918 resultados para Airworthiness and Quality Management System


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian Commission on Safety and Quality in Health Care commissioned this rapid review to identify recent evidence in relation to three key questions: 1. What is the current evidence of quality and safety issues regarding the hospital experience of people with cognitive impairment (dementia/delirium)? 2. What are the existing evidence-based pathways, best practice or guidelines for cognitive impairment in hospitals? 3. What are the key components of an ideal patient journey for a person with dementia and/or delirium? The purpose of this review is to identify best practice in caring for patients with cognitive impairment (CI) in acute hospital settings. CI refers to patients with dementia and delirium but can include other conditions. For the purposes of this report, ‘Hospitals’ is defined as acute care settings and includes care provided by acute care institutions in other settings (e.g. Multipurpose Services and Hospital in the Home). It does not include residential aged care settings nor palliative care services that are not part of a service provided by an acute care institution. Method Both peer-reviewed publications and the grey literature were comprehensively searched for recent (primarily post 2010) publications, reports and guidelines that addressed the three key questions. The literature was evaluated and graded according to the National Health and Medical Research Council (NHMRC) levels of criteria (see Evidence Summary – Appendix B). Results Thirty-one recent publications were retrieved in relation to quality and safety issues faced by people with CI in acute hospitals. The results indicate that CI is a common problem in hospitals (upwards of 30% - the rate increases with increasing patient age), although this is likely to be an underestimate, in part, due to numbers of patients without a formal dementia diagnosis. There is a large body of evidence showing that patients with CI have worse outcomes than patients without CI following hospitalisation including increased mortality, more complications, longer hospital stays, increased system costs as well as functional and cognitive decline. 4 To improve the care of patients with CI in hospital, best practice guidelines have been developed, of which sixteen recent guidelines/position statements/standards were identified in this review (Table 2). Four guidelines described standards or quality indicators for providing optimal care for the older person with CI in hospital, in general, while three focused on delirium diagnosis, prevention and management. The remaining guidelines/statements focused on specific issues in relation to the care of patients with CI in acute hospitals including hydration, nutrition, wandering and care in the Emergency Department (ED). A key message in several of the guidelines was that older patients should be assessed for CI at admission and this is particularly important in the case of delirium, which can indicate an emergency, in order to implement treatment. A second clear mess...

