904 resultados para National characteristics, Italian.
Resumo:
The rural two-lane highway in the southeastern United States is frequently associated with a disproportionate number of serious and fatal crashes and as such remains a focus of considerable safety research. The Georgia Department of Transportation spearheaded a regional fatal crash analysis to identify various safety performances of two-lane rural highways and to offer guidance for identifying suitable countermeasures with which to mitigate fatal crashes. The fatal crash data used in this study were compiled from Alabama, Georgia, Mississippi, and South Carolina. The database, developed for an earlier study, included 557 randomly selected fatal crashes from 1997 or 1998 or both (this varied by state). Each participating state identified the candidate crashes and performed physical or video site visits to construct crash databases with enhance site-specific information. Motivated by the hypothesis that single- and multiple-vehicle crashes arise from fundamentally different circumstances, the research team applied binary logit models to predict the probability that a fatal crash is a single-vehicle run-off-road fatal crash given roadway design characteristics, roadside environment features, and traffic conditions proximal to the crash site. A wide variety of factors appears to influence or be associated with single-vehicle fatal crashes. In a model transferability assessment, the authors determined that lane width, horizontal curvature, and ambient lighting are the only three significant variables that are consistent for single-vehicle run-off-road crashes for all study locations.
Resumo:
Process models in organizational collections are typically modeled by the same team and using the same conventions. As such, these models share many characteristic features like size range, type and frequency of errors. In most cases merely small samples of these collections are available due to e.g. the sensitive information they contain. Because of their sizes, these samples may not provide an accurate representation of the characteristics of the originating collection. This paper deals with the problem of constructing collections of process models, in the form of Petri nets, from small samples of a collection for accurate estimations of the characteristics of this collection. Given a small sample of process models drawn from a real-life collection, we mine a set of generation parameters that we use to generate arbitrary-large collections that feature the same characteristics of the original collection. In this way we can estimate the characteristics of the original collection on the generated collections.We extensively evaluate the quality of our technique on various sample datasets drawn from both research and industry.
Resumo:
It is possible for the visual attention characteristics of a person to be exploited as a biometric for authentication or identification of individual viewers. The visual attention characteristics of a person can be easily monitored by tracking the gaze of a viewer during the presentation of a known or unknown visual scene. The positions and sequences of gaze locations during viewing may be determined by overt (conscious) or covert (sub-conscious) viewing behaviour. This paper presents a method to authenticate individuals using their covert viewing behaviour, thus yielding a unique behavioural biometric. A method to quantify the spatial and temporal patterns established by the viewer for their covert behaviour is proposed utilsing a principal component analysis technique called `eigenGaze'. Experimental results suggest that it is possible to capture the unique visual attention characteristics of a person to provide a simple behavioural biometric.
Resumo:
The common approach to estimate bus dwell time at a BRT station is to apply the traditional dwell time methodology derived for suburban bus stops. In spite of being sensitive to boarding and alighting passenger numbers and to some extent towards fare collection media, these traditional dwell time models do not account for the platform crowding. Moreover, they fall short in accounting for the effects of passenger/s walking along a relatively longer BRT platform. Using the experience from Brisbane busway (BRT) stations, a new variable, Bus Lost Time (LT), is introduced in traditional dwell time model. The bus lost time variable captures the impact of passenger walking and platform crowding on bus dwell time. These are two characteristics which differentiate a BRT station from a bus stop. This paper reports the development of a methodology to estimate bus lost time experienced by buses at a BRT platform. Results were compared with the Transit Capacity and Quality of Servce Manual (TCQSM) approach of dwell time and station capacity estimation. When the bus lost time was used in dwell time calculations it was found that the BRT station platform capacity reduced by 10.1%.
