Flood-plain and channel-aggradation rates were estimated at selected bridge sites in central and eastern Iowa using four aggradation-measurement methods. Aggradation rates were quantified at 10 bridge sites on the Iowa River upstream of Coralville Lake and at two bridge sites in the central part of Skunk River Basin. Measurement periods used to estimate average aggradation rates ranged in length from 1 to 98 years and varied among methods and sites. A direct comparison cannot be made between aggradation rates calculated using each of the four measurement methods because of differences in time periods and aggradational processes that were measured by each method.
Resumo:
The Iowa demonstration project to promote the rehabilitation of bridge deck concrete by rebonding delaminations with injected epoxy is a 150 ft x 150 ft high truss bridge on Iowa route No. 210 over Indian Creek near Maxwell in Story County (Service level D, AADT-730, Inventory Rating HS-16.9, Operating Rating HS-25). The objective of this study was to evaluate the effectiveness of repairing a delaminated bridge deck by epoxy injection, specifically a bridge deck with a delaminated portland cement concrete overlay. Observations noted during the project lead to the following conclusions: The delaminations rebonded with epoxy have remained solid through five years. The percentage of delamination has stayed essentially the same for both the epoxy injected and non-repaired areas. Epoxy injection appears to be a practical, cost effective alternative to other forms of deck rehabilitation when undertaken at the proper time. Cost effectiveness would reduce dramatically if delayed until breakouts have occurred. On the other hand it would be a slow, labor intensive process if undertaken too early when delaminations are small.
Resumo:
The current shortage of highway funds precludes the immediate replacement of most of the bridges that have been evaluated as structurally deficient or functionally obsolete or both. A low water stream crossing (LWSC) affords an economical alternative to the replacement of a bridge with another bridge in many instances. However, the potential liability that might be incurred from the use of LWSCs has served as a deterrent to their use. Nor have guidelines for traffic control devices been developed for specific application to LWSCs. This research addressed the problems of liability and traffic control associated with the use of LWSCs. Input to the findings from this research was provided by several persons contacted by telephone plus 189 persons who responded to a questionnaire concerning their experience with LWSCs. It was concluded from this research that a significant potential for accidents and liability claims could result from the use of LWSCs. However, it was also concluded that this liability could be reduced to within acceptable limits if adequate warning of the presence of an LWSC were afforded to road users. The potential for accidents and liability could further be reduced if vehicular passage over an LWSC were precluded during periods when the road was flooded. Under these conditions, it is believed, the potential for liability from the use of an LWSC on an unpaved, rural road would be even less than that resulting from the continuing use of an inadequate bridge. The signs recommended for use in advance of an LWSC include two warning signs and one regulatory sign with legends as follows: FLOOD AREA AHEAD, IMPASSABLE DURING HIGH WATER, DO NOT ENTER WHEN FLOODED. Use of the regulatory sign would require an appropriate resolution by the Board of Supervisors having responsibility for a county road. Other recommendations include the optional use of either a supple mental distance advisory plate or an advisory speed plate, or both, under circumstances where these may be needed. It was also recommended HR-218 Liability & Traffic Control Considerations for Low Water Stream Crossings that LWSCs be used only on unpaved roads and that they not be used in locations where flooding of an LWSC would deprive dwelling places of emergency ground access.
