989 resultados para Lean Management
Resumo:
Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face.
Resumo:
The main objective of this study is to verify the influence of Environmental Management (EM) on Operational Performance (OP) in Brazilian automotive companies, analyzing whether Lean Manufacturing (LM) and Human Resources (HR) interfere in the greening of these companies. Therefore, a conceptual framework listing these concepts was proposed, and three research hypotheses were presented. A questionnaire was elaborated based on this theoretical background and sent to respondents occupying the highest positions in the production/operations areas of Brazilian automotive companies. The data, collected from 75 companies, were analyzed using structural equation modeling. The main results are as follows: (a) the model tested revealed an adequate goodness of fit, showing that overall, the relations proposed between EM and OP and between HR, LM and EM tend to be statistically valid; (b) EM tends to influence OP in a positive and statistically weak manner; (c) LM has a greater influence on EM when compared to the influence HR has over EM; (d) HR has a positive relationship over EM, but the statistical significance of this relationship is less than that of the other evaluated relationships. The originality of this paper lies in its gathering the concepts of EM, LM, HR and OP in a single study, as they generally tend not to be treated jointly. This paper also provided valid empirical evidence for a littlestudied context: the Brazilian automotive sector. © 2012 Elsevier Ltd. All rights reserved.
Resumo:
In this project, I examine current forms of scientific management systems, Lean and Six Sigma, as they relate to technical communication. With the goal of breaking work up into standardized processes in order to cut costs and increase efficiency, Lean, Six Sigma and Lean Six Sigma hybrid systems are increasingly applied beyond manufacturing operations to service and other types of organizational work, including technical communication. By consulting scholarship from fields such as business, management, and engineering, and analyzing government Lean Six Sigma documentation, I investigate how these systems influence technical communication knowledge and practice in the workplace. I draw out the consequences of system-generated power structures as they affect knowledge work, like technical communication practice, when it is reduced to process. In pointing out the problems these systems have in managing knowledge work, I also ask how technical communication might shape them.
Resumo:
Shopfloor Management (SM) empowerment methodologies have traditionally focused on two aspects: goal achievement following rigid structures, such as SQDCME, or evolutional aspects of empowerment factors away from strategic goal achievement. Furthermore, SM Methodologies have been organized almost solely around the hierarchical structure of the organization, failing systematically to cope with the challenges that Industry 4.0 is facing. The latter include the growing complexity of value-stream networks, sustainable empowerment of the workforce (Learning Factory), an autonomous and intelligent process management (Smart Factory), the need to cope with the increasing complexity of value-stream networks (VSN) and the leadership paradigm shift to strategic alignment. This paper presents a novel Lean SM Method (LSM) called ?HOSHIN KANRI Tree? (HKT), which is based on standardization of the communication patterns among process owners (POs) by PDCA. The standardization of communication patterns by HKT technology should bring enormous benefits in value stream (VS) performance, speed of standardization and learning rates to the Industry 4.0 generation of organizations. These potential advantages of HKT are being tested at present in worldwide research.
Resumo:
El presente trabajo se basa en la filosofía de la Construcción sin Pérdidas (“Lean Construction”), analizando la situación de esta filosofía en el sector de la edificación en el contexto internacional y español, respondiendo las siguientes preguntas: 1. ¿Cómo surge el “Lean Construction”? 2. ¿Cuáles son sus actividades, funciones y cometidos? 3. ¿Existe regulación del ¨Lean Construction” en otros países? 4. ¿Existe demanda del ¨Lean Construction” en España? 5. ¿Existe regulación del ¨Lean Construction” en España? 6. ¿Cómo debería ser la regulación ¨Lean Construction” en España? 7. ¿Cuál es la relación del “Lean Construction” con el “Project & Construction Management”? 8. ¿Cómo debería ser la regulación de “Lean Construction” en España considerando su relación con el “Project & Construction Management”? Las preguntas indicadas las hemos respondido detalladamente en el presente trabajo, a continuación se resume las respuestas a dichas preguntas: 1. El “Lean Construction” surge en agosto de 1992, cuando el investigador finlandés Lauri Koskela publicó en la Universidad de Stanford el reporte TECHNICAL REPORT N° 72 titulado “Application of the New Production Philosophy to Construction”. Un año más tarde el Dr. Koskela invitó a un grupo de especialistas en construcción al primer workshop de esta materia en Finlandia, dando origen al International Group for Lean Construction (IGLC) lo que ha permitido extender la filosofía a EEUU, Europa, América, Asia, Oceanía y África. “Lean Construction” es un sistema basado en el enfoque “Lean Production” desarrollado en Japón por Toyota Motors a partir de los años cincuenta, sistema que permitió a sus fábricas producir unidades con mayor eficiencia que las industrias americanas, con menores recursos, en menor tiempo, y con un número menor de errores de fabricación. 