899 resultados para Electric Truck Company


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the last decades there was an increase in stress at work and its effects on workers' health. These issues are still little studied in the electric utility sector. This study aims to evaluate factors associated with stress at work and to verify its associations with health status among workers of an electric company in São Paulo State, Brazil. A cross-sectional study was conducted with 474 subjects (87.5% of the eligible workers). Data were collected using self-reported questionnaires. A descriptive analysis, a multiple linear hierarchical regression analysis and a correlation analysis were performed. The majority of participants were males (91.1%) and the mean age was 37.5 yr. The mean score of stress level was 2.3 points (scale ranging from 1.0 to 5.0). Hierarchical multiple analyses showed that: regular practice of physical activities (p=0.025) and individual monthly income (p=0.002) were inversely associated with stress level; BMI was marginally associated with the stress level (p=0.074). The demographic characteristics were not associated with stress. Stress at work was significantly associated with physical and mental health status (p<0.001). To improve health of electric utility workers, actions are suggested to decrease stress by remuneration and an appropriate practice of physical activity aiming reduction of BMI

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the last decades there was an increase in stress at work and its effects on workers' health. These issues are still little studied in the electric utility sector. This study aims to evaluate factors associated with stress at work and to verify its associations with health status among workers of an electric company in Sao Paulo State, Brazil. A cross-sectional study was conducted with 474 subjects (87.5% of the eligible workers). Data were collected using self-reported questionnaires. A descriptive analysis, a multiple linear hierarchical regression analysis and a correlation analysis were performed. The majority of participants were males (91.1%) and the mean age was 37.5 yr. The mean score of stress level was 2.3 points (scale ranging from 1.0 to 5.0). Hierarchical multiple analyses showed that: regular practice of physical activities (p=0.025) and individual monthly income (p=0.002) were inversely associated with stress level; BMI was marginally associated with the stress level (p=0.074). The demographic characteristics were not associated with stress. Stress at work was significantly associated with physical and mental health status (p<0.001). To improve health of electric utility workers, actions are suggested to decrease stress by remuneration and an appropriate practice of physical activity aiming reduction of BMI.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An algorithm inspired on ant behavior is developed in order to find out the topology of an electric energy distribution network with minimum power loss. The algorithm performance is investigated in hypothetical and actual circuits. When applied in an actual distribution system of a region of the State of Sao Paulo (Brazil), the solution found by the algorithm presents loss lower than the topology built by the concessionary company.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

OBJECTIVE: To analyze the putative effect of type of shift and its interaction with leisure-time physical activity on cardiovascular risk factors in truck drivers.METHODS: A cross-sectional study was undertaken on 57 male truck drivers working at a transportation company, of whom 31 worked irregular shifts and 26 worked on the day-shift. Participants recorded their physical activity using the International Physical Activity Questionnaire along with measurements of blood pressure, body mass index and waist-hip ratio. Participants also provided a fasting blood sample for analysis of lipid-related outcomes. Data were analyzed using a factorial model which was covariate-controlled for age, smoking, work demand, control at work and social support.RESULTS: Most of the irregular-shift and day-shift workers worked more than 8 hours per day (67.7% and 73.1%, respectively). The mean duration of experience working the irregular schedule was 15.7 years. Day-shift workers had never engaged in irregular-shift work and had been working as a truck driver for 10.8 years on average. The irregular-shift drivers had lower work demand but less control compared to day-shift drivers (p < 0.05). Moderately-active irregular-shift workers had higher systolic and diastolic arterial pressures (143.7 and 93.2 mmHg, respectively) than moderately-active day-shift workers (116 and 73.3 mmHg, respectively) (p < 0.05) as well as higher total cholesterol concentrations (232.1 and 145 mg/dl, respectively) (p = 0.01). Irrespective of their physical activity, irregular-shift drivers had higher total cholesterol and LDL-cholesterol concentrations (211.8 and 135.7 mg/dl, respectively) than day-shift workers (161.9 and 96.7 mg/dl, respectively (ANCOVA, p < 0.05).CONCLUSIONS: Truck drivers are exposed to cardiovascular risk factors due to the characteristics of the job, such as high work demand, long working hours and time in this profession, regardless of shift type or leisure-time physical activity.