990 resultados para Situational Management
Resumo:
Regardless of the setting in which they work, nurses are responsible for the assessment and management of clients with pain. Pain is a key consideration in all patient care, and nurses play a critical role in pain management. Indeed, throughout history nurses have made important contributions to our understanding and management of pain through research and clinical practice. This chapter aims to provide an introduction to some key concepts in pain management and to encourage you to reflect on some of your own assumptions about pain.
Resumo:
Asset management (AM) processes play an important role in assisting enterprises to manage their assets more efficiently. To visualise and improve AM processes, the processes need to be modelled using certain process modelling methodologies. Understanding the requirements for AM process modelling is essential for selecting or developing effective AM process modelling methodologies. However, little research has been done on analysing the requirements. This paper attempts to fill this gap by investigating the features of AM processes. It is concluded that AM process modelling requires intuitive representation of its processes, ‘fast’ implementation of the process modelling, effective evaluation of the processes and sound system integration.
Resumo:
Cost implications related to the physical resources such as land and building in organisation is significant. Management entity of government or private sectors has often ignored the importance and the contribution gained from the physical resources towards their organisation. This source is a precious asset that can generate income if properly managed. This paper aims to explore the current trends in space management internationally, both from the government and private sector perspectives. A case study is conducted to study the level of effectiveness of space management in one of the government institutions in Malaysia. The findings from the case study will be compared with the current international trend of space management. The study will enrich the current understanding of space management in government properties, as well as to compare the level of space management effectiveness of government properties in Malaysia with the international trends and proposed suggestions to improve current practices of space management of Malaysian government’s properties. Keywords:
Resumo:
Empirical research in business process management(BPM) is coming of age. In 2009, when the inaugural ER-BPM workshop was held, the field of BPM research was characterized by a strong emphasis on solution development, but also by an increasing demand for insights or evaluations of BPM technology based on dedicated empirical research strategies. The ER-BPM workshop series was created to provide an international forum for researchers to discuss and present such research.
Resumo:
The purpose of this paper is to review the incidence of upper-body morbidity (arm and breast symptoms, impairments, and lymphedema), methods for diagnosis, and prevention and treatment strategies. It was also the purpose to highlight the evidence base for integration of prospective surveillance for upper-body morbidity within standard clinical care of women with breast cancer. Between 10% and 64% of women report upper-body symptoms between 6 months and 3 years after breast cancer, and approximately 20% develop lymphedema. Symptoms remain common into longer-term survivorship, and although lymphedema may be transient for some, those who present with mild lymphedema are at increased risk of developing moderate to severe lymphedema. The etiology of morbidity seems to be multifactorial, with the most consistent risk factors being those associated with extent of treatment. However, known risk factors cannot reliably distinguish between those who will and will not develop upper-body morbidity. Upper-body morbidity may be treatable with physical therapy. There is also evidence in support of integrating regular surveillance for upper-body morbidity into the routine care provided to women with breast cancer, with early diagnosis potentially contributing to more effective management and prevention of progression of these conditions.
Resumo:
Most commonly, residents are always arguing about the satisfaction of sustainability and quality of their high rise residential property. Often, all the shortcomings and weaknesses will be blamed on the developers without considering the lack of knowledge management from the residents themselves. It is important, therefore, to show that knowledge management of the residents should be taken into account in relation to the satisfactory and the quality of the high rise residential property. This paper aims to discuss the resident’s knowledge management level of the high rise residential property in showing that resident’s knowledge management is really important to maintain the property at least. To evaluate this situation, the questionnaire surveys are being conducted. The paper analyses and structures the social science research on the importance of knowledge as a resource. The survey evidence demonstrates that, the resident’s knowledge management level was highly related in having high quality and sustainable high rise residential property in Johor Bahru.
Resumo:
Wound research is a complex multidimensional activity most effectively conducted by inter-disciplinary teams that connect studies in basic wound biology, devices and biomaterials with clinical practice. These complexities have been recognised in a new initiative through the establishment of an inter-disciplinary wound research centre in Australia; the Wound Management Innovation Cooperative Research Centre (WMI CRC). The centre is funded by the Australian Government's Cooperative Research Centre Program and a consortium of 22 participants and has a resource of US$108 million over 8 years...
Resumo:
The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks simultaneously. However, this model considers those failure risks that occur only over the design and construction phases of a project’s life cycle. While it can be sufficient for some projects for which the required cost during the operating life is much less than the budget required over the construction period, it should be modified in relation to infrastructure projects because the associated costs during the operating life cycle are significant. In this paper, a modified APRAM is proposed, which can consider potential risks that might occur over the entire life cycle of the project, including technical and managerial failure risks. Therefore, the modified model can be used as an efficient decision-support tool for construction managers in the housing industry in which various alternatives might be technically available. The modified method is demonstrated by using a real building project, and this demonstration shows that it can be employed efficiently by construction managers. The Delphi method was applied in order to figure out the failure events and their associated probabilities. The results show that although the initial cost of a cold-formed steel structural system is higher than a conventional construction system, the former’s failure cost is much lower than the latter’s
Resumo:
All civil and private aircraft are required to comply with the airworthiness standards set by their national airworthiness authority and throughout their operational life must be in a condition of safe operation. Aviation accident data shows that over twenty percent of all fatal accidents in aviation are due to airworthiness issues, specifically aircraft mechanical failures. Ultimately it is the responsibility of each registered operator to ensure that their aircraft remain in a condition of safe operation, and this is done through both effective management of airworthiness activities and the effective program governance of safety outcomes. Typically, the projects within these airworthiness management programs are focused on acquiring, modifying and maintaining the aircraft as a capability supporting the business. Program governance provides the structure through which the goals and objectives of airworthiness programs are set along with the means of attaining them. Whilst the principal causes of failures in many programs can be traced to inadequate program governance, many of the failures in large scale projects can have their root causes in the organisational culture and more specifically in the organisational processes related to decision-making. This paper examines the primary theme of project and program based enterprises, and introduces a model for measuring organisational culture in airworthiness management programs using measures drawn from 211 respondents in Australian airline programs. The paper describes the theoretical perspectives applied to modifying an original model to specifically focus it on measuring the organisational culture of programs for managing airworthiness; identifying the most important factors needed to explain the relationship between the measures collected, and providing a description of the nature of these factors. The paper concludes by identifying a model that best describes the organisational culture data collected from seven airworthiness management programs.
An intervention study to improve pain management by nurses : normative beliefs and perceived control
Resumo:
Based on a predictive model of nurses' intentions regarding pain management, an intervention was developed to improve nurses' pain management. The intervention involved a series of workshops with cohorts of nurses working in acute care wards to address the important antecedents to their intentions: normative beliefs and perceived control. Pre- and post-intervention measures demonstrate the effectiveness of the intervention. The effectiveness of this intervention in improving the management of patients' pain is compared with a patient education program group and a control group. The findings provide support for further developing interventions based on the theory of planned behavior.
Resumo:
Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.