923 resultados para Construction Project Delivery


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Morris' (1986) analysis of the factors affecting project success and failure is considered in relation to the psychology of judgement under uncertainty. A model is proposed whereby project managers may identify the specific circumstances in which human decision-making is prone to systematic error, and hence may apply a number of de-biasing techniques.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Australian Government and most Australian road authorities have set ambitious greenhouse gas emission (GHGe) reduction targets for the near future, many of which have translated into action plans. However, previous research has shown that the various Australian state road authorities are at different stages of implementing ‘green’ initiatives in construction planning and development, with considerable gaps in their monitoring, tendering, and contracting. This study illustrates the differences between procurement standards and project specific practices that aim to reduce GHGe from road construction projects in three of the largest Australian road construction clients, with a focus on the tools used, contract type and incentives for better performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many countries face enormous development challenges in adapting to demographic change, urbanisation and emerging issues such as housing affordability and climate change. These challenges are best resolved in consultation with communities rather than in conflict with them. A rich tradition of research and intellectual frameworks exist in the fields of urban geography and planning to understand and manage community concerns during the pre-development approval stages of new projects. However current theoretical frameworks are inadequate in construction management and a new research agenda is needed to develop conceptual frameworks to guide thinking about the role of communities in the construction process. By discussing the components of such a model, it is concluded that this would require a fundamental shift in thinking which challenges traditional structuralist paradigms. A new constructivist paradigm is presented that conceives community consultation as a negotiation process which does not stop at the pre-development planning stages but which continues over the entire life of a project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The acquisition and management of knowledge is the dominant source of organisational com-petitive advantage. As innovation processes in the management and procurement of construc-tion activities are becoming increasingly interactive, knowledge management (KM) has been widely recognised by construction organisations as an essential tool to be employed when dealing with growing complexity and cost of projects as well as increasing client demands. KM requires deliberate efforts by an organisation to maximise its performance through the acquisition, dissemination and leveraging of the organisation’s intellectual assets. The Hong Kong (HK) construction market has been described as one of the most open and globally competitive. This paper reports on KM practices within the HK construction industry, and through the analysis of a self-administered questionnaire survey, reveals managers’ opinions of the formal and informal KM practices that could be used to manage the flow of knowledge, and identifies the level of implementation within their organisations. The differences between managers’ perception and the actual state of implementation – as reported by the same man-agers – are statistically examined. The analysis leads to better understanding of how HK con-struction professionals currently manage organisational knowledge, and what areas for poten-tial improvement exist.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Knowledge is a commodity. It is a by-product of learning that involves the creation, sharing, processing and possible use of information in the mind of an individual. Knowledge management (KM) is, therefore, concerned with the effective implementation of such activities within the organisation. It is simply the process of leveraging organisational knowledge to deliver a long-term competitive advantage. This paper presents the results of an empirical research investigation into the interaction between different KM activities within the context of construction contracting organisations. The different KM activities include: responsiveness to the knowledge of business environment, knowledge acquisition, knowledge dissemination, and knowledge application. A questionnaire survey was administered to investigate the opinions of construction professionals regarding the intensity of activities currently implemented by their organisations to facilitate knowledge capturing, sharing and application. A total of 149 responses were then used to statistically examine the inter-relationships between the different KM activities as practised by contracting organisations in Hong Kong. The paper presents and discusses the survey findings and proposes recommendations for improving the effectiveness of current KM practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

