991 resultados para Programs for improvement


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enhance the water quality in the state through a variety of impairment-based, locally-directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report synthesizes the safety corridor programs of 13 states that currently have some type of program: Alaska, California, Florida, Kentucky, Minnesota, New Jersey, New Mexico, New York, Ohio, Oregon, Pennsylvania, Virginia, and Washington. This synthesis can help Midwestern states implement their own safety corridor programs and select pilot corridors or enhance existing corridors. Survey and interview information about the states’ programs was gathered from members of each state department of transportation (DOT) and Federal Highway Administration (FHWA) division office. Topics discussed included definitions of a safety corridor; length and number of corridors in the program; criteria for selection of a corridor; measures of effectiveness of an implemented safety corridor; organizational structure of the program; funding and legislation issues; and engineering, education, enforcement, and emergency medical service strategies. Safety corridor programs with successful results were then examined in more detail, and field visits were made to Kansas, Oregon, Pennsylvania, and Washington for first-hand observations. With the survey and field visit information, several characteristics of successful safety corridor programs were identified, including multidisciplinary (3E and 4E) efforts; selection, evaluation, and decommissioning strategies; organization structure, champions, and funding; task forces and Corridor Safety Action Plans; road safety audits; and legislation and other safety issues. Based on the synthesis, the report makes recommendations for establishing and maintaining a successful safety corridor program.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Federal Highway Administration estimates that red light running causes more than 100,000 crashes and 1,000 fatalities annually and results in an estimated economic loss of over $14 billion per year in the United States. In Iowa alone, a statewide analysis of red light running crashes, using crash data from 2001 to 2006, indicates that an average of 1,682 red light running crashes occur at signalized intersections every year. As a result, red light running poses a significant safety issue for communities. Communities rarely have the resources to place additional law enforcement in the field to combat the problem and they are increasingly using automated red light running camera-enforcement systems at signalized intersections. In Iowa, three communities currently use camera enforcement since 2004. These communities include Davenport, Council Bluffs, and Clive. As communities across the United States attempt to address red light running, a number of communities have implemented red light running camera enforcement programs. This report examines the red light running programs in Iowa and summarizes results of analyses to evaluate the effectiveness of such cameras.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study examines the effectiveness of Iowa’s Driver Improvement Program (DIP), measured as the reduction in the number of driver convictions subsequent to the DIP. The analysis involved a random sample of 9,055 drivers who had been instructed to attend DIP and corresponding data on driver convictions, crashes, and driver education training history that were provided by the Iowa Motor Vehicle Division. The sample was divided into two groups based on DIP outcome: satisfactory or unsatisfactory completion. Two evaluation periods were considered: one year after the DIP date (probation period) and the period from the 13th to 18th month after the DIP date. The evaluation of Iowa’s DIP showed that there is evidence of effectiveness in terms of reducing driver convictions subsequent to attending the DIP. Among the 6,790 (75%) drivers who completed the course satisfactorily, 73% of drivers had no actions and 93% were not involved in a crash during the probation period. Statistical tests confirmed these numbers. However, the positive effect of satisfactory completion of DIP on survival time (that is, the time until the first conviction) was not statistically significant 13 months after the DIP date. Econometric model estimation results showed that, regardless of the DIP outcome, the likelihood of conviction occurrence and frequency of subsequent convictions depends on other factors, such as age, driver history, and DIP location, and interaction effects among these factors. Low-cost, early intervention measures are suggested to enhance the effectiveness of Iowa’s DIP. These measures can include advisory and warning letters (customized based on the driver’s age) sent within the first year after the DIP date and soon after the end of the probation period, as well as a closer examination of DIP instruction across the 17 community colleges that host the program. Given the large number of suspended drivers who continued to drive, consideration should also be given to measures to reduce driving while suspended offenses.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Dyslipidemia, a major component of the metabolic syndrome and an important cardiovascular risk factor, is one of the commonest comorbidity associated with morbid obesity. The aim of this paper is to show that RYGBP markedly improves dyslipidemia and that this improvement maintains over time. