884 resultados para Project Performance
Resumo:
Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.
Resumo:
This project aims to assess the extent of economic sustainability of working in international markets by Australian construction design-related firms. This investigation also identified barriers and success factors firms experience, which ultimately increases or reduces their exposure to financial risk. This study explored new research territory by developing a detailed understanding of the way three successful firms have maintained their longevity in various international markets. The firms are not considered to be large firms by international standards. The manner in which the firms achieve long term sustainability, deal with problems and barriers in international markets and develop successful strategies rely upon being adaptable to different markets and changes within markets. A model was developed based upon a critical analysis of the literature. An adaptive performance framework for sustainability was developed which had three key areas; internationalisation process, market knowledge and design management. The sustainable business model is underpinned by the management of non-economic factors, which include social, cultural and intellectual capital. The ultimate aim of any firm and the ultimate indicator of success is financial capital. Firms typically develop their own highly sophisticated financial measures themselves however have only an implicit understanding of other softer and less tangible factors that impact upon sustainability. Adaptive performance is the firm’s continual adaptivity of business practices to respond to and thereby achieve client satisfaction by a combination of self, market and project needs assessment.
Resumo:
This project aims to assess the extent of economic sustainability of working in international markets by Australian construction design-related firms. This investigation also identified barriers and success factors firms experience, which ultimately increases or reduces their exposure to financial risk. This study explored new research territory by developing a detailed understanding of the way three successful firms have maintained their longevity in various international markets. The firms are not considered to be large firms by international standards. The manner in which the firms achieve long term sustainability, deal with problems and barriers in international markets and develop successful strategies rely upon being adaptable to different markets and changes within markets. A model was developed based upon a critical analysis of the literature. An adaptive performance framework for sustainability was developed which had three key areas; internationalisation process, market knowledge and design management. The sustainable business model is underpinned by the management of non-economic factors, which include social, cultural and intellectual capital. The ultimate aim of any firm and the ultimate indicator of success is financial capital. Firms typically develop their own highly sophisticated financial measures themselves however have only an implicit understanding of other softer and less tangible factors that impact upon sustainability. Adaptive performance is the firm’s continual adaptivity of business practices to respond to and thereby achieve client satisfaction by a combination of self, market and project needs assessment.
Resumo:
This is an internal report of the BRITE Project’s activities for 2003. The goal of the Project is to improve the incidence and quality of innovation in the Australian building and construction industry. The primary aim of the year’s work was to complete six case studies of innovation in the Australian building and construction industry. A secondary aim was to prepare for the Project’s innovation survey to be conducted in 2004. The case study program was undertaken to demonstrate the benefits of innovation and show how businesses successfully implement their innovations. The innovation survey is intended to run every 2nd year over the life of the CRC in order to benchmark innovation performance as a tool for public sector policy development and business strategy development. Appendix A contains a list of papers produced by the BRITE Project in 2003. The remainder of this report focuses on the case study program, which was successfully completed during 2003, with six booklets being produced.
Resumo:
Trying to innovate or wanting to? Making a start is the most difficult step on any journey. Whether trying to innovate for the first time, or seeking improvements on current performance, organisations are confronted with a plethora of options. Innovate ― Now! makes action easier by presenting some of the key considerations for improving innovation performance. This guide has been based on the outcomes of a survey and case studies conducted between 2003 and 2005 in the Australian property and construction industry and therefore contains unique and up-to-date information, examples and suggestions tailored specifically to your industry needs.
Resumo:
Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course
Resumo:
Brisbane Water (BW), a commercialised business arm of Brisbane City Council (BCC) entered into an alliance with a number of organisations from the private sector in order to design, construct, commission and undertake upgrades to three existing wastewater treatment plants located at Sandgate, Oxley Creek, and Wacol in Brisbane. The alliance project is called the Brisbane Water Environmental Alliance (BWEA). This report details the efforts of a team of researchers from the School of Management at Queensland University of Technology to investigate this alliance. This is the second report on this project, and is called Stage 2 of the research. At the time that Stage 2 of the research project was conducted, the BWEA project was nearing completion with a further 8 months remaining before project completion. The aim of this report is to explore individuals’ perceptions of the effectiveness and functioning of the BWEA project in the latter stages of the project. The second aim of this report is to analyse the longitudinal findings of this research project by integrating the findings from Stage 1 and Stage 2 of the project. This long-term analysis of the functioning and effectiveness of the alliance is important because at the current time, researchers have little knowledge of the group developmental processes that occur in large-scale alliances over time. Stage 2 of this research project has a number of aims including assessing performance of the BWEA project from the point of view of a range of stakeholders including the alliance board and alliance management team, alliance staff, and key stakeholders from the client organisation (Brisbane Water). Data were collected using semi-structured interviews with 18 individuals including two board members, one external facilitator, and four staff members from the client organisation. Analysis involved coding the interview transcripts in terms of the major issues that were reported by interviewees.