2. El sistema “Lean Construction” busca maximizar el valor y disminuir las pérdidas de los proyectos generando una coordinación eficiente entre los involucrados, manejando un proyecto como un sistema de producción, estrechando la colaboración entre los participantes de los proyectos, capacitándoles y empoderándoles, fomentando una cultura de cambio. Su propósito es desarrollar un proceso de construcción en el que no hayan accidentes, ni daños a equipos, instalaciones, entorno y comunidad, que se realice en conformidad con los requerimientos contractuales, sin defectos, en el plazo requerido, respetando los costes presupuestados y con un claro enfoque en la eliminación o reducción de las pérdidas, es decir, las actividades que no generen beneficios. El “Last Planner System”, o “Sistema del Último Planificador”, es un sistema del “Lean Construction” que por su propia naturaleza protege a la planificación y, por ende, ayuda a maximizar el valor y minimizar las pérdidas, optimizando de manera sustancial los sistemas de seguridad y salud. El “Lean Construction” se inició como un concepto enfocado a la ejecución de las obras, posteriormente se aplicó la filosofía a todas las etapas del proyecto. Actualmente considera el desarrollo total de un proyecto, desde que nace la idea hasta la culminación de la obra y puesta en marcha, considerando el ciclo de vida completo del proyecto. Es una filosofía de gestión, metodologías de trabajo y una cultura empresarial orientada a la eficiencia de los procesos y flujos. La filosofía “Lean Construction” se está expandiendo en todo el mundo, además está creciendo en su alcance, influyendo en la gestión contractual de los proyectos. Su primera evolución consistió en la creación del sistema “Lean Project Delivery System”, que es el concepto global de desarrollo de proyectos. Posteriormente, se proponen el “Target Value Design”, que consiste en diseñar de forma colaborativa para alcanzar los costes y el valor requerido, y el “Integrated Project Delivery”, en relación con sistemas de contratos relacionales (colaborativos) integrados, distintos a los contratos convencionales. 3. Se verificó que no existe regulación específica del ¨Lean Construction” en otros países, en otras palabras, no existe el agente con el nombre específico de “Especialista en Lean Construction” o similar, en consecuencia, es un agente adicional en el proyecto de la edificación, cuyas funciones y cometidos se pueden solapar con los del “Project Manager”, “Construction Manager”, “Contract Manager”, “Safety Manager”, entre otros. Sin embargo, se comprobó la existencia de formatos privados de contratos colaborativos de Integrated Project Delivery, los cuales podrían ser tomados como unas primeras referencias para futuras regulaciones. 4. Se verificó que sí existe demanda del ¨Lean Construction” en el desarrollo del presente trabajo, aunque aún su uso es incipiente, cada día existe más interesados en el tema. 5. No existe regulación del ¨Lean Construction” en España. 6. Uno de los objetivos fundamentales de esta tesis es el de regular esta figura cuando actúe en un proyecto, definir y realizar una estructura de Agente de la Edificación, según la Ley de Ordenación de la Edificación (LOE), y de esta manera poder introducirla dentro de la Legislación Española, protegiéndola de eventuales responsabilidades civiles. En España existe jurisprudencia (sentencias de los tribunales de justicia españoles) con jurisdicción civil basada en la LOE para absolver o condenar a agentes de la edificación que son definidos en los tribunales como “gestores constructivos” o similares. Por este motivo, en un futuro los tribunales podrían dictaminar responsabilidades solidarias entre el especialista “Lean Construction” y otros agentes del proyecto, dependiendo de sus actuaciones, y según se implemente el “Lean Project Delivery System”, el “Target Value Design” y el “Integrated Project Delivery”. Por otro lado, es posible que el nivel de actuación del especialista “Lean Construcción” pueda abarcar la gestión del diseño, la gestión de la ejecución material (construcción), la gestión de contratos, o la gestión integral de todo el proyecto de edificación, esto último, en concordancia con la última Norma ISO 21500:2012 o UNE-ISO 21500:2013 Directrices para la dirección y gestión de proyectos. En consecuencia, se debería incorporar adecuadamente a uno o más agentes de la edificación en la LOE de acuerdo a sus funciones y responsabilidades según los niveles de actuación del “Especialista en Lean Construction”. Se propone la creación de los siguientes agentes: Gestor del Diseño, Gestor Constructivo y Gestor de Contratos, cuyas definiciones están desarrolladas en este trabajo. Estas figuras son definidas de manera general, puesto que cualquier “Project Manager” o “DIPE”, gestor BIM (Building Information Modeling), o similar, puede actuar como uno o varios de ellos. También se propone la creación del agente “Gestor de la Construcción sin Pérdidas”, como aquel agente que asume las actuaciones del “gestor de diseño”, “gestor constructivo” y “gestor de contratos” con un enfoque en los principios del Lean Production. 