then arises whether these safety indicators are valid indicators of traffic safety. The safety indicators were therefore selected and tested for straight motorway segments in Brisbane, Australia. This test examined the capability of a micro-simulation model and presents a better understanding of micro-simulation models and how such models, in particular car following models can be enriched to present more accurate safety indicators.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper explores how the design of creative clusters as a key strategy in promoting the urban creative economy has played out in Shanghai. Creative Clusters in Europe and North America context have emerged ‘organically’. They developed spontaneously in those cities which went through a period of post-industrial decline. Creative Industries grew up in these cities as part of a new urban economy in the wake of old manufacturing industries. Artists and creative entrepreneurs moved into vacant warehouses and factories and began the trend of ‘creative clusters’. Such clusters facilitate the transfer of tacit knowledge through informal learning, the efficient sourcing of skills and information, competition, collaboration and learning, inter-cluster trading and networking. This new urban phenomenon was soon targeted by local economic development policy in charge of re-generating and re-structuralizing industrial activities in cities. Rising interest from real estate and local economic development has led to more and more planned creative clusters. In the aim of catching up with the world’s creative cities, Shanghai has planned over 100 creative clusters since 2005. Along with these officially designed creative clusters, there are organically emerged creative clusters that are much smaller in scale and much more informal in terms of the management. And they emerged originally in old residential areas just outside the CBD and expand to include French concession the most sort after residential area at the edge of CBD. More recently, office buildings within CBD are made available for creative usages. From fringe to CBD, these organic creative clusters provide crucial evidences for the design of creative clusters. This paper will be organized in 2 parts. In the first part, I will present a case study of 8 ‘official’ clusters (title granted by local govenrment) in Shanghai through which I am hoping to develop some key indicators of the success/failure of creative clusters as well as link them with their physical, social and operational efficacies. In the second part, a variety of ‘alternative’ clusters (organicly formed clusters most of which are not recongnized by the government) supplies with us the possibilities of rethinking the so-called ‘cluster development strategy’ in terms of what kind of spaces are appropriate for use by clusters? Who should manage them and in what format? And ultimately what are their relationship with the rest of the city should be defined?

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Safety culture is a concept that has long been accepted in high risk industries such as aviation, nuclear industries and mining, however, considerable research is now being undertaken within the construction sector, with varying levels of success. The current paper discusses three recent interlocked projects that have had some success in the Australian construction industry. The first project examined the development and implementation of a safety competency framework targeted at safety critical positions across first tier construction organisations. Combining qualitative and quantitative methods, the project: developed a matrix of safety critical positions (n=11) and safety managements tasks (SMTs; n=39); mapped the process steps for their acquisition and ongoing development; detailed the knowledge, skills and behaviours required for all SMTs; and outlined organisational cultural outcomes that could be anticipated in a successful implementation of the framework. The second project extended research on safety competency and leadership to develop behavioural guidelines for leaders to drive safety culture change down to second tier companies. This was designed to assist smaller construction companies to customise their own competency framework and develop implementation guidelines that match their aspirations and resources. The third interlocked project explored the use of safety effectiveness indicators (SEIs) as an industry-relevant assessment tool for reducing risk on construction sites. With direct linkages to safety competencies and safety management tasks, the SEIs are the next step towards an integrated safety cultural approach to safety and extend the concept of positive performance indicators (PPIs) by providing a valid, reliable, and user friendly measurement platform. Taken together, the results of the interlocked projects suggest that safety culture research has many potential benefits for the construction industry, particularly when research is conducted in partnership with industry stakeholders. Suggestions are made for future research, including further application and testing of the safety competency framework and aligning SEIs across construction projects of varying size, location and design.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With increasing media exposure and evidence of environmental impacts, it is increasingly recognized that incorporating sustainability principles in construction works is both crucial and beneficial. However a recent survey reveals that among stakeholders of infrastructure projects such as roads, there is no common understanding on what constitutes sustainability in real-life projects. Sustainability has been interpreted widely and differently and as a result, sustainability outcomes are not tangible at the project level or often neglected. Under such conditions, policies and strategies on sustainability remain largely ideological and cannot be sufficiently reflected in the actual project delivery. The major difficulty of this sustainability pursuit lies in the lack of consensus among the experts on sustainability criteria and indicators. To move ahead, these criteria and indicators are to be agreed upon. This paper reviews the sustainable infrastructure development, its criteria and indicators, focusing on road infrastructure context. It goes on to introduce a Delphi study, an integral part of a QUT research, aimed at