981 resultados para Bus Lane


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report presents the results of work zone field data analyzed on interstate highways in Missouri to determine the mean breakdown and queue-discharge flow rates as measures of capacity. Several days of traffic data collected at a work zone near Pacific, Missouri with a speed limit of 50 mph were analyzed in both the eastbound and westbound directions. As a result, a total of eleven breakdown events were identified using average speed profiles. The traffic flows prior to and after the onset of congestion were studied. Breakdown flow rates ranged between 1194 to 1404 vphpl, with an average of 1295 vphpl, and a mean queue discharge rate of 1072 vphpl was determined. Mean queue discharge, as used by the Highway Capacity Manual 2000 (HCM), in terms of pcphpl was found to be 1199, well below the HCM’s average capacity of 1600 pcphpl. This reduced capacity found at the site is attributable mainly to narrower lane width and higher percentage of heavy vehicles, around 25%, in the traffic stream. The difference found between mean breakdown flow (1295 vphpl) and queue-discharge flow (1072 vphpl) has been observed widely, and is due to reduced traffic flow once traffic breaks down and queues start to form. The Missouri DOT currently uses a spreadsheet for work zone planning applications that assumes the same values of breakdown and mean queue discharge flow rates. This study proposes that breakdown flow rates should be used to forecast the onset of congestion, whereas mean queue discharge flow rates should be used to estimate delays under congested conditions. Hence, it is recommended that the spreadsheet be refined accordingly.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Improving safety at nighttime work zones is important because of the extra visibility concerns. The deployment of sequential lights is an innovative method for improving driver recognition of lane closures and work zone tapers. Sequential lights are wireless warning lights that flash in a sequence to clearly delineate the taper at work zones. The effectiveness of sequential lights was investigated using controlled field studies. Traffic parameters were collected at the same field site with and without the deployment of sequential lights. Three surrogate performance measures were used to determine the impact of sequential lights on safety. These measures were the speeds of approaching vehicles, the number of late taper merges and the locations where vehicles merged into open lane from the closed lane. In addition, an economic analysis was conducted to monetize the benefits and costs of deploying sequential lights at nighttime work zones. The results of this study indicates that sequential warning lights had a net positive effect in reducing the speeds of approaching vehicles, enhancing driver compliance, and preventing passenger cars, trucks and vehicles at rural work zones from late taper merges. Statistically significant decreases of 2.21 mph mean speed and 1 mph 85% speed resulted with sequential lights. The shift in the cumulative speed distributions to the left (i.e. speed decrease) was also found to be statistically significant using the Mann-Whitney and Kolmogorov-Smirnov tests. But a statistically significant increase of 0.91 mph in the speed standard deviation also resulted with sequential lights. With sequential lights, the percentage of vehicles that merged earlier increased from 53.49% to 65.36%. A benefit-cost ratio of around 5 or 10 resulted from this analysis of Missouri nighttime work zones and historical crash data. The two different benefitcost ratios reflect two different ways of computing labor costs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

DESCRIPTION OF PROPOSED ACTION This Environmental Assessment (EA) has been prepared in compliance with the requirements of the National Environmental Policy Act of 1969 (NEPA). This EA informs the public and interested agencies of the proposed action and alternatives to the proposed action in order to gather feedback on the improvements under consideration. Proposed Action The Iowa Department of Transportation (Iowa DOT) and the Federal Highway Administration (FHWA) are evaluating potential alternatives to improve IA 122 in the City of Mason City. IA 122/Business US 18 is a primary east-west travel route through the City that transitions from a 4- lane undivided roadway, to 2-lane one-way pairs, then back to a 4-lane undivided roadway (Figure 1-1). The Iowa DOT proposes to flatten the tight reverse curves on the east end of the project. The one-way pairs will be narrowed by eliminating on-street parking along the corridor to more clearly define travel lanes. This will serve to calm traffic flows and reduce crashes along the highway. Additionally, improvements to intersections as well as consolidating or removing access points to improve traffic operations are proposed within the project corridor. A new access road for the Mason City Fire Department on the west end of the project will allow emergency trucks better access to travel south and east. Study Area The primary area of investigation for the Project is generally bounded by IA 122 through Mason City, known locally as 5th and 6th Street Southwest from South Monroe Avenue to South Carolina Avenue. US 65, known locally as Federal Avenue, bisects the study area. At this intersection of US 65 and Iowa 122, the 5th and 6th Street SW changes to 5th and 6th St SE. For the purposes of this discussion, this area will be referred to collectively as the IA 122 corridor. The Study Area boundaries were established to allow the development of a wide range of alternatives that could address the purpose and need for the project. The Study Area is larger than the area proposed for construction activities for the Project. However, some impacts may extend beyond the Study Area; where this occurs, it will be noted and addressed in the Environmental Analysis Section (Section 5). Figure 1-1 outlines the Study Area of the proposed action.