7. En la tesis se demuestra, por medio del uso de la ISO 21500, que ambos sistemas son complementarios, de manera que los proyectos pueden tener ambos enfoques y ser compatibilizados. Un proyecto que use el “Project & Construction Management” puede perfectamente apoyarse en las herramientas y técnicas del “Lean Construction” para asegurar la eliminación o reducción de las pérdidas, es decir, las actividades que no generen valor, diseñando el sistema de producción, el sistema de diseño o el sistema de contratos. 8. Se debería incorporar adecuadamente al agente de la edificación “Especialista en Lean Construction” o similar y al agente ¨Especialista en Project & Construction Management” o DIPE en la Ley de Ordenación de la Edificación (LOE) de acuerdo a sus funciones y responsabilidades, puesto que la jurisprudencia se ha basado para absolver o condenar en la referida Ley. Uno de los objetivos fundamentales de esta tesis es el de regular la figura del “Especialista en Lean Construction” cuando actúa simultáneamente con el DIPE, y realizar una estructura de Agente de la Edificación según la LOE, y de esta manera protegerlo de eventuales responsabilidades solidarias. Esta investigación comprueba que la propuesta de definición del agente de edificación DIPE, según la LOE, presentada en la tesis doctoral del Doctor Manuel Soler Severino es compatible con las nuevas definiciones propuestas. El agente DIPE puede asumir los roles de los diferentes gestores propuestos en esta tesis si es que se especializa en dichas materias, o, si lo estima pertinente, recomendar sus contrataciones. ABSTRACT This work is based on the Lean Construction philosophy; an analysis is made herein with regard to the situation of this philosophy in the building sector within the international and Spanish context, replying to the following questions: 1. How did the concept of Lean Construction emerge? 2. Which are the activities, functions and objectives of Lean Construction? 3. Are there regulations on Lean Construction in other countries? 4. Is there a demand for Lean Construction in Spain? 5. Are there regulations on Lean Construction in Spain? 6. How should regulations on Lean Construction be developed in Spain? 7. What is the relationship between Lean Construction and the Project & Construction Management? 8. How should regulations on Lean Construction be developed in Spain considering its relationship with the Project & Construction Management? We have answered these questions in detail here and the replies are summarized as follows: 1. The concept of Lean Construction emerged in august of 1992, when Finnish researcher Lauri Koskela published in Stanford University TECHNICAL REPORT N° 72 entitled “Application of the New Production Philosophy to Construction”. A year later, Professor Koskela invited a group of construction specialists to Finland to the first workshop conducted on this matter; thus, the International Group for Lean Construction (IGLC) was established, which has contributed to extending the philosophy to the United States, Europe, the Americas, Asia, Oceania, and Africa. Lean Construction is a system based on the Lean Production approach, which was developed in Japan by Toyota Motors in the 1950s. Thanks to this system, the Toyota plants were able to produce more units, with greater efficiency than the American industry, less resources, in less time, and with fewer manufacturing errors. 2. The Lean Construction system aims at maximizing the value of projects while reducing waste, producing an effective coordination among those involved; it manages projects as a production system, enhancing collaboration between the parties that participate in the projects while building their capacities, empowering them, and promoting a culture of change. Its purpose is to develop a construction process free of accidents, without damages to the equipment, facilities, environment and community, flawless, in accordance with contractual requirements, within the terms established, respecting budgeted costs, and with a clear approach to eliminating or reducing waste, that is, activities that do not generate benefits. The Last Planner System is a Lean Construction system, which by its own nature protects planning and, therefore, helps to maximize the value and minimize waste, optimizing substantially the safety and health systems. Lean Construction started as a concept focused on the execution of works, and subsequently the philosophy was applied to all the stages of the project. At present it considers the project’s total development, since the time ideas are born until the completion and start-up of the work, taking into account the entire life cycle of the project. It is a philosophy of management, work methodologies, and entrepreneurial culture aimed at the effectiveness of processes and flows. The Lean Construction philosophy is extending all over the world and its scope is becoming broader, having greater influence on the contractual management of projects. It evolved initially through the creation of the Lean Project Delivery System, a global project development concept. Later on, the Target Value Design was developed, based on collaborative design to achieve the costs and value required, as well as the Integrated Project Delivery, in connection with integrated relational (collaborative) contract systems, as opposed to conventional contracts. 