890 resultados para HIRFL-CSR
Resumo:
以 4 0 0 Me V/u的 2 38U91 +为例 ,用电子冷却模拟程序计算了冷却时间随冷却段长度、冷却段磁感应强度、磁场平行度、电子密度、电子束半径、电子温度的变化规律 ,并分析了影响冷却时间的因素 ,获得了电子冷却装置最优参数。
Resumo:
以难度最大的快引出 KICKER磁铁为例 ,介绍了兰州重离子加速器冷却储存环注入引出 KICKER磁铁和电源设计的基本概念和所达到的指标
Resumo:
考虑储存环内离子在纵向相空间的运动特性 ,模拟了HIRFL CSR主环内重离子的加速过程。给出了粒子不同时刻在纵向相空间的分布 ,在给出主磁场的运行模式后 ,得到高频频率、同步相位、高频电压、束流长度、动量散度以及粒子能量随时间的变化等主要参数
Resumo:
为了减少真空系统中残余气体分子对离子束造成的损失 ,要求重离子冷却储存环的平均工作真空度达到 3× 10 -9Pa( N2 等效压力 )。在大系统中达到如此高的真空度在我国尚属首例。围绕如何达到这个设计指标的问题 ,本文从真空系统布局、真空室材料、结构及加工焊接要求、降低材料表面出气率的措施、真空系统配置、烘烤系统设计、真空系统控制要求、真空压力分布等方面介绍了我们的设计方案
Resumo:
We report some recent progress in constraining the symmetry energy E-sym(rho) at high densities using high-energy heavy-ion collisions. Circumstantial evidence of a soft E-sym(rho) at supra-saturation density is obtained by comparing the pion ratio pi(-)/pi(+) measured recently with FOPI at GSI and the IBUU04 model calculations. Detailed studies indicate that the power of determining the E-sym(rho)from pi(-)/pi(+) is enhanced with decreasing the beam energy to near the pion production threshold, showing a correlation to the increasing nuclear stopping. Among several heavy-ion reaction facilities in the world, the cooling storage ring (HIRFL-CSR), newly commissioned at Lanzhou, delivering heavy-ion beams up to 1 A GeV, to be coupled with advanced detectors will contribute significantly to further studies of the equation of state of asymmetric nuclear matter.
Resumo:
The construction and commissioning of HIRFL-CSR were finished in 2007. From 2000 to 2005 the subsystem and key devices of CSR were successfully fabricated, such as magnet, power supply, UHV system, e-cooler, electric-static deflector with the septum of 0.1 mm, and the fast-pulse kicker with the rise time of 150 ns. After that the CSR commissioning activities were performed in 2006 and 2007, including the accumulation of those heavy ions of C, Ar, Kr and Xe by the combination of stripping injection (STI) or multiple multi-turn injection (MMI) and e-cooling with a hollow e-beam, wide energy-range synchrotron ramping by changing the RF harmonic-number at mid-energy, the beam stacking in the experimental ring CSRe, the RIBs mass-measurement with the isochronous-mode in CSRe by using the time-of-flight method, and the ion beam slow-extraction from CSRm.
Resumo:
The national science project HIRFL-CSR has recently been officially accepted. As a cyclotron and synchotron complex, it puts some particularly high demands on the control system. There are hundreds of pieces of equipment that need to be synchronized. An integrated timing control system is built to meet these demands. The output rate and the accuracy of the controller are 16 bit/mu s. The accuracy of the time delay reaches 40 ns. The timing control system is based on a typical event distribution system, which adopts the new event generation and the distribution scheme. The scheme of the tuning control system with innovation points, the architecture and the implemented method are presented in the paper.
Resumo:
The magnet design, fabrication, and measurement of HIRFL-CSR (Heavy Ion Research Facility in Lanzhou Cooling Storage Ring) are presented. All magnets will be laminated And welded with an armor-coated surface between two big endplates made of sticking glue 0.5 mm-thick sheets. The dipole of CSRm was chosen an H type with an air circle on the pole to improve the field uniformity. The dipole of CSRe was chosen the C type with an air circle and two air slots on the pole to improve the field homogeneity. Its reproducibility of magnet to magnet was adjusted with inserting small laminating pieces before demountable pole ends to reach less than +/- 2 x 10(-4) at optimized field level. CSRm quadrupoles diameter is 170 mm and has two different lengths, and its endplates were made with punching pieces after coating with epoxy glue, there is chamfered directly on the pole ends to reduce 12th-order contribution of field and without the demountable pole ends. CSRe main quadrupoles diameter is 240 mm and has two different lengths, and its endplates were also made with punching pieces coated with epoxy glue, there is also chamfered directly on the pole ends to reduce 12th-order contribution of field like CSRm.