Resumo:
The Iowa Department of Transportation is responsible for maintaining approximately 3800 bridges throughout the State. Of these bridges approximately 3200 have concrete decks. The remaining bridges have been constructed or repaired with a Portland Cement (P. C.) concrete overlay. Surveys of the overlays have indicated a growing incidence of delaminations and surface distress. The need to replace or repair the overlay may be dictated by the amount of delamination in the deck. Additionally, the concrete bridges are periodically inspected and scheduled for the appropriate rehabilitation. Part of this analysis is an assessment of the amount of delamination present in the deck. The ability to accurately and economically identify delamination in overlays and bridge decks is necessary to cost-effectively evaluate and schedule bridge rehabilitation. There are two conventional methods currently being used to detect delaminations. One is ref erred to as a chain drag method. The other a electro-mechanical sounding method (delamtect). In the chain drag method, the concrete surface is struck using a heavy chain. The inspector then listens to the sound produced as the surface is struck. The delaminated areas produce a dull sound as compared to nondelaminated areas. This procedure has proved to be very time consuming, especially when a number of small areas of delamination are present. With the · electro-mechanical method, the judgement of the inspector has been eliminated. A· device with three basic components, a tapping device, a sonic receiver, and a system of signal interpretation has been developed. This· device is wheeled along the deck and the instrument receives and interprets the acoustic signals generated by the instrument which in turn are reflected through the concrete. A recently developed method of detecting delaminations is infrared thermography. This method of detection is based on the difference in surface temperature which exists between delaminated and nondelaminated concrete under certain atmospheric conditions. The temperature difference can reach 5°C on a very sunny day where dry pavement exists. If clouds are present, or the pavement is wet, then the temperature difference between the delaminated and nondelaminated concrete will not be as great and therefore more difficult to detect. Infrared thermography was used to detect delaminations in 17 concrete bridge decks, 2 P. C. concrete overlays, and 1 section of continuously reinforced concrete pavement (CRCP) in Iowa. Thermography was selected to assess the accuracy, dependability, and potential of the infrared thermographic technique.
Resumo:
The archaeological site of Cuyacabras (Quintanar de la Sierra, Burgos) is one of main early medieval reference settlements in Upper Arlanza basin lands and it attracts a great amount of visitors. The monumental featured half-caved church and the necropolis consisting of several burials dug into the rock present around the whole area are material evidences of an ancient hill town which has remained uninhabited from middle XIIIth century. New fieldworks on this whole site, excavated during the sixties, have been focused on improving the scientific impact of the site and setting up to date the records and information entries for the necropolis. All obtained data emphasize the weakness of several principles used to put in value the settlement, and they also suggest a revision of several-year-old discussions on one hand, and on the other one, they encourage scholars to propound new up to date theories which will fi t better with our knowledge"s current context.
Resumo:
Research funds were approved for the purchase of equipment designed to proportion and inject epoxy resins into delaminated areas of bridge decks. Through investigation and refining of this process, it was anticipated that a maintenance procedure would be developed to delay spalling of bridge decks by "gluing down" delaminated areas before spalling occurred.
Resumo:
The Iowa Department of Transportation used a high molecular weight methacrylate (HMWM) resin to seal a 3,340 ft. x 64 ft. bridge deck in October 1986. The sealing was necessary to prevent deicing salt brine from entering a substantial number of transverse cracks that coincided with the epoxy coated top steel and unprotected bottom steel. HMWM resin is a three component product composed of a monomer, a cumene hydroperoxide initiator and a cobalt naphthenate promoter. The HMWM was applied with a dual spray bar system and flat-fan nozzles. Initiated monomer delivered through one spray bar was mixed in the air with promoted monomer from the other spray bar. The application rate averaged 0.956 gallons per 100 square feet for the tined textured driving lanes. Dry sand was broadcast on the surface at an average coverage of 0.58 lbs. per square yard to maintain friction. Coring showed that the HMWM resin penetrated the cracks more than two inches deep. Testing of the treated deck yielded Friction Numbers averaging 33 with a treaded tire compared to 36 prior to treatment. An inspection soon after treatment found five leaky cracks in one of the 15 spans. One inspection during a steady rain showed no leakage, but leakage from numerous cracks occurred during a subsequent rain. A second HMWM application was made on two spans. Leakage through the double application occurred during a rain. Neither the single or double application were successful in preventing leakage through the cracks.
Resumo:
Many reports have been written concerning investigations of concrete sealants. The primary concern of most investigators is the protection of bridge decks from de-icing chemicals which cause surface scaling and, when allowed to permeate to reinforcing steel, result in deep spalling and general concrete deterioration. The problem of protecting abutments and pier tops from salt solutions entails a significantly different approach than the problem of protecting bridge decks. The epoxy resins become eligible as a protective material since one need not be concerned with slipperiness or its abrasive characteristics. Protection with linseed oil at regular intervals would prove bothersome because of the inaccessibility of pier tops after the deck is placed. The primary purpose of this investigation was to evaluate various commercial products in terms of their ability to prevent concrete scaling of bridge abutments and pier tops which are subject to salt water deterioration.