3. It was verified that no specific regulations on Lean Construction exist in other countries, in other words, there are no agents with the specific name of “Lean Construction Specialist” or other similar names; therefore, it is an additional agent in building projects, which functions and objectives can overlap those of the Project Manager, Construction Manager, Contract Manager, or Safety Manager, among others. However, the existence of private collaborative contracts of Integrated Project Delivery was confirmed, which could be considered as first references for future regulations. 4. There is a demand for Lean Construction in the development of this work; even though it is still emerging, there is a growing interest in this topic. 5. There are no regulations on Lean Construction in Spain. 6. One of the main objectives of this thesis is to regulate this role when acting in a project, and to define and develop a Building Agent structure, according to the Building Standards Law (LOE by its acronym in Spanish), in order to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, which are defined in the courts as “construction managers” or similar. For this reason, courts could establish in the future joint and several liabilities between the Lean Construction Specialist and other agents of the project, depending on their actions and based on the implementation of the Lean Project Delivery System, the Target Value Design, and the Integrated Project Delivery. On the other hand, it is possible that the level of action of the Lean Construction Specialist may comprise design management, construction management and contract management, or the integral management of the entire building project in accordance with the last ISO 21500:2012 or UNE-ISO 21500:2013, guidelines for the management of projects. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the Lean Construction Specialist. The creation of the following agents is proposed: Design Manager, Construction Manager, and Contract Manager, which definitions are developed in this work. These agents are defined in general, since any Project Manager or DIPE, Building Information Modeling (BIM) Manager or similar, may act as one or as many of them. The creation of the Lean Construction Manager is also proposed, as the agent that takes on the role of the Design Manager, Construction Manager and Contract Manager with a focus on the Lean Production principles. 7. In the thesis it is demonstrated that through the implementation of the ISO 21500, both systems are supplementary, so projects may have both approaches and be compatible. A project that applies the Project & Construction Management may perfectly have the support of the tools, techniques and practices of Lean Construction to ensure the elimination or reduction of losses, that is, those activities that do not generate value, thus designing the production system, the design system, or the contract system. 8. The Lean Construction Specialist or similar and the Specialist in Project & Construction Management should be incorporated appropriately into the LOE according to their functions and responsibilities, since jurisprudence has been based on such Law to acquit or convict. One of the main objectives of this thesis is the regulate the role of the Lean Construction Specialist when acting simultaneously with the DIPE, and to develop a structure of the building agent, according to the LOE, and in this way protect such agent from joint and several liabilities. This research proves that the proposal to define the DIPE building agent, according to the LOE, and presented in the doctoral dissertation of Manuel Soler Severino, Ph.D. is compatible with the new definitions proposed. The DIPE agent may assume the roles of the different managers proposed in this thesis if he specializes in those topics or, if deemed pertinent, recommends that they be engaged.
Resumo:
A lean bevezetése nem korlátozódik a termelés újraértelmezésére, hanem jellemzően a vállalati belső működés (számvitel, emberi erőforrás, beszerzés) és külső kapcsolatok (beszállítók, ellátási lánc) újszervezését is megköveteli. Ezek a kapcsolódási pontok számos, tudományterületek határán fekvő kutatási irányt nyitnak meg. Ebben a tanulmányban a lean termelés és a belső működéshez sorolt emberi erőforrás menedzsment kapcsolatára fókuszálok. Célom, hogy a tevékenységmenedzsment vonatkozó irodalmának áttekintésével bemutassam a lean termelés logikájához illeszkedő emberi erőforrás menedzsmentet, annak jellemző gyakorlatait. = Lean goes beyond manufacturing, implementing its principles usually requires companies to reorganize their companywide internal operations (accounting, human resource, purchasing) and also external relations (supplier, supply chain). This linkages offer several multidisciplinary research directions, this study focuses on the relationship between human resource management and lean production. The main aim of this working paper is to review Operations Management’s literatures on this issue and present the human resource policy and its practices that fit and support lean production.