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Research has found that both flood magnitude and frequency in the UK may have increased over the last five decades. However, evaluating whether or not this is a systematic trend is difficult because of the lack of longer records. Here we compile and consider an extreme flood record that extends back to 1770. Since 1770, there have been 137 recorded extreme floods. However, over this period, there is not a unidirectional trend of rising extreme flood risk over time. Instead, there are clear flood-rich and flood-poor periods. Three main flood-rich periods were identified: 18731904, 19231933, and 1994 onwards. To provide a first analysis of what is driving these periods, and given the paucity of more sophisticated datasets that extend back to the 18th century, objective Lamb weather types were used. Of the 27 objective Lamb weather types, only 11 could be associated with the extreme floods during the gauged period, and only 5 of these accounted for > 80% of recorded extreme floods The importance of these five weather types over a longer timescale for flood risk in Carlisle was assessed, through calculating the proportion of each hydrological year classified as being associated with these flood-generating weather types. Two periods clearly had more than the average proportions of the year classified as one of the flood causing weather types; 19001940 and 19832007; and these two periods both contained flood-rich hydrological records. Thus, the analysis suggests that systematic organisation of the North Atlantic climate system may be manifest as periods of elevated and reduced flood risk, an observation that has major implications for analyses that assume that climatic drivers of flood risk can be either statistically stationary or are following a simple trend. Copyright (c) 2011 Royal Meteorological Society

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This project consisted of slipforming a 4-inch thick econocrete subbase on a 6-mile section of US 63. The project location extends south from one mile south of Denver, Iowa to Black Hawk County Road C-66 and consisted of the reconstruction and new construction of a divided four-lane facility. The econocrete was placed 27.3 feet wide in a single pass. Fly ash was used in this field study to replace 30, 45 and 60 percent of the portland cement in three portland cement econocrete base paving mixes. The three mixes contained 300, 350 and 400 pounds of cementitious material per cubic yard. Two Class "C" ashes from Iowa approved sources were used. The ash was substituted on the basis of one pound of ash for each pound of cement removed. The work was done October 6-29, 1987 and May 25-June 9, 1988. The twelve subbase mixes were placed in sections 2500 to 3000 feet in length on both the north and southbound roadways. Compressive strengths of all mixes were determined at 3 and 28 days of age. Flexural strengths of all mixes were determined at 7 and 14 days. In all cases strengths were adequate. The freeze/thaw durability of the econocrete mixes used was reduced by increased fly ash levels but remained above acceptable limits. The test results demonstrate the feasibility of producing econocrete with satisfactory properties even using fly ash at substitution rates up to 45 percent.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is a story about a highway project near the small town of Wever, Iowa, and an American Indian village that existed at the location prior to the Europeans' arrival. The culture that lived in this village existed in a 10 state region of the Upper Midwest and may have been the ancestors of tribes living in the Midwest when European explorers entered the region. An archaeological recovery of information from the site was undertaken by the Iowa Department of Transportation because four-lane construction of U.S. 61 could not be accomplished without destroying most of the site. This site proved to be one of the richest archaeological finds in the State of Iowa. ǂc Iowa Department of Transportation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Left-turning traffic is a major source of conflicts at intersections. Though an average of only 10% to 15% of all approach traffic turns left, these vehicles are involved in approximately 45% of all accidents. This report presents the results of research conducted to develop models which estimate approach accident rates at high speed signalized intersections. The objective of the research was to quantify the relationship between traffic and intersection characteristics, and accident potential of different left turn treatments. Geometric, turning movement counts, and traffic signal phasing data were collected at 100 intersections in Iowa using a questionnaire sent to municipalities. Not all questionnaires resulted in complete data and ultimately complete data were derived for 63 intersections providing a database of 248 approaches. Accident data for the same approaches were obtained from the Iowa Department of Transportation Accident Location and Analysis System (ALAS). Regression models were developed for two different dependent variables: 1) the ratio of the number of left turn accidents per approach to million left turning vehicles per approach, and 2) the ratio of accidents per approach to million traffic movements per approach. A number of regression models were developed for both dependent variables. One model using each dependent variable was developed for intersections with low, medium, and high left turning traffic volumes. As expected, the research indicates that protected left turn phasing has a lower accident potential than protected/permitted or permitted phasing. Left turn lanes and multiple lane approaches are beneficial for reducing accident rates, while raised medians increase the likelihood of accidents. Signals that are part of a signal system tend to have lower accident rates than isolated signals. The resulting regression models may be used to determine the likely impact of various left turn treatments on intersection accident rates. When designing an intersection approach, a traffic engineer may use the models to estimate the accident rate reduction as a result of improved lane configurations and left turn treatments. The safety benefits may then be compared to any costs associated with operational effects to the intersection (i.e., increased delay) to determine the benefits and costs of making intersection safety improvements.