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report documents work undertaken in the demonstration of a low-cost Automatic Weight and Classification System (AWACS). An AWACS procurement specification and details of the results of the project are also included. The intent of the project is to support and encourage transferring research knowledge to state and local agencies and manufacturers through field demonstrations. Presently available, Weigh-in-Motion and Classification Systems are typically too expensive to permit the wide deployment necessary to obtain representative vehicle data. Piezo electric technology has been used in the United Kingdom and Europe and is believed to be the basic element in a low-cost AWACS. Low-cost systems have been installed at two sites, one in Portland Cement Concrete (PCC) pavement in Iowa and the other in Asphaltic Cement Concrete (ACC) pavement in Minnesota to provide experience with both types of pavement. The systems provide axle weights, gross vehicle weight, axle spacing, vehicle classification, vehicle speed, vehicle count, and time of arrival. In addition, system self-calibration and a method to predict contact tire pressure is included in the system design. The study has shown that in the PCC pavement, the AWACS is capable of meeting the needs of state and federal highway agencies, producing accuracies comparable to many current commercial WIM devices. This is being achieved at a procurement cost of substantially less than currently available equipment. In the ACC pavement the accuracies were less than those observed in the PCC pavement which is concluded to result from a low pavement rigidity at this site. Further work is needed to assess the AWACS performance at a range of sites in ACC pavements.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Euroopan sähkösektori on ollut viimeisen vuosikymmenen suurten mullistusten kourissa. Sähkömarkkinoiden avautumisen jälkeen monopoliliiketoimintaa harjoittavien sähköyhtiöiden on ollut pakko parantaa tuottavuuttaan. Ratkaisuksi tähän on etsitty apua huolto- ja rakennustoimintojen ulkoistamisella. Ulkoistaminen on kuitenkin uusi menetelmä tällä sektorilla. Tämän tutkielman tavoitteena on selvittää syyt, jotka tanskalaisella sähköverkkoyhtiöllä oli huolto- ja rakennustoimintojen ulkoistamiseen, sekä löytää siitä saatavat hyödyt ja siihen sisältyvät riskit. Tutkimus suoritetaan käyttäen apuna kirjallisuutta, saatavilla olevia due diligence-, sekä muita raportteja ja analyysejä, sekä tapausta koskettavien tahojen haastatteluja.Lisäksi sähköverkkoalan asiantuntijoiden kanssa käytyjä konsultointia käytetäänselvitykseen. Tutkimus osoittaa, että perimmäiset ajurit huolto- ja rakennustoimintojen ulkoistamiseen tulivat lainmuutosten ja vapautuneiden sähkömarkkinoiden asettamista paineista. Kunnallisessa organisaatiossa parantaa tehokkuutta ulkoistamalla jotain toimintoja yksityisomisteiselle palvelun tuottajalle. Muut ulkoistamisesta odotetut hyödyt olivat alentuneet kustannukset, virtaviivaisempi organisaation ja sähköverkkoyhtiön tehottomista osista eroon pääseminen ennen sen myymistä.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of the Thesis was to evaluate the business environment of electrical vehicle charging equipment (EVSE) in USA, find the key issues of entering the US EVSE markets and to form a marketing plan for possible market entry. The external market research analyzed the environment, customers, competitors and demand of EVSEs. In the internal analysis the focus was on resources and capabilities, offering, performance, business relations and US related issues. The research about the business environment was done using already available information from market studies and seminars. In external analysis there were also two semi-structured interviews from market experts used. The internal analysis was done mostly by interviews, but also company’s internal data sources were used. The interviews were semi-constructed and included eight interviewees from each part of EVSE value chain. The research findings were analyzed using SWOT analysis, which was converted to a so called TOWS matrix for extracting strategies. As a result of the Thesis, valuable information about the US markets and their requirements for EVSEs was gained. By matching the strengths of the case company and market requirements, customer segmentation and targeting were done and a marketing plan was constructed for the case company to help their management to evaluate the feasibility of possible market entry and investments to USA.