HIRFL-CSR complex
Data(s) |
2009
|
---|---|
Resumo |
The construction and commissioning of HIRFL-CSR were finished in 2007. From 2000 to 2005 the subsystem and key devices of CSR were successfully fabricated, such as magnet, power supply, UHV system, e-cooler, electric-static deflector with the septum of 0.1 mm, and the fast-pulse kicker with the rise time of 150 ns. After that the CSR commissioning activities were performed in 2006 and 2007, including the accumulation of those heavy ions of C, Ar, Kr and Xe by the combination of stripping injection (STI) or multiple multi-turn injection (MMI) and e-cooling with a hollow e-beam, wide energy-range synchrotron ramping by changing the RF harmonic-number at mid-energy, the beam stacking in the experimental ring CSRe, the RIBs mass-measurement with the isochronous-mode in CSRe by using the time-of-flight method, and the ion beam slow-extraction from CSRm. Supported by National Natural Science Foundation of China (10635090) |
Identificador | |
Idioma(s) |
英语 |
Fonte |
Xia, JW (Xia Jia-Wen); Zhan, WL (Zhan Wen-Long); Wei, BW (Wei Bao-Wen); Yuan, YJ (Yuan You-Jin); Yuan, P (Yuan Ping); Qiao, WM (Qiao Wei-Min); Gao, DQ (Gao Da-Qing); Yang, XT (Yang Xiao-Tian); Man, KD (Man Kai-Di); Xiao, GQ (Xiao Guo-Qing); Zhao, HW (Zhao Hong-Wei); Yang, XD (Yang Xiao-Dong); Cai, XH (Cai Xiao-Hong); Song, MT (Song Ming-Tao); Xu, HS (Xu Hu-Shan); Ma, LZ (Ma Li-Zhen); Liu, Y (Liu Yong); He, Y (He Yuan); Zhou, ZZ (Zhou Zhong-Zu); Zhang, W (Zhang Wei); Xu, Z (Xu Zhe); Mao, RS (Mao Rui-Shi); Zhang, JH (Zhang Jun-Hui); Jing, L (Jing Lan); Yang, YQ (Yang Ya-Qing); Yang, JC (Yang Jian-Cheng); Mao, LJ (Mao Li-Jun); Chen, YX (Chen You-Xin) .HIRFL-CSR complex,CHINESE PHYSICS C,2009,33(9): 804-810 |
Palavras-Chave | #CSR #commissioning #heavy ion #e-cooling #accumulation |
Tipo |
期刊论文 |