China’s national construction industry is now preparing to face the challenges, and to seize the opportunities, resulting from China’s entry to the World Trade Organisation (WTO). With the foreign direct investment (FDI) hitting a record high of around US$52.7 billion in 2002, China is believed to have now surpassed the USA as the world’s favorite destination for foreign investment. This fact, coupled with the huge potential for infrastructure development, indicates that the relatively large proportion of FDI flowing into the national construction industry will continue to increase in the foreseeable future. Positive aspects of FDI flowing will definitely help forging new industrial capabilities for China’s construction industry, thus helping it to achieve the ambitious strategic targets set by the Government for exporting construction goods and services. To shed some light on the position of the national industry in the global economy, this paper briefly presents the current international standing of China’s construction industry and qualitatively appraises potential positive influences of, and challenges associated with, FDI on the national industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: Anecdotal evidence from the infrastructure and building sectors highlights issues of alcohol and other drugs (AODs) and its association with safety risk on construction sites. Currently, there is no clear evidence on the prevalence and risk of AOD use among Australian construction workers and there is limited evidential guidance regarding how to effectively address such an issue. Aims: The current research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. A nationally consistent and collaborative approach across the workforce will be adopted. Methods: A national assessment of the use of AODs was conducted in participating organisations across three states. The World Health Organisation’s Alcohol Use Disorders Identification Test (AUDIT) was used to measure alcohol use. Illicit drug use, ‘readiness to change’, impediments to reducing impairment, feasibility of proposed interventions, and employee attitudes and knowledge regarding AOD was also measured through a combination of survey items and interviews. Through an educative approach and consultation with employers, employees, union groups and leaders in applied AOD research, this assessment was used to inform and support cultural change management of AOD use in the industry. Results: Results (n=494) indicate that as in the general population, a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off cumulative score for risky or hazardous alcohol use. Other drug use was also identified as a major issue. Interview responses and input from all project partners is presented within a guiding principle framework for cultural change. Conclusions: Results support the need for evidence-based, comprehensive and tailored responses in the workplace. This paper will discuss the final results in the context of facilitating cultural change in the construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Over a seven-year period, Mark Radvan directed a suite of children’s theatre productions adapted from the original Tashi stories by Australian writers Anna and Barbara Fienberg. The Tashi Project’s repertoire of plays performed to over 40,000 children aged between 3 and 10 years old, and their carers, in seasons at the Out of the Box Festival, at Brisbane Powerhouse and in venues across Australia in two interstate tours in 2009 and 2010. The project investigated how best to combine an exploration of theatrical forms and conventions, with a performance style evolved in a specially developed training program and a deliberate positioning of young children as audiences capable of sophisticated readings of action, symbol, theme and character. The results of this project show that when brought into appropriate relationship with the theatre artists, young children aged 3-5 can engage with sophisticated narrative forms, and with the right contextual framing they enjoy heightened dramatic and emotional tension, bringing to the event sustained and highly engaged concentration. Older children aged 6-10 also bring sustained and heightened engagement to the same stories, providing that other more sophisticated dramatic elements are woven into the construction of the performances, such as character, theme and style.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: In sub-tropical and tropical Queensland, a legacy of poor housing design,minimal building regulations with few compliance measures, an absence of post-construction performance evaluation and various social and market factors has led to a high and growing penetration of, and reliance on, air conditioners to provide thermal comfort for occupants. The pervasive reliance on air conditioners has arguably impacted on building forms, changed cultural expectations of comfort and social practices for achieving comfort, and may have resulted in a loss of skills in designing and constructing high performance building envelopes. Aim: The aim of this paper is to report on initial outcomes of a project that sought to determine how the predicted building thermal performance of twenty-five houses in subtropical and tropical Queensland compared with objective performance measures and comfort performance as perceived by occupants. The purpose of the project was to shed light on the role of various supply chain agents in the realisation of thermal performance outcomes. Methodology: The case study methodology embraced a socio-technical approach incorporating building science and sociology. Building simulation was used to model thermal performance under controlled comfort assumptions and adaptive comfort conditions. Actual indoor climate conditions were measured by temperature and relative humidity sensors placed throughout each house, whilst occupants’ expectations of thermal comfort and their self-reported behaviours were gathered through semi-structured interviews and periodic comfort surveys. Thermal imaging and air infiltration tests, along with building design documents, were analysed to evaluate the influence of various supply chain agents on the actual performance outcomes. Results: The results clearly show that in the housing supply chain – from designer to constructor to occupant – there is limited understanding from each agent of their role in contributing to, or inhibiting, occupants’ comfort.