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The theoretical research of the study focused to business process management and business process modeling, the goal was to found a new business process modeling method for electrical accessories manufacturing enterprise. The focus was to find few options for business process modeling methods where company could have chosen the best one for its needs The study was carried out as a qualitative research with an action study and a case study as the most important ways collect data. In the empirical part of the study examples of company’s processes modeled with the new modeling method and process modeling process are presented. The new way of modeling processes improves especially visual presentation of the processes and improves the understanding how employees should work in the organizational interfaces of the process and in the interfaces between different processes. The results of the study is a new unified way to model company’s processes, which makes it easier to understand and create the process models. This improved readability makes it possible to reduce the costs that were created from the unclear old process models.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Russia approved ambitious reform plan for the electricity sector in 2001 including privatisation of the country’s huge thermal generation assets. So far the sector had suffered from power shortages, aging infrastructure, substantial electricity losses, and weak productivity and profitability numbers. There was obvious need for foreign investments and technologies. The reform was rather successful; the generation assets were privatised in auctions in 2007-2008 and three European energy companies, E.On, Enel and Fortum, invested in and obtained together over 10% of the Russian production assets. The novelty of these foreign investments serves unique object for the study. The political risk is involved in the FDI due to the industry’s social and economic importance. The research’s objective was to identify and analyse the political risk that foreign investors face in the Russian electricity sector. The research had qualitative study method and the empirical data was collected by interviewing. The research’s theoretical framework was based on the existing political risk theories and it focused to understand the Russian government in relation to the country’s stability and define both macro-level and micro-level sources of political risk for the foreign direct investments in the sector. The research concludes that the centralised and obscure political decision-making, economic constriction, high level of governmental control in economy and corruption form the country’s internal macro-level risk sources for the foreign investors in the sector. Additionally the retribution due to the companies’ home country actions, possible violent confrontations at the Russian borders and the currency instability are externally originated risk sources. In the electricity industry there is risk of tightened governmental control and increased regulation and taxation. Similarly the company-level risk sources link to the unreformed heating sector, bargaining with the authorities, diplomatic stress between host and home countries and to companies and government’s divergent perspective for the profit-making. The research stresses the foreign companies’ ability to cope with the characteristics of Russian political environment. In addition to frequent political and market risk assessment, the companies need to focus on currency protection against rouble’s rate fluctuation and actively build good company-citizenship in the country. Good relationship is needed with the Russian political authorities. The political risk identification and the research’s conclusive framework also enable political risk study assessments for other industries in Russia

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Welland Power and Supply Canal Company Limited, established in 1893 and incorporated in 1894 with a capital stock of $500,000. The aim of the company was to harness the natural water supply of the Niagara and Welland Rivers. In 1898 the Canadian Electrical News published a report by Henry Symons, QC outlining the main project of the company. This project involves the construction of a canal from the Welland River to the brow of the mountain at Thorold, a distance of 8 miles; the construction at Thorold of a power house, and from Thorold to Lake Ontario, a raceway by which to carry water into the lake. The estimate for the machinery to generate 100,000 horse power is £125,000; for transmission line to Toronto at a voltage of 10,000….The total estimate therefore amounts to £2,452,162, or roughly speaking, $12,000,000. Source: Canadian Electrical