Resumo:
A lean termelési rendszer szociotechnikai megközelítése szerint a lean technikai elemei (technikai alrendszer) a kimagasló teljesítményt nyújtó munkaerő-szervezési rendszer (HPWS) gyakorlataival (szocio alrendszer) kapcsolódnak össze. A tanulmány ezt a megközelítést MacDuffie (1995) szervezetilogika-koncepciója alapján mutatja be. A lean termelési rendszer munkaerő-szervezési rendszerével kapcsolatosan négy témakört tekint át: (1) a lean termelési rendszer munkaerő-szervezési rendszerekre gyakorolt hatását, (2) a HPWSgyakorlatok használatát és (3) teljesítményhatását, végül a (4) munkásokra gyakorolt hatásokat. A feldolgozott koncepcionális és empirikus munkákban valamennyi pontban számos ellentmondás fedezhető fel. _____ According to the socio-technical view of lean production lean system is built on both technical and human resource practices (subsystems). The concept of organizational logic developed by MacDuffie (1995) describes how lean techniques and high performance working systems practices mutually suppose each other in lean environment. This study reviews four fields of human issues in relation to lean production: (1) the impact of lean system on work organization; (2) the use HPWS practices and (3) their impact on operational performance indicators in lean producers; (4) the impact of lean production on workers. The review of empirical and conceptual studies points out that there are many contradictions regarding the above points.
Resumo:
Increased complexity in large design and manufacturing organisations requires improvements at the operations management (OM)–applied service (AS) interface areas to improve project effectiveness. The aim of this paper is explore the role of Lean in improving the longitudinal efficiency of the OM–AS interface within a large aerospace organisation using Lean principles and boundary spanning theory. The methodology was an exploratory longitudinal case approach including exploratory interviews (n = 21), focus groups (n = 2), facilitated action-research workshops (n = 2) and two trials or experiments using longitudinal data involving both OM and AS personnel working at the interface. The findings draw upon Lean principles and boundary spanning theory to guide and interpret the findings. It was found that misinterpretation, and forced implementation, of OM-based Lean terminology and practice in the OM–AS interface space led to delays and misplaced resources. Rather both OM and AS staff were challenged to develop a cross boundary understanding of Lean-based boundary (knowledge) objects in interpreting OM requests. The longitudinal findings from the experiments showed that the development of Lean Performance measurements and lean Value Stream constructs was more successful when these Lean constructs were treated as boundary (knowledge) objects requiring transformation over time to orchestrate improved effectiveness and in leading to consistent terminology and understanding between the OM–AS boundary spanning team.
Resumo:
Effective environmental management within companies, integrated with other management areas like quality and occupational health and safety, is nowadays assumed to be a strategic way to implement and improve lean and cleaner production. Also, sustainable development (SD) and business sustainability can be achieved through a better coordinated management of processes versus associated resources. This paper presents an in depth discussion regarding the promotion of integrated management systems, their benefits and major contribution towards the sustainable development of cleaner production related features. It addresses issues regarding the contributions resulting from the integration of standardized Management System (MS) from both internal and external perspectives. Complementing the overall review of aspects to the development of integrated management systems a survey was conducted in order to better understand the relevance of the identified success factors. The main findings in this paper are as follows: a contextualization model of sustainable development and integrated management systems considering the Triple Bottom Line: economic, social and environmental; and, a method and associated model to support the development of integrated management systems as well as general guidelines to support integration. It can be concluded that a proactive approach and commitment to cleaner production, supported by an integrated management system, brings relevant savings for organizations as well as providing value to the relevant interested parties.
Resumo:
Dissertação de Mestrado em Ciências Económicas e Empresariais.