Resumo:
The large concrete placements at the Burlington Bridge were expected to cause great temperature differentials within the individual placements. In an attempt to reduce cracking due to the large temperature differentials, the Iowa Department of Transportation required that contractors continuously monitor the temperatures and temperature differentials in the concrete placement to assure that the temperature differentials did not exceed 35 deg F. It was felt that if temperature differentials remained below 35 deg F, cracking would be minimized. The following is a summary of the background of the project, and what occurred during individual concrete placements. The following conclusions were drawn: 1) Side temperatures are cooler and more greatly affected by ambient air temperatures; 2) When the 35 deg F limit was exceeded, it was almost exclusively the center to side differential; 3) The top temperature increases substantially when a new pour is placed; 4) The use of ice and different cement types did seem to affect the overall temperature gain and the amount of time taken for any one placement to reach a peak, but did not necessarily prevent the differentials from exceeding the 35 deg F limit, nor prevent cracking in any placement; and 5) Larger placements have a greater tendency to exceed the differential limit.
Resumo:
During the last two decades, endoscopic endonasal approach has completed the minimally invasive skull base surgery armamentarium. Endoscopic endonasal skull base surgery (EESBS) was initially developed in the field of pituitary adenomas, and gained an increasing place for the treatment of a wide variety of skull base pathologies, extending on the midline from crista galli process to the occipitocervical junction and laterally to the parasellar areas and petroclival apex. Until now, most studies are retrospective and lack sufficient methodological quality to confirm whether the endoscopic endonasal pituitary surgery has better results than the microsurgical trans-sphenoidal classical approach. The impressions of the expert teams show a trend toward better results for some pituitary adenomas with the endoscopic endonasal route, in terms of gross total resection rate and probably more comfortable postoperative course for the patient. Excepting intra- and suprasellar pituitary adenomas, EESBS seems useful for selected lesions extending onto the cavernous sinus and Meckel's cave but also for clival pathologies. Nevertheless, this infatuation toward endoscopic endonasal approaches has to be balanced with the critical issue of cerebrospinal fluid leaks, which constitutes actually the main limit of this approach. Through their experience and a review of the literature, the authors aim to present the state of the art of this approach as well as its limits.
Resumo:
"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 3 - Road and Bridge Design. This module provides hands on examples of how to use metric measurements in the design of roads and structures.
Resumo:
This metric short course was developed in response to a request from the Office of Bridges and Structures to assist in the training of engineers in the use of metric units of measure which will be required in all highway designs and construction after September 30, 1996 (CFR Presidential Executive Order No. 12770). The course notes which are contained in this report, were developed for a half-day course. The course contains a brief review of metrication in the U.S., metric units, prefixes, symbols, basic conversions, etc. The unique part of the course is that it presents several typical bridge calculations (such as capacity of reinforced concrete compression members, strength of pile caps, etc.) worked two ways: inch-pound units throughout with end conversion to metric and initial hard conversion to metric with metric units throughout. Comparisons of partial results and final results (obtained by working the problems the two ways) are made for each of the example problems.
Resumo:
The objective of this research was to evaluate two experimental D.S. Brown, Type SL450 and one D.S. Brown, Type SL750 expansion assemblies to identify possible construction problems and to determine the long term performances. These joints were installed in Wapello County on Jefferson Street viaduct in Ottumwa, Iowa. Visual inspections were made yearly. There is an indication that there may be a slow leakage at all three joints. The joint assemblies have performed well.
Resumo:
The objective of this research was to evaluate two experimental Acme MSB neoprene expansion assemblies to identify possible construction problems and to determine the long term performance. These joints were installed in Black Hawk County on the curved bridge of ramp H from US 218 to I-380 in Waterloo, Iowa. Visual inspections were made yearly. There is slow leakage at one joint and indication that there is some slow leakage of both joints. The joint assemblies have performed well.