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

BACKGROUND/AIM: With the evolving boundaries of sports science and greater understanding of the driving factors in the human performance physiology, one of the limiting factors has now become the technology. The growing scientific interest on the practical application of hypoxic training for intermittent activities such as team and racket sports legitimises the development of innovative technologies serving athletes in a sport-specific setting. METHODS: Description of a new mobile inflatable simulated hypoxic equipment. RESULTS: The system comprises two inflatable units-that is, a tunnel and a rectangular design, each with a 215 m(3) volume and a hypoxic trailer generating over 3000 Lpm of hypoxic air with FiO₂ between 0.21 and 0.10 (a simulated altitude up to 5100 m). The inflatable units offer a 45 m running lane (width=1.8 m and height=2.5 m) as well as a 8 m × 10 m dome tent. FiO₂ is stable within a range of 0.1% in normal conditions inside the tunnel. The air supplied is very dry-typically 10-15% relative humidity. CONCLUSIONS: This mobile inflatable simulated hypoxic equipment is a promising technological advance within sport sciences. It offers an opportunity for team-sport players to train under hypoxic conditions, both for repeating sprints (tunnel configuration) or small-side games (rectangular configuration).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The joint between two lanes of asphalt pavement is often the first area of a roadway which shows signs of deterioration and requires maintenance. As the final lift of hot asphalt is being placed in a construction project, it is being forced p against the adjoining lane of cold asphalt, forming the longitudinal joint. The mating of the two lanes, to form a high quality seal, is often not fully successful and later results in premature stripping or raveling as water enters the unsealed joint. The application of a hot poured rubberized asphaltic joint sealant along the joint face in the final stage of construction should help to form a watertight joint seal. A new product, especially formulated for the longitudinal joint in asphalt pavements was proposed to improve joint sealing. The following describes the experimental application of the new product, Crafco, PN 34524.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report is a supplement to one issued in late summer 1986 which covered construction on U.S. 71, in Buena Vista County Iowa. The work involved rehabilitation of an older 20 feet wide pavement by placing a four inch thick bonded concrete overlay monolithically with two feet of widening on each side. The work was performed on one lane at a time while construction traffic and limited public traffic used the adjacent traffic lane. When work on the first lane was complete traffic was moved onto it and rehabilitation was completed on the second lane. This report covers the condition of the rehabilitated roadway in May 1987 after the first winter. The condition is described by visual observations, core conditions, and various test results including core compressive strength, direct shear tests on cores for bond strength, profilometer results and delamtect test results.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Depth-averaged velocities and unit discharges within a 30 km reach of one of the world's largest rivers, the Rio Parana, Argentina, were simulated using three hydrodynamic models with different process representations: a reduced complexity (RC) model that neglects most of the physics governing fluid flow, a two-dimensional model based on the shallow water equations, and a three-dimensional model based on the Reynolds-averaged Navier-Stokes equations. Row characteristics simulated using all three models were compared with data obtained by acoustic Doppler current profiler surveys at four cross sections within the study reach. This analysis demonstrates that, surprisingly, the performance of the RC model is generally equal to, and in some instances better than, that of the physics based models in terms of the statistical agreement between simulated and measured flow properties. In addition, in contrast to previous applications of RC models, the present study demonstrates that the RC model can successfully predict measured flow velocities. The strong performance of the RC model reflects, in part, the simplicity of the depth-averaged mean flow patterns within the study reach and the dominant role of channel-scale topographic features in controlling the flow dynamics. Moreover, the very low water surface slopes that typify large sand-bed rivers enable flow depths to be estimated reliably in the RC model using a simple fixed-lid planar water surface approximation. This approach overcomes a major problem encountered in the application of RC models in environments characterised by shallow flows and steep bed gradients. The RC model is four orders of magnitude faster than the physics based models