Resumo:
The charge stripping injection method has been adopted for the accumulation of light heavy ions in HIRFL-CSR. This method has some special requirements for the accelerating particles, and at the same time the structure of the injection orbit has to be changed. In this paper, the design of the orbit has been presented, as well as the calculation of the beam line matching. According to the result of commissioning, stripping injection can accumulate the beam to a higher current.
Resumo:
Small-angle multiple intrabeam scattering (IBS) is an important effect for heavy-ion storage rings with electron cooling, because the cooling time is determined by the equilibrium between cooling and IBS process. All usually used numerical algorithms of IBS growth rate calculations are based on the model of the collisions proposed by A.Piwinski, but this result is a multidimensional integral. In this paper, the IBS growth rates are simulated for HIRFL-CSR using symmetric elliptic integral method, and compared with several available IBS code results.
Resumo:
A new gas delivery system is designed and installed for HIRFL-CSR cluster target. The original blocked nozzle is replaced by a new one with the throat diameter of 0.12mm. New test of hydrogen and argon gases are performed. The stable jets can be obtained for these two operation gases. The attenuation of the jet caused by the collision with residual gas is studied. The maximum achievable H-2 target density is 1.75x10(13) atoms/cm(3) with a target thickness of 6.3x10(12) atoms/cm(2) for HIRFL-CSR cluster target. The running stability of the cluster source is tested both for hydrogen and argon. The operation parameters for obtaining hydrogen jet are optimized. The results of long time running for H-2 and Ar cluster jets look promising. The jet intensity has no essential change during the test for H-2 and Ar.
Resumo:
With the construction of the new Radioactive Ion Beam Line in Lanzhou (RIBLL II) which connects the CSRm and the CSRe, an experimental setup for physics research is highly required. A large area neutron detection wall is the main part of the setup. This paper introduced the detection principle of the neutron detection wall and the Monte-Carlo simulation of its design under the environment of the Geant4 toolkit. We presented the final design with the optimized parameters and the performance of the wall.
Resumo:
The research activities at HIRFL-CSR cover the fields of the radio-biology, material science, atomic physics, and nuclear physics. This talk will mainly concentrate on the program on nuclear physics with the existing and planned experimental setups at HIRFL-CSR.
Resumo:
The status of the HIRFL (Heavy Ion Facility in Lanzhou) - Cooler Storage Ring (CSR) at the IMP is reported. The main physics goals at the HIRFL-CSR are the researches on nuclear structure and decay property, EOS of nuclear matter, hadron physics, highly charged atomic physics, high energy density physics, nuclear astrophysics, and applications for cancer therapy, space industries, materials and biology sciences. The HIRFL-CSR is the first ion cooler-storage-ring system in China, which consists of a main ring (CSRm), an experimental ring (CSRe) and a radioactive beamline (RIBLL2). The two existing cyclotrons SFC (K=70) and SSC (K=450) are used as its injectors. The 7MeV/u12C6+ ions were stored successfully in CSRm with the stripping injection in January 2006. After that, realized were the accelerations of C-12(6+), Ar-36(18+), Kr-78(28+) and Xe-129(27+) ions with energies of 1GeV/u, 1GeV/u, 450 MeV/u and 235 MeV/u, respectively, including accumulation, electron cooling and acceleration. In 2008, the first two isochronous mass measurement experiments with the primary beams of Ar-36(18+) and Kr-78(28+) were performed at CSRe with the Delta p/p similar to 10(-5).
Resumo:
In order to realize high energy density physics and plasma physics research at HIRFL-CSR, a magnetic alloy (MA)-loaded cavity has been studied. According to the theoretical calculation and simulation for the MA-loaded cavity, we achieved a better result. The MA-loaded cavity had a higher Qf value, with a higher shunt impedance and a higher accelerating gradient. The accelerating gradient was about 95 kV/m at 1.8003 MHz, 130 kV/m at 0.9000 MHz. Compared with the ferrite-loaded cavities that are used at HIRFL-CSR, with about 10 kV/m accelerating gradient, the MA-loaded cavity obviously has an advantage. The results of the theoretical calculation and the simulation, which meet the design requirements are in good agreement.