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The majority of children cease napping between 3 and 5 years of age yet, internationally, the allocation of a sleep time during the day for children of this age remains a practice in many early childhood education (ECE) settings. These dual circumstances present a disjuncture between children's sleep needs and center practices, that may cause conflict for staff, increase stress for children and escalate negative emotional climate in the room. Testing this hypothesis requires observation of both the emotional climate and behavioral management used in ECE rooms that extends into the sleep time. This study was the first to apply the Classroom Assessment and Scoring System (CLASS) Pre-K (Pianta, La Paro, & Hamre, 2008) to observe the emotional climate and behavioral management during sleep time. Pilot results indicated that the CLASS Pre-K functioned reliably to measure emotional climate and behavioral management in sleep time. However, new sleep-specific examples of the dimensions used were developed, to help orient fieldworkers to the CLASS Pre-K rating system in the sleep time context. The CLASS was then used to assess emotional climate and behavior management between the non-sleep and sleep time sessions, in 113 ECE rooms in Queensland, Australia. In these rooms 2.114 children were observed. Of these children, 71% did not sleep at any point during the allotted sleep times. There was a significant drop in emotional climate and behavioral management between the non-sleep and sleep-time sessions. Furthermore, the duration of mandated sleep time (a period of time where no activities are provided to non-sleeping children) accounted for significant independent variance in the observed emotional climate during sleep-time. The CLASS Pre-K presents a valuable tool to assess the emotional climate and behavior management during sleep-time and draws attention to the need for further studies of sleep time in ECE settings.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Central Queensland Mine Rehabilitation Group (CQMRG) has hosted mine site rehabilitation inspections combined with technical workshops for more than 20 years. It was recognised at CQMRG's anniversary meeting in April 2013 that the vast body of knowledge held by rehabilitation and closure planning practitioners was being lost as senior rehabilitation experts retire from the industry. It was noted that even more knowledge could be readily lost unless a knowledge management platform was developed to capture, store and enable retrieval of this information. This loss of knowledge results in a significant cost to industry. This project was therefore undertaken to review tools which have the capability to gather the less formal knowledge as well as to make links to existing resources and bibliographic material. This scoping study evaluated eight alternative knowledge management systems to provide guidance on the best method of providing the industry with an up-to-date, good practice, knowledge management system for rehabilitation and closure practices, with capability for information sharing via a portal and discussion forum. This project provides guidance for a larger project which will implement the knowledge management system to meet the requirements of the CQMRG and be transferrable to other regions if applicable. It will also provide the opportunity to identify missing links between existing tools and their application. That is, users may not be aware of how these existing tools can be used to assist with mine rehabilitation planning and implementation and the development of a new platform will help to create those linkages. The outcomes of this project are directed toward providing access to a live repository of rehabilitation practice information which is Central Queensland coal mine-specific, namely: highlighting best practice activities, results of trials and innovative practices; updated legislative requirements; links to practices elsewhere; and informal anecdotal information relevant to particular sites which may be of assistance in the development of rehabilitation of new areas. Solutions to the rehabilitation of challenging spoils/soils will also be provided. The project will also develop a process which can be applied more broadly within the mining sector to other regions and other commodities. Providing a platform for uploading information and holding discussion forums which can be managed by a regional practitioner network enables the new system to be kept alive, driven by users and information needs as they evolve over time. Similar internet-based platforms exist and are managed successfully. The preferred knowledge management system will capture the less formal and more difficult to access knowledge from rehabilitation and mine closure practitioners and stakeholders through the CQMRG and other contributors. It will also provide direct links, and greater accessibility, to more formal sources of knowledge with anticipated cost savings to the industry and improved rehabilitation practices with successful transitioning to closure and post-mining land use.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report summarises work conducted by the QDPI, in partnership with the South Burdekin Water Board (SBWB) and the Burdekin Shire Council (BSC) between 2001 and 2003. The broad aim of the research was to assess the potential of native fish as biocontrol agents for noxious weeds, as part of an integrated program for managing water quality in the Burdekin Irrigation Area. A series of trials were conducted at, or using water derived from, the Sandy Creek Diversion near Groper Creek (lower Burdekin delta). Trials demonstrated that aquatic weeds play a positive role in trapping transient nutrients, until such time that weed growth becomes self-shading and weed dieback occurs, which releases stored nutrients and adversely affects water quality. Transient nutrient levels (av. TN<0.5mg/L; av. TP<0.1mg/L) found in the irrigation channel during the course of this research were substantially lower than expected, especially considering the intensive agriculture and sewage effluent discharge upstream from the study site. This confirms the need to consider the control of weeds rather than complete weed extermination when formulating management plans. However, even when low nutrient levels are available, there is competitive exploitation of habitat variables in the irrigation area leading to succession and eventual domination by certain weed species. During these trials, we have seen filamentous algae, phytoplankton, hyacinth and curled pondweed each hold competitive advantage at certain points. However without intervention, floating weeds, especially hyacinth, ultimately predominate in the Burdekin delta due to their fast propagation rate and their ability to out-shade submerged plants. We have highlighted the complexity of interactions in these highly disturbed ecosystems in that even if the more prevalent noxious weeds are contained, other weed species will exploit the vacant niche. This complexity places stringent requirements on the type of native fish that can be used as biocontrol agents. Of the seven fish species identified with herbivorous trophic niches, most target plankton or algae and do not have the physical capacity to directly eat the larger macrophytes of the delta. We do find however that following mechanical weed harvesting, inoculative releases of fish can slow the rate of hyacinth recolonisation. This occurs by mechanisms in addition to direct weed consumption, such as disturbing growth surfaces by grazing on attached biofilms. Predation by birds and water rats presents another impediment to the efficacy of large-scale releases of fish. However, alternative uses of fish in water quality management in the Burdekin irrigation area are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Rapid growth in the global population requires expansion of building stock, which in turn calls for increased energy demand. This demand varies in time and also between different buildings, yet, conventional methods are only able to provide mean energy levels per zone and are unable to capture this inhomogeneity, which is important to conserve energy. An additional challenge is that some of the attempts to conserve energy, through for example lowering of ventilation rates, have been shown to exacerbate another problem, which is unacceptable indoor air quality (IAQ). The rise of sensing technology over the past decade has shown potential to address both these issues simultaneously by providing high–resolution tempo–spatial data to systematically analyse the energy demand and its consumption as well as the impacts of measures taken to control energy consumption on IAQ. However, challenges remain in the development of affordable services for data analysis, deployment of large–scale real–time sensing network and responding through Building Energy Management Systems. This article presents the fundamental drivers behind the rise of sensing technology for the management of energy and IAQ in urban built environments, highlights major challenges for their large–scale deployment and identifies the research gaps that should be closed by future investigations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background The leading causes of morbidity and mortality for people in high-income countries living with HIV are now non-AIDS malignancies, cardiovascular disease and other non-communicable diseases associated with ageing. This protocol describes the trial of HealthMap, a model of care for people with HIV (PWHIV) that includes use of an interactive shared health record and self-management support. The aims of the HealthMap trial are to evaluate engagement of PWHIV and healthcare providers with the model, and its effectiveness for reducing coronary heart disease risk, enhancing self-management, and improving mental health and quality of life of PWHIV. Methods/Design The study is a two-arm cluster randomised trial involving HIV clinical sites in several states in Australia. Doctors will be randomised to the HealthMap model (immediate arm) or to proceed with usual care (deferred arm). People with HIV whose doctors are randomised to the immediate arm receive 1) new opportunities to discuss their health status and goals with their HIV doctor using a HealthMap shared health record; 2) access to their own health record from home; 3) access to health coaching delivered by telephone and online; and 4) access to a peer moderated online group chat programme. Data will be collected from participating PWHIV (n = 710) at baseline, 6 months, and 12 months and from participating doctors (n = 60) at baseline and 12 months. The control arm will be offered the HealthMap intervention at the end of the trial. The primary study outcomes, measured at 12 months, are 1) 10-year risk of non-fatal acute myocardial infarction or coronary heart disease death as estimated by a Framingham Heart Study risk equation; and 2) Positive and Active Engagement in Life Scale from the Health Education Impact Questionnaire (heiQ). Discussion The study will determine the viability and utility of a novel technology-supported model of care for maintaining the health and wellbeing of people with HIV. If shown to be effective, the HealthMap model may provide a generalisable, scalable and sustainable system for supporting the care needs of people with HIV, addressing issues of equity of access. Trial registration Universal Trial Number (UTN) U111111506489; ClinicalTrial.gov Id NCT02178930 submitted 29 June 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