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The development of toll roads in Indonesia started around 1978. Initially, the management and development of toll roads sat directly under the Government of Indonesia (GoI) being undertaken through PT JasaMarga, a state owned enterprise specifically established to provide toll roads. Due to the slow growth and low capability of toll roads to fulfil infrastructure needs in the first ten years of operation (only 2.688kms/year), GoI changed its strategy in 1989 to one of using private sector participation for roads delivery through a Public Private Partnership (PPP) scheme. In this latter period, PT JasaMarga had two roles, both as regulator on behalf of the private sector as well as being the operator. However, from 1989 to 2004 the growth rate of toll roads actually decreased further to 2.300kms/year. Facing this challenge of low growth rate of toll roads, in 2004GoI changed the toll road management system and the role of regulator was returned to the Government through the establishment of the Toll Road Regulatory Agency (BPJT). GoI also amended the institutional framework to strengthen the toll road management system. Despite the introduction of this new institutional framework, the growth of toll roads still showed insignificant change. This problem in toll road development has generated an urgent need for research into this issue. The aim of the research is to understand the performance of the new institutional framework in enhancing PPP procured toll road development. The methodology of the research was to undertake a questionnaire survey distributed to private sector respondents involved in toll road development. The results of this study show that there are several problems inherent in the institutional framework, but the most significant problem comes from the uncertainty of the function of the strategic executive body in the land expropriation process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The QUT Outdoor Worker Sun Protection (OWSP) project undertook a comprehensive applied health promotion project to demonstrate the effectiveness of sun protection measures which influence high risk outdoor workers in Queensland to adopt sun safe behaviours. The three year project (2010-2013) was driven by two key concepts: 1) The hierarchy of control, which is used to address risks in the workplace, advocates for six control measures that need to be considered in order of priority (refer to Section 3.4.2); and 2) the Ottawa Charter which recommends five action means to achieve health promotion (refer to Section 2.1). The project framework was underpinned by a participatory action research approach that valued peoples’ input, took advantage of existing skills and resources, and stimulated innovation (refer to Section 4.2). Fourteen workplaces (small and large) with a majority outdoor workforce were recruited across regional Queensland (Darling Downs, Northwest, Mackay and Cairns) from four industries types: 1) building and construction, 2) rural and farming, 3) local government, and 4) public sector. A workplace champion was identified at each workplace and was supported (through resource provision, regular contact and site visits) over a 14 to 18 month intervention period to make sun safety a priority in their workplace. Employees and employers were independently assessed for pre- and postintervention sun protection behaviours. As part of the intervention, an individualised sun safety action plan was developed in conjunction with each workplace to guide changes across six key strategy areas including: 1) Policy (e.g., adopt sun safety practices during all company events); 2) Structural and environmental (e.g., shade on worksites; eliminate or minimise reflective surfaces); 3) Personal protective equipment (PPE) (e.g., trial different types of sunscreens, or wide-brimmed hats); 4) Education and awareness (e.g., include sun safety in inductions and toolbox talks; send reminder emails or text messages to workers);5) Role modelling (e.g., by managers, supervisors, workplace champions and mentors); and 6) Skin examinations (e.g., allow time off work for skin checks). The participatory action process revealed that there was no “one size fits all” approach to sun safety in the workplace; a comprehensive, tailored approach was fundamental. This included providing workplaces with information, resources, skills, know how, incentives and practical help. For example, workplaces engaged in farming complete differing seasonal tasks across the year and needed to prepare for optimal sun safety of their workers during less labour intensive times. In some construction workplaces, long pants were considered a trip hazard and could not be used as part of a PPE strategy. Culture change was difficult to achieve and workplace champions needed guidance on the steps to facilitate this (e.g., influencing leaders through peer support, mentoring and role modelling). With the assistance of the project team the majority of workplaces were able to successfully implement the sun safety strategies contained within their action plans, up skilling them in the evidence for sun safety, how to overcome barriers, how to negotiate with all relevant parties and assess success. The most important enablers to the implementation of a successful action plan were a pro-active workplace champion, strong employee engagement, supportive management, the use of highly visual educational resources, and external support (provided by the project team through regular contact either directly through phone calls or indirectly through emails and e-newsletters). Identified barriers included a lack of time, the multiple roles of workplace champions, (especially among smaller workplaces), competing issues leading to a lack of priority for sun safety, the culture of outdoor workers, and costs or budgeting constraints. The level of sun safety awareness, knowledge, and sun protective behaviours reported by the workers increased between pre-and post-intervention. Of the nine sun protective behaviours that were assessed, the largest changes reported included a 26% increase in workers who “usually or always” wore a broad-brimmed hat, a 20% increase in the use of natural shade, a 19% increase in workers wearing long-sleeved collared shirts, and a 16% increase in workers wearing long trousers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Queensland, Australia