News, August 1898, p. 172. In 1899 the company officers petitioned the federal government desiring a name change to the Niagara-Welland Power Company Limited. Officers of the company were Harry Symons, President; Charles A. Hesson, Vice-President; and M.R. O’Loughlin, James B. Sheehan, James S. Haydon, Frederick K. Foster, directors; John S. Campbell, secretary-treasurer. The company’s head offices were located in St. Catharines, with a New York (City) office on Broad Street. In 1905 and 1909 the company petitioned the federal government for additional time to construct its works, which was granted. The company had until May 16, 1915 to complete construction. John S. Campbell (1860-1950) was a graduate of the University of Toronto and Osgoode Hall. During his university years John began his military career first in "K" Company, Queens Own rifles and then later as Commanding Officer of the 19th Lincoln Regiment, from 1906 to 1910. Upon his return to St. Catharines John Campbell served as secretary in the St. Catharines Garrison Club, a social club for military men begun in 1899. After being called to the Bar, he became a partner in the firm of Campbell and McCarron and was appointed to the bench in 1916, serving until retirement in 1934. Judge Campbell served as an alderman for several terms and was the mayor of St. Catharines in 1908 and 1909. He also served as the first chairman of the St. Catharines Public Utilities in 1914. John S. Campbell was married to Elizabeth Oille, daughter of Jerome B. and Charlotte (St. John) Oille. The family home "Cruachan" was located at 32 Church St.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Walter D’Arcy Ryan was born in 1870 in Kentville, Nova Scotia. He became the chief of the department of illumination at the General Electric Company of Schenectady, New York. He was a founder in the field of electrical illumination. He built the electric steam scintillator which had numerous nozzles and valves. The operator would release steam through the valves. The nozzles all had names which included: Niagara, fan, snake, plume, column, pinwheel and sunburst. The steam scintillator was combined with projectors, prismatic reflectors, flashers and filters to produce the desired effects. In 1920 a group of businessmen from Niagara Falls, New York formed a group who called themselves the “generators’. They lobbied the American and Canadian governments to improve the illumination of the Falls. They were able to raise $58, 000 for the purchase and installation of 24 arc lights to illuminate the Falls. On February 24th, 1925 the Niagara Falls Illumination Board was formed. Initially, the board had a budget of $28,000 for management, operation and maintenance of the lights. The power was supplied free by the Ontario Power Company. They had 24 lights installed in a row on the Ontario Power Company surge tank which was next to the Refectory in Victoria Park on the Canadian side. The official opening ceremony took place on June 8th, 1925 and included a light parade in Niagara Falls, New York and an international ceremony held in the middle of the Upper Steel Arch Bridge. Walter D’Arcy Ryan was the illuminating engineer and A.D. Dickerson who was his New York field assistant directed the scintillator. with information from American Technological Sublime by David E. Nye and the Niagara Falls info website Location: Brock University Archives Source Information: Subject Headings: Added Entries: 100 Ryan, W. D’A. |q (Walter D’Arcy), |d 1870-1934 610 General Electric Company 650 Lighting, Architectural and decorative 650 Lighting |z New York (State) |z Niagara Falls 700 Dickerson, A.F. 700 Schaffer, J.W. Related material held at other repositories: The Niagara Falls Museum in Niagara Falls, Ontario has a program (pamphlet) dedicating new lighting in 1958 and it has postcards depicting the illumination of the Falls. Some of Ryan’s accomplishments can be seen at The Virtual Museum of the City of San Francisco. Described by: Anne Adams Date: Sept 26,Upper Steel Arch Bridge. Walter D’Arcy Ryan was the illuminating engineer and A.D. Dickerson who was his New York field assistant directed the scintillator. with information from American Technological Sublime by David E. Nye and the Niagara Falls info website

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A letter from 2nd Vice President and General Manager of Canadian General Electric Company, Frederic Nicholls to W. B. Rankine regarding a bid for contract. The letter mentions that the bid for two alternating generators for the Canadian side of Niagara Falls was won by Westinghouse Eletric and Manufacturing Co. Nicholls also mentions that there will be other opportunites to win contracts as more machines are required. Nicholls also implies that Westinghouse may have bid under cost in an effort to secure the first of many contracts with the Canadian Niagara Power Company.