when performing steady-state hydrodynamic calculations. However, the iterative nature of the RC model calculations implies a reduction in computational efficiency relative to some other RC models. A further implication of this is that, if used to simulate channel morphodynamics, the present RC model may offer only a marginal advantage in terms of computational efficiency over approaches based on the shallow water equations. These observations illustrate the trade off between model realism and efficiency that is a key consideration in RC modelling. Moreover, this outcome highlights a need to rethink the use of RC morphodynamic models in fluvial geomorphology and to move away from existing grid-based approaches, such as the popular cellular automata (CA) models, that remain essentially reductionist in nature. In the case of the world's largest sand-bed rivers, this might be achieved by implementing the RC model outlined here as one element within a hierarchical modelling framework that would enable computationally efficient simulation of the morphodynamics of large rivers over millennial time scales. (C) 2012 Elsevier B.V. All rights reserved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

It is difficult to maintain reflectorized lane markings on high-traffic, multi-lane highways. This is particularly true of sections in urban areas where there are frequent lane changes, such as on the Des Moines Freeway, I-235. In spite of the fact that the lane markings are painted on an average of three times a year, they are frequently absent during a considerable portion of the winter period. In the summer of 1973, the office of Highway Maintenance suggested a research project using a new thermoplastic paint developed by the Prismo Universal Corporation. Because of difficulties in scheduling the work, a definite proposal was not submitted until 1974. Upon the recommendation of the Iowa Highway Research Board, the project was approved by the Iowa State Highway Commission on August 7, 1974.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this research project is to determine if (1) epoxy lane markings will last an entire winter season without replacement, (2) epoxy lane marking is an economical alternative to standard paint on high-traffic multi-lane roadways where lane changing is frequent, and (3) there are worthwhile benefits derived from thorough cleaning of the pavement surface before painting. The success of epoxy lane marking depends on the success of the equipment with which it is mixed and applied. The epoxy lane marking material, if properly mixed and placed on a clean surface, has the durability required to withstand a high traffic volume and frequent lane changes for at least one year.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The load ratings for these Standard bridges were calculated in compliance with the 1978 AASHTO Manual for Maintenance Inspection of Bridges, using the appropriate allowable stresses for the materials specified by the Standard plans. Distribution of loads is in compliance with the Manual unless otherwise noted. Except for truss spans, all bridges with roadway widths of 18 ft. or less were rated for one lane of traffic. All 18 ft. roadway truss bridges were rated for both one and two lanes of traffic. All bridges with roadway widths exceeding 18 ft. were rated for two lanes of traffic. If the posting rating for two lane bridges was less than legal, then the bridges were rated for traffic restricted to one lane, or to one lane centered in the roadway, as noted on the summary sheet. The ratings are applicable to bridges built in accordance with the standard plans and which exhibit no significant deterioration or damage to the structural members, and which have no added wearing surface material in excess of that noted on the summary sheets and used in the calculations. The inventory and operating ratings were based upon the standard AASHTO HS20-44 loading. The legal load ratings were based upon the three typical Iowa legal vehicles shown on page 5. The legal load ratings were based upon the maximum allowable Operating Rating stresses specified in the Manual. Refer to notations on the summary sheets for additional qualifications on the load ratings for specific standard bridge series. Load ratings for standard bridges with wood floors must be based upon existing conditions of attachment of the wood flooring to the top flanges of longitudinal steel stringers. The ratings must be reevaluated if the existing lateral support conditions are not in accordance with conditions used for the rating and noted on the summary sheets. Details of most of the standard bridges are included in the three books of "Iowa State Highway Commission, Bridge Standards," issued in June, 1972. Copies of plans for those standard bridges that were rated, and that are not included in the original books of standard plans, are being furnished under separate cover with these rating summaries.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In 1986, a 0.34 mile experimental section of polymerized asphalt cement (PAC30) concrete was placed in the westbound driving lane of Interstate 80 in western Iowa. It was used in a 2" asphalt concrete inlay using 20% recycled asphalt pavement. The virgin aggregate included 41% crushed gravel, 25% crushed quartzite and 14% natural sand. The evaluation of the project was severely limited when a 1987 reconstruction project extended into the experimental section leaving only 395 feet. Rut depths under a 4-foot gage were taken for a period of two years. No significant rutting occurred in the experimental polymerized section. The frequency of transverse cracking in the polymerized AC section was the same as that of the comparative AC-20 section. The asphalt paving mixture made with polymerized AC cost 120% of the cost of the conventional mix.