Resumo:
This research aims to improve the economic and environmental sustainability of the construction & demolition waste and precast concrete supply chains through the development, trial and evaluation of an innovative public sector supply chain management strategy. The long-term goals are to improve competitive behaviour and market sector performance and improve business process efficiency and effectiveness of public sector program delivery by influencing policy development, changing organisational behaviour and implementation development to achieve more economic and environmental sustainable markets.
Resumo:
This research project aims to improve economic, social and environmental sustainability of the pre-cast concrete and construction and demolition waste supply chains through the development, trial and evaluation of an innovative supply chain management strategy. The long-term goals are to improve competitive behaviour and market sector performance and improve business process efficiency and effectiveness of public sector program delivery by influencing policy development, changing organisational behaviour and implementation development to achieve more economic, social and environmental sustainable markets.
Resumo:
Being the Best investigates the ways in which highly innovative contractors sustain their market leadership. The businesses consulted are quoted extensively, as a means of sharing their insights. This report is intended as a resource for contractors that want to improve their innovation outcomes and business performance.
Resumo:
Policy instruments of education, regulation, fines and inspection have all been utilised by Australian jurisdictions as they attempt to improve the poor performance of occupational health and safety (OH&S) in the construction industry. However, such policy frameworks have been largely uncoordinated across Australia, resulting in differing policy systems, with differing requirements and compliance systems. Such complexity, particularly for construction firms operating across jurisdictional borders, led to various attempts to improve the consistency of OH&S regulation across Australia, four of which will be reviewed in this report. 1. The first is the Occupational Health and Safety Act 1991 (Commonwealth) which enabled certain organisations to opt out of state based regulatory regimes. 2. The second is the development of national standards, codes of practice and guidance documents by the National Occupational Health and Safety Council (NOHSC). The intent was that the OHS requirements, principles and practices contained in these documents would be adopted by state and territory governments into their legislation and policy, thereby promoting regulatory consistency across Australia. 3. The third is the attachment of conditions to special purpose payments from the Commonwealth to the States, in the form of OH&S accreditation with the Office of the Federal Safety Commissioner. 4. The fourth is the development of national voluntary codes of OHS practice for the construction industry. It is interesting to note that the tempo of change has increased significantly since 2003, with the release of the findings of the Cole Royal Commission. This paper examines and evaluates each of these attempts to promote consistency across Australia. It concludes that while there is a high level of information sharing between jurisdictions, particularly from the NOSHC standards, a fragmented OH&S policy framework still remains in place across Australia. The utility of emergent industry initiatives such as voluntary codes and guidelines for safer construction practices to enhance consistency are discussed.
Resumo:
The purpose of this document is to introduce non-specialists to the discipline and practice of public policy, particularly in relation to the construction sector in Australia. In order to do this, a brief overview of Australia’s government structure, and some of the main approaches to public policy analysis are outlined. Reference to construction related examples are provided to ensure issues discussed are relevant and understandable to construction professionals. Government is a significant player in the construction industry, and has multiple roles: adjudicator, regulator, constructor, purchaser and client of construction projects. Moreover there are many spheres of government that are typically engaged in construction projects at multiple stages. The machinery of government can be difficult to understand, even for long term public servants. Demystifying the processes within government can help to improve communication and therefore performance in the industry. A better understanding of how policy-making and government policies affect the construction industry will enhance communication and assist construction professionals and academics to understand and work with government. Additionally the document will provide an opportunity to demonstrate the relevance of policy analysis to inquiries of construction policies and regulation.
Resumo:
Recent initiatives around the world have highlighted the potential for information and communications technology (ICT) to foster better service delivery for businesses. Likewise, ICT has also been applied to government services and is seen to result in improved service delivery, improved citizen participation in government, and enhanced cooperation across government departments and between government departments. The Council of Australian Governments (COAG) (2006) identified local government development assessment (DA) arrangements as a ‘hot spot’ needing specific attention, as the inconsistent policies and regulations between councils impeded regional economic activity. COAG (2006) specifically suggested that trials of various ICT mechanisms be initiated which may well be able to improve DA processes for local government. While the authors have explored various regulatory mechanisms to improve harmonisation elsewhere (Brown and Furneaux 2007), the possibility of ICT being able to enhance consistency across governments is a novel notion from a public policy perspective. Consequently, this paper will explore the utility of ICT initiatives to improve harmonisation of DA across local governments. This paper examines as a case study the recent attempt to streamline Development Assessment (DA) in local governments in South East Queensland. This initiative was funded by the Regulation Reduction Incentive Fund (RRIF), and championed by the South East Queensland (SEQ) Council of Mayors. The Regulation Reduction Incentive Fund (RRIF) program was created by the Australian government with the aim to provide incentives to local councils to reduce red tape for small and medium sized businesses. The funding for the program was facilitated through a competitive merit-based grants process targeted at Local Government Authorities. Grants were awarded to projects which targeted specific areas identified for reform (AusIndustry, 2007), in SEQ this focused around improving DA processes and creating transparency in environmental health policies, regulation and compliance. An important key factor to note with this case study is that it is unusual for an eGovernment initiative. Typically individual government departments undertake eGovernment projects in order to improve their internal performance. The RRIF case study examines the implementation of an eGovernment initiative across 21 autonomous local councils in South East Queensland. In order to move ahead, agreement needed to be reached between councils at the highest level. Having reviewed the concepts of eGovernment and eGovernance, the literature review is undertaken to identify the typical cost and benefits, barriers and enablers of ICT projects in government. The specific case of the RRIF project is then examined to determine if similar costs and benefits, barriers and enablers could be found in the RRIF project. The outcomes of the project, particularly in reducing red tape by increasing harmonisation between councils are explored.
