Bridge Deck Rehabilitation Rebonding a Delaminated PCC Overlay By Epoxy Injection, HR-1036, 1989


Autoria(s): Desconhecido
Data(s)

01/01/1989

Resumo

The Iowa demonstration project to promote the rehabilitation of bridge deck concrete by rebonding delaminations with injected epoxy is a 150 ft x 150 ft high truss bridge on Iowa route No. 210 over Indian Creek near Maxwell in Story County (Service level D, AADT-730, Inventory Rating HS-16.9, Operating Rating HS-25). The objective of this study was to evaluate the effectiveness of repairing a delaminated bridge deck by epoxy injection, specifically a bridge deck with a delaminated portland cement concrete overlay. Observations noted during the project lead to the following conclusions: The delaminations rebonded with epoxy have remained solid through five years. The percentage of delamination has stayed essentially the same for both the epoxy injected and non-repaired areas. Epoxy injection appears to be a practical, cost effective alternative to other forms of deck rehabilitation when undertaken at the proper time. Cost effectiveness would reduce dramatically if delayed until breakouts have occurred. On the other hand it would be a slow, labor intensive process if undertaken too early when delaminations are small.

Formato

pdf

Identificador

http://publications.iowa.gov/16401/1/IADOT_hr1036_Brdg_Deck_Rehab_Rebond_Dela_PCC_Ovrly_Ep_Inj_1989.pdf

(1989) Bridge Deck Rehabilitation Rebonding a Delaminated PCC Overlay By Epoxy Injection, HR-1036, 1989. Transportation, Department of

Idioma(s)

en

Relação

http://publications.iowa.gov/16401/

Palavras-Chave #Pavements #Transportation #Roads and highways #Research
Tipo

Departmental Report

NonPeerReviewed