identifying critical sustainability criteria and indicators for Australian road infrastructure projects. It paves the way for further identification of solutions for each critical indicator at a subsequent stage. The criteria, indicators and solutions will be encapsulated into a decision making framework for the enhancement of sustainability deliverables. By doing so, the research will promote more integrated thinking of and consistent approaches to the sustainability agenda in road and highway infrastructure projects in Australia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The lack of satisfactory consensus for characterizing the system intelligence and structured analytical decision models has inhibited the developers and practitioners to understand and configure optimum intelligent building systems in a fully informed manner. So far, little research has been conducted in this aspect. This research is designed to identify the key intelligent indicators, and develop analytical models for computing the system intelligence score of smart building system in the intelligent building. The integrated building management system (IBMS) was used as an illustrative example to present a framework. The models presented in this study applied the system intelligence theory, and the conceptual analytical framework. A total of 16 key intelligent indicators were first identified from a general survey. Then, two multi-criteria decision making (MCDM) approaches, the analytic hierarchy process (AHP) and analytic network process (ANP), were employed to develop the system intelligence analytical models. Top intelligence indicators of IBMS include: self-diagnostic of operation deviations; adaptive limiting control algorithm; and, year-round time schedule performance. The developed conceptual framework was then transformed to the practical model. The effectiveness of the practical model was evaluated by means of expert validation. The main contribution of this research is to promote understanding of the intelligent indicators, and to set the foundation for a systemic framework that provide developers and building stakeholders a consolidated inclusive tool for the system intelligence evaluation of the proposed components design configurations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Safety culture is a concept that has long been accepted in high risk industries such as aviation, nuclear industries and mining, however, considerable research is now also being undertaken within the construction sector. This paper discusses three recent interlocked projects undertaken in the Australian construction industry. The first project examined the development and implementation of a safety competency framework targeted at safety critical positions (SCP's) across first tier construction organisations. Combining qualitative and quantitative methods, the project: developed a matrix of SCP's (n=11) and safety management tasks (SMTs; n=39); mapped the process steps for their acquisition and development; detailed the knowledge, skills and behaviours required for all SMTs; and outlined potential organisational cultural outcomes from a successful implementation of the framework. The second project extended this research to develop behavioural guidelines for leaders to drive safety culture change down to second tier companies and to assist them to customise their own competency framework and implementation guidelines to match their aspirations and resources. The third interlocked project explored the use of safety effectiveness indicators (SEIs) as an industry-relevant assessment tool for reducing risk on construction sites. With direct linkages to safety competencies and SMT's, the SEIs are the next step towards an integrated safety cultural approach to safety and extend the concept of positive performance indicators (PPIs) by providing a valid, reliable, and user friendly measurement platform. Taken together, the results of the interlocked projects suggest that industry engaged collaborative safety culture research has many potential benefits for the construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Summary Appropriate assessment and management of diabetes-related foot ulcers (DRFUs) is essential to reduce amputation risk. Management requires debridement, wound dressing, pressure off-loading, good glycaemic control and potentially antibiotic therapy and vascular intervention. As a minimum, all DRFUs should be managed by a doctor and a podiatrist and/or wound care nurse. Health professionals unable to provide appropriate care for people with DRFUs should promptly refer individuals to professionals with the requisite knowledge and skills. Indicators for immediate referral to an emergency department or multidisciplinary foot care team (MFCT) include gangrene, limb-threatening ischaemia, deep ulcers (bone, joint or tendon in the wound base), ascending cellulitis, systemic symptoms of infection and abscesses. Referral to an MFCT should occur if there is lack of wound progress after 4 weeks of appropriate treatment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objective. The aim of this paper is to report the clinical practice changes resulting from strategies to standardise diabetic foot clinical management in three diverse ambulatory service sites in Queensland, Australia. Methods. Multifaceted strategies were implemented in 2008, including: multidisciplinary teams, clinical pathways, clinical training, clinical indicators, and telehealth support. Prior to the intervention, none of the aforementioned strategies were used, except one site had a basic multidisciplinary team. A retrospective audit of consecutive patient records from July 2006 to June 2007 determined baseline clinical activity (n = 101).Aclinical pathway teleform was implemented as a clinical activity analyser in 2008 (n = 327) and followed up in 2009 (n = 406). Pre- and post-implementation data were analysed using Chi-square tests with a significance level set at P < 0.05. Results. There was an improvement in surveillance of the high risk population of 34% in 2008 and 19% in 2009, and treating according to risk of 15% in 2009 (P < 0.05). The documentation of all best-practice clinical activities performed improved 13–66% (P < 0.03). Conclusion. These findings support the use of multifaceted strategies to standardise practice and improve diabetic foot complications management in diverse ambulatory services.