Resumo:
Principal Topic The study of the origin and characteristics of venture ideas - or ''opportunities'' as they are often called - and their contextual fit are key research goals in entrepreneurship (Davidsson, 2004). We define venture idea as ''the core ideas of an entrepreneur about what to sell, how to sell, whom to sell and how an entrepreneur acquire or produce the product or service which he/she sells'' for the purpose of this study. When realized the venture idea becomes a ''business model''. Even though venture ideas are central to entrepreneurship yet its characteristics and their effect to the entrepreneurial process is mysterious. According to Schumpeter (1934) entrepreneurs could creatively destruct the existing market condition by introducing new product/service, new production methods, new markets, and new sources of supply and reorganization of industries. The introduction, development and use of new ideas are generally called as ''innovation'' (Damanpour & Wischnevsky, 2006) and ''newness'' is a property of innovation and is a relative term which means that the degree of unfamiliarity of venture idea either to a firm or to a market. However Schumpeter's (1934) discusses five different types of newness, indicating that type of newness is an important issue. More recently, Shane and Venkataraman (2000) called for research taking into consideration not only the variation of characteristics of individuals but also heterogeneity of venture ideas, Empirically, Samuelson (2001, 2004) investigated process differences between innovative venture ideas and imitative venture ideas. However, he used only a crude dichotomy regarding the venture idea newness. According to Davidsson, (2004) as entrepreneurs could introduce new economic activities ranging from pure imitation to being new to the entire world market, highlighting that newness is a matter of degree. Dahlqvist (2007) examined the venture idea newness and made and attempt at more refined assessment of the degree and type of newness of venture idea. Building on these predecessors our study refines the assessment of venture idea newness by measuring the degree of venture idea newness (new to the world, new to the market, substantially improved while not entirely new, and imitation) for four different types of newness (product/service, method of production, method of promotion, and customer/target market). We then related type and degree of newness to the pace of progress in nascent venturing process. We hypothesize that newness will slow down the business creation process. Shane & Venkataraman (2000) introduced entrepreneurship as the nexus of opportunities and individuals. In line with this some scholars has investigated the relationship between individuals and opportunities. For example Shane (2000) investigates the relatedness between individuals' prior knowledge and identification of opportunities. Shepherd & DeTinne (2005) identified that there is a positive relationship between potential financial reward and the identification of innovative venture ideas. Sarasvathy's 'Effectuation Theory'' assumes high degree of relatedness with founders' skills, knowledge and resources in the selection of venture ideas. However entrepreneurship literature is scant with analyses of how this relatedness affects to the progress of venturing process. Therefore, we assess the venture ideas' degree of relatedness to prior knowledge and resources, and relate these, too, to the pace of progress in nascent venturing process. We hypothesize that relatedness will increase the speed of business creation. Methodology For this study we will compare early findings from data collected through the Comprehensive Australian Study of Entrepreneurial Emergence (CAUSEE). CAUSEE is a longitudinal study whose primary objective is to uncover the factors that initiate, hinder and facilitate the process of emergence and development of new firms. Data were collected from a representative sample of some 30,000 households in Australia using random digit dialing (RDD) telephone survey interviews. Through the first round of data collection identified 600 entrepreneurs who are currently involved in the business start-up process. The unit of the analysis is the emerging venture, with the respondent acting as its spokesperson. The study methodology allows researchers to identify ventures in early stages of creation and to longitudinally follow their progression through data collection periods over time. Our measures of newness build on previous work by Dahlqvist (2007). Our adapted version was developed over two pre-tests with about 80 participants in each. The measures of relatedness were developed through the two rounds of pre-testing. The pace of progress in the venture creation process is assessed with the help of time-stamped gestation activities; a technique developed in the Panel Study of Entrepreneurial Dynamics (PSED). Results and Implications We hypothesized that venture idea newness slows down the venturing process whereas relatedness facilitates the venturing process. Results of 600 nascent entrepreneurs in Australia indicated that there is marginal support for the hypothesis that relatedness assists the gestation progress. Newness is significant but is the opposite sign to the hypothesized. The results give number of implications for researchers, business founders, consultants and policy makers in terms of better knowledge of the venture creation process.
Resumo:
Establishing a framework for measuring the performance of public sector programs is fraught with dangers. Many public sector organisations are satisfied with measuring activity in programs and fail to see the need for establishing a framework that will meet the needs of participants and measure outcomes as well as activities. This paper explores how a government department in Queensland went about establishing a performance management framework to measure the outcomes and activities in a program that was a public private partnership. Findings indicate that using an iterative consultative approach performance measure can be put in place that are meaningful and assist the participants to review the program.