has one of the highest rates of skin cancer in the world. Outdoor workers are regularly exposed to high doses of ultraviolet radiation, and are at increased risk to develop non-melanoma and melanoma skin cancers. In 2010, a health promotion intervention to improve sun protection among outdoor workers in Queensland commenced. The intervention employed a mixed methods approach and a participatory action research framework. Fourteen workplaces were recruited from building and construction, rural and farming, local government, and public sector organisations. Management and workers were engaged in cycles of assessment, reflection and discussion, planning, implementation and reassessing, over a 14-month intervention period. Overall, at least one workplace representative from each workplace (range 1-3) and in depth focus groups were held with a subset of workers (range 3-16) to assess sun safe behaviours pre and post intervention. Workers’ attitudes, beliefs, knowledge and willingness to engage in sun protection differed depending on workplace characteristics and support. A familiar theme among workers spoke of sun safety as being “common sense” and the “workers individual responsibility”. Often there was a discrepancy in the perceptions of the workers, compared to the view of workplace representatives and the workplaces position or policy on sun safety. In larger workplaces, especially Government Departments, workers were more aware and followed sun safe practices compared to smaller workplaces where sun safety was not a high priority. These results indicate that a workplace culture which places high values on safety and polices more broadly may also have a positive effect on sun safety among outdoor workers as well. In addition, the specific characteristics of the workplace and the outdoor work tasks influence workers willingness to engage in sun safety measures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A graph theoretic approach is developed for accurately computing haulage costs in earthwork projects. This is vital as haulage is a predominant factor in the real cost of earthworks. A variety of metrics can be used in our approach, but a fuel consumption proxy is recommended. This approach is novel as it considers the constantly changing terrain that results from cutting and filling activities and replaces inaccurate “static” calculations that have been used previously. The approach is also capable of efficiently correcting the violation of top down cutting and bottom up filling conditions that can be found in existing earthwork assignments and sequences. This approach assumes that the project site is partitioned into uniform blocks. A directed graph is then utilised to describe the terrain surface. This digraph is altered after each cut and fill, in order to reflect the true state of the terrain. A shortest path algorithm is successively applied to calculate the cost of each haul and these costs are summed to provide a total cost of haulage

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Lake Wivenhoe Integrated Wireless Sensor Network is conceptually similar to traditional SCADA monitoring and control approaches. However, it is applied in an open system using wireless devices to monitor processes that affect water quality at both a high spatial and temporal frequency. This monitoring assists scientists to better understand drivers of key processes that influence water quality and provide the operators with an early warning system if below standard water enters the reservoir. Both of these aspects improve the safety and efficient delivery of drinking water to the end users.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry has an obligation to respond to sustainability expectations of our society. Solutions that integrate innovative, intelligent and sustainability deliverables are vital for us to meet new and emerging challenges. Industrialised Building Systems (IBS), or known otherwise as prefabrication, employs a combination of ready-made components in the construction of buildings. They promote quality of production, enhance simplification of construction processes and minimise waste. The unique characteristics of this construction method respond well to sustainability. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications. The existing rating schemes fail to assess IBS against sustainability measures. To ensure the capture of full sustainability potential in buildings developed, the critical factors and action plans agreeable to all participants in the development processes need to be identified. Through questionnaire survey, eighteen critical factors relevant to IBS sustainability were identified and encapsulated into a conceptual framework to coordinate a systematic IBS decision making approach. Five categories were used to separate the critical factors into: ecological performance; economic value; social equity and culture; technical quality; and implementation and enforcement. This categorisation extends the "Triple Bottom Lines" to include social, economic, environmental and institutional dimensions. Semi-structured interviews help identify strategies of actions and solutions of potential problems through a SWOT analysis framework. These tools help the decision-makers maximise the opportunities by using available strengths, avoid weaknesses, and diagnose possible threats in the examined issues. The recommendations formed an integrated action plan to present information on what and how to improve sustainability through tackling each critical factor during IBS development. It can be used as part of the project briefing documents for IBS designers. For validation and finalisation the research deliverables, three case studies were conducted. The research fills a current gap by responding to IBS project scenarios in developing countries. It also provides a balanced view for designers to better understand sustainability potential and prioritize attentions to manage sustainability issues in IBS applications.