Resumo:
A forte competitividade dos mercados a nível nacional e internacional tem levado muitas empresas a estudar métodos e técnicas de incremento à eliminação dos desperdícios, à redução de custos e tempos, ao aumento da qualidade e da flexibilidade, tendo a filosofia lean um papel crucial na prossecução destes objectivos. Desde os seus primórdios, a avaliação da implementação da filosofia lean no universo das empresas é uma questão de investigação na área de conhecimento da gestão industrial. Embora a nível individual as diferentes empresas possam quantificar e avaliar os resultados da aplicação do lean, a grande dificuldade surge quando se pretende obter uma comparação por sector ou tipo de actividade económica. Existem países onde a prática do lean tem sido prioritária e as empresas ocupam a vanguarda nesta área de conhecimento. No entanto, em Portugal, existe uma clara dificuldade em se determinar até que ponto o tecido empresarial português assimilou esta filosofia e que resultados têm obtido com a prática do lean. Este trabalho apresenta um estudo realizado a partir de um inquérito, obtido através de um questionário on-line, às empresas que operam em Portugal de forma a estudar e analisar o estado actual do lean em Portugal e antever tendências futuras numa perspectiva de evolução da aplicação desta metodologia de gestão de processos produtivos. Em resultado deste estudo foi possível identificar quais são os grandes obstáculos à introdução do lean, áreas em que se observou sucesso ou menor impacto e quais as ferramentas e técnicas mais usadas por sector. Como resultado deste estudo é convicção do autor que foi possível obter uma fotografia abrangente do actual estado de implementação do lean e desta forma caracterizar as áreas que seguem na vanguarda da implementação do lean, e as áreas que ainda apresentam um desenvolvimento incipiente. Desta forma parece ao autor que o presente estudo apresenta grande utilidade para o mundo académico bem como para o tecido empresarial português.
Resumo:
Worldwide competitiveness poses enormous challenges on managers, demanding a continuous quest to increase rationality in the use of resources. As a management philosophy, Lean Manufacturing focuses on the elimination of activities that do not create any type of value and therefore are considered waste. For companies to successfully implement the Lean Manufacturing philosophy it is crucial that the human resources of the organization have the necessary training, for which proper tools are required. At the same time, higher education institutions need innovative tools to increase the attractiveness of engineering curricula and develop a higher level of knowledge among students, improving their employability. This paper describes how Lean Learning Academy, an international collaboration project between five EU universities and five companies, from SME to Multinational/Global companies, developed and applied an innovative training programme for Engineers on Lean Manufacturing, a successful alternative to the traditional teaching methods in engineering courses.
Resumo:
Uma grande parte do tempo de uma organização é despendida em atividades que não criam qualquer tipo de valor. Este tipo de atividades são consideradas como desperdícios, pois consomem recursos e tempo, como é o caso de deslocações, controlos, ajustes, armazenamento de materiais, resolução de problemas, entre tantos outros, levando a um elevado custo dos produtos disponibilizados. Em 1996 a designação de Lean Thinking foi usada, pela primeira vez, por Womack e Jones, onde é falada como uma filosofia de gestão, que tem como principal objetivo reduzir os desperdícios num processo produtivo. Reduzindo os desperdícios aumenta-se a qualidade e diminui-se os tempos de processamento e, consequentemente, os custos de produção. É nesta base que assenta o documento aqui presente, que tem o objetivo de criar e desenvolver um jogo de simulação onde seja possível aplicar várias ferramentas Lean. O jogo de simulação é uma continuação de uma pesquisa e estudo teórico de um aluno de erasmus e faz parte de um projeto internacional do Lean Learning Academy (LLA). Criou-se um processo produtivo de montagem de canetas que fosse o mais semelhante ao que se encontram nas empresas, com todos os acessórios para o pleno funcionamento da simulação, como é o caso de instruções de montagem, procedimentos de controlo e ordens de produção, para assim posteriormente ser possível analisar os dados e as dificuldades encontradas, de modo a aplicar-se as ferramentas Lean. Apesar de serem abordadas várias ferramentas Lean neste trabalho, foram trabalhadas mais detalhadamente as seguintes: - Value Stream Mapping (VSM); - Single Minute Exchange of Dies (SMED); - Balanceamento da linha. De modo a ser percetível o conteúdo e as vantagens das três ferramentas Lean mencionadas no trabalho, estas foram aplicadas e simuladas, de forma a existir uma componente prática no seu estudo, para mais fácil compreensão e rápida aprendizagem.