What are the main elements of successful Key Account Management (KAM)? What is the nature of quality for the company and for the individual in business-to-business relationships? What kind of managerial practices are required at the company and individual level in Key Account Management? This paper focuses on these central aspects of KAM. It describes the main elements of KAM, which is a systematic marketing management approach in the business-to-business context with the objective to build profitable and long-lasting relationships with major accounts. Although paying customers in the business-to-business market are organizations, they are always represented by individuals. Thus, successful KAM requires appropriate handling of both the organizational and the individual levels. This paper describes the nature of quality for the company and for the individual in business-to-business relationships. As a synthesis, this paper suggests a framework for KAM practices deploying the main elements of KAM and the company and individual levels of business-to-business relationships. The weakness of the traditional quality management approach is that it pays little, if any, attention to customer importance. By providing similar quality to each customer, more important customers are penalized and less important customers are rewarded. This paper broadens the traditional quality management approach by introducing the concept of targeted quality based on customer importance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Busca identificar como o sistema regulatório britânico se desenvolveu nos últimos anos contribuindo para a melhoria da regulação no país. Aborda o tema da qualidade legislativa no Reino Unido.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Hybrids of Clariid catfishes; C. gariepinus (Netherlands), C. anguillaris, H. bidorsalis and their parental species were monitored for 8 weeks in 2 x 2 x 1m outdoor concrete tanks. The fry were fed NIFFR diet (40% crude protein) twice daily, 7 days of the week. Growth and survival records were taken weekly. The male HEB X female CLG hybrid showed an overall highest performance in growth rate while the lowest was recorded in male CLA X female CLG hybrid. The male HEB X female CLG hybrid grew at a faster rate than its reciprocal hybrid. In view or their growth rate, it is possible that the growth and survival rates or H. bidorsalis especially at the fry to fingerling stage could be improved through hybridization. The hybrid have potential as commercial food fish

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Common carp (Cyprinus carpio) breeding has a long tradition in Hungary. However, recent economic changes in Eastern Europe and new developments in aquaculture necessitated the need for ensuring quality of the brood stock used in hatcheries and the legal and institutional frameworks needed to implement the program. In addition to good research and development programs and gene banking, it became essential to establish an appropriate legal framework, organize, coordinate and control breeding activities, and provide financial support. It was a major breakthrough for carp breeding when C.carpio was recognized as one of the cultivated animals in the Animal Breeding Act in 1993. The Carp Breeding Section of the Hungarian Fish Producers Association plays an important role in carp breeding programs. Thirteen breeding farms of the Carp Breeding Section have 24 certified C.carpio varieties. In Hungary, about 80 % of the seed used as stocking for commercial production are from high quality certified breeders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

On-farm research on enhancement of P. monodon production through water quality management was carried out in five ghers of Paikgacha, Khulna. Based on the prevailing condition of the ghers, lime in the form of CaCO(sub 3), urea and TSP were used as the major inputs to minimize the soil-water acidity and to ensure the availability of natural food particles in the water bodies. Exchange of water at required level also practiced for the qualitative improvement of culture water. Ghers of varying sizes showed that water quality management and fertilization have a positive impact on production performance of P. monodon (61.59% increment) that yielded an average production of 385.43 kg/ha/crop against the present traditional rate of 238.50 kg/ha/year.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A total of four experiments were conducted to develop nursery management system for the two important native catfishes viz. stinging catfish, Heteropneustes fossilis and walking catfish, Clarias batrachus during 2003 and 2004. Two experiments were conducted in on-station condition to determine stocking density efficacy in hapa and in earthen mini ponds for H. fossilis. This was followed by on-farm trial on stocking density in earthen mini ponds. In hapa, the highest survival rate was 60% for H. fosssilis at stocking density of 100/square meter; followed by 54.5 and 50% at stocking densities of 150 and 200/square meter, respectively. Similarly, gain in weight and length was also better in lower stocking densities. Similar survival rate (45 to 55%) was observed in three densities in earthen mini ponds. However, gain in weight and length showed no significant (p<0.05) differences. H. fossilis, C. batrachus showed almost similar survival rates (57.5-59.0%) in all the three stocking densities (100, 150 and 200/square meter) in earthen mini ponds in on-station condition. In terms of gain in weight and length showed no significant (p<0.05) differences in pond conditions. Almost similar result was obtained in terms of growth and survival in on-farm condition.