Resumo:
It’s a pleasure for me to be penning my first President’s Message for the AITPM Newsletter. I am eagerly looking forward to serving the Institute and members over the coming couple of years. First though, I’d like to congratulate Andrew Hulse for steering the good ship AITPM over the past two years, bringing so many initiatives to the fore, including the Certified Transport Planner (CTP), stronger ties with other organisations and agencies such as IPENZ and Austroads, mutually beneficial sponsorship arrangements, and sharing his enthusiasm towards the Thunderbirds. Personally and largely thanks to my kids’ domination of the TV I’m a bit keener on the other great British sixties sci-fi classic, Doctor Who. Maybe we can generate a “favourite Doctor” dialogue in the Newsletter.
Resumo:
As we’re moving toward the end of the year, it’s not hard to notice everyone starting to rush a bit more. So much so, that in some cases people can lose their cool when they’re out and about. Recently I viewed an episode of Jenny Brockie’s Insight program on SBS on the topic of “rage”. The program covered many areas of life, but it highlighted the issue of rage against taxi drivers in Melbourne and showed some archival footage of the recent taxi drivers’ protest on the issue, next to Flinders Street Station. Serendipitously, perhaps, I picked up Brisbane’s City News as I was eating lunch in town a few days later, and there was an article on Brisbane taxi stand supervisors, citing that some feared to go to work on Friday and Saturday nights as they were not infrequently assaulted by drunken revellers waiting in the long queues for their taxi ride home.
Resumo:
It’s fast approaching the end of the year and the festive season, and I have a few things on my mind. First, how I’ll fit in all of my holiday plans and projects within my period of leave, which always seems to pass oh so quickly! But more important are the two issues of global financial uncertainty and safe travel. Judging by what is in the media, it appears to be proving difficult for any self respecting financial industry specialist to define and grapple with the so-called current economic crisis, let alone those of us who have not been formally and extensively schooled in the sciences of finance and economics. Perhaps the latter is even more of a “black art” than the discipline of transport planning. The situation has affected all of us with our superannuation and/or share portfolios; however, judging by the still-crowded shopping centres in many areas, the downstream general economic impacts appear to be less serious in Australia than in other developed countries, even with the significant market fluctuations taking place. There are many important decisions facing Australian governments, from the top down, on how they manage their budgets and spending. Infrastructure spending is in competition with other necessities such as the public health system and education. But it appears that infrastructure is an avenue of public spending that, over all time windows, may be able to significantly bolster local economies and that of the nation as a whole. This, however, is against the spectre of deficits. I would suggest that now, more than ever, we as transport and other professionals within the system, should use our knowledge and experience to take a key role in helping government and the private sector make sound decisions on infrastructure planning, delivery and management.
Resumo:
A belated Happy New Year fellow AITPM members! I trust that you have had a chance to take a break from your routine, and take time out to enjoy company with family and friends, as well as our wonderful surrounds.
Resumo:
As a tertiary educator, business is now starting to heat up for my colleagues and me as Semester 1 commences. I’d like to take this opportunity to wish all readers who are students or academic staff, whether sessional or full-time, a successful year of teaching to, and learning more about, the transport profession. I’d also like to note the important role played by our AITPM National Council Education Coordinator, being fulfilled by Victoria Branch President Mr Tony Fitts, along with all of our branches’ Education Coordinators.
Resumo:
Well, it has been Clem 7 month here in Brisbane and my impression is “so far, so good!” For those of you who know Brisbane, the four lane twin Clem Jones Tunnel (M7) is approximately 4.5km long, and connects Ipswich Road (A7) at the Princess Alexandra Hospital on the south side with Bowen Bridge Road (A3) at the Royal Brisbane Hospital on the north side. There are also south access ramps to the Pacific Motorway and east access ramps to Shafston Avenue (headed to/from Wynnum). Brisbanites have been enjoying a three week no-toll taste test, and I paced through it one evening with minimal fuss. The tunnel seems to have eased the congestion at the Stanley Street on-ramp to the Pacific Motorway quite a bit, and Ipswich Road – Main Street through the ‘Gabba. One must watch the signage carefully, but once we get used to the infrastructure, this will not likely be problematic. It will be interesting to see how traffic behaves when the system settles after tolling, which has likely commenced by the time you’re reading. I believe a passenger car toll is about $4.20 one way but saves about 24 signalised intersection pass-throughs.
Resumo:
We’ve had a bit of sticker shock in these parts. Well, apparently. Since my last missive, Brisbane’s Clem Jones Tunnel which was initially free now has a toll, at least partially, at the introductory rate of $2.95 for a one-way car ride between 5a.m. and midnight – free overnight. From 9 May 2010 the toll will be $4.28. Since the introductory toll was introduced, use of the tunnel appears to have declined somewhat – no surprise to transport professionals I suppose. An additional factor may have been that the “novelty value” of driving through the tunnel for free had worn off. This demonstrates to me that much of the community may still see the use of road infrastructure as a rite of passage, with only some actually weighing up the true value of their travel time and vehicle wear and tear against their out of pocket (or onto credit card) cost. Thus, we’re in pioneering times and the role of transport economics in the overall transport infrastructure planning realm is of considerable importance – especially as much of the new big ticket infrastructure is likely to be tolled into the future. The Queensland Premier, Anna Bligh, made poignant commentary about Brisbane City Council’s tunnel use in that such infrastructure is built for future times and not just as a quick fix for current traffic problems. My expectation is that once Airport Link, which is really the northern half of the corridor, opens in 2012, there will be a significant spike in Clem7 usage.
Resumo:
This is my penultimate report as National President of the Australian Institute of Traffic Planning and Management, Inc. As an academic, I would like to take this opportunity to raise some issues and challenges I see in transport professional education in Australia. My general view is that the transport profession has until recently been less conspicuous to others as an identifiable discipline. This is both a blessing and somewhat of a curse. People mostly enter, or sometimes fall into, the transport profession having taken a degree in civil engineering, other engineering, urban and regional planning, economics, industrial psychology, business, followed by the less obvious disciplines. This order is probably about relative to the proportion of members’ background qualifications in our ranks too. However, once a graduate destined to become a transport professional has spent about five years or so out of the academic estuary, they tend to specialise in an area that cannot necessarily be easily correlated to the well known courses I have rattled off above. I can say from experience that it is not out of the question to see SIDRA models having been prepared by a transport professional who did not take traffic engineering as part of a civil engineering degree. So I see a couple of key challenges for the transport profession, which happens to be represented by a number of bodies, with our AITPM perhaps being the peak body, into the future,
Resumo:
I’d like to re-state AITPM’s mission, which is “Growing Traffic Skills and Knowledge to Deliver Sustainable Transport.” The aims of the Institute are to advance traffic planning and management; to increase the knowledge of its members by encouraging free discussion, exchange of ideas and research in this field; and to provide a central point of reference for practitioners.
Resumo:
This paper outlines how the project agreement operating on the Australian National Museum project in Canberra, Australia facilitated a responsible and responsive workplace environment for construction workers. A project alliancing approach was adopted and designed to encourage industrial relations innovation in the workplace. The trigger for this approach was the perceived success of the alliancing working arrangements between key project delivery teams and a desire to extend this arrangement to subcontractors, suppliers and the workforce. Changes in the Australian workplace relations environment and introduction of a national code of practice for the Australian construction industry provided impetus for reaching a new type of workplace agreement. The workplace culture and characteristics of relationships formed between workers and management on that site shaped the agreed terms and conditions of work. It also spurred the pursuit of innovative approaches to project delivery from a technology, management and workplace culture perspective.
Resumo:
Significant differences between project partnering and project alliancing occur in the selection process, management structure of the organisations undertaking the project and nature of risk and reward incentives. This paper helps clarify the nature of project alliancing and how alliance member organisations were selected for this case study. A core issue that differentiates between the two approaches is that in partnering, partners may reap rewards at the expense of other partners. In alliancing each alliance member places their profit margin and reward structure ÁÁat riskÂÂ. Thus in alliancing, the entire alliance entity either benefits together or not all. This fundamentally changes the motivation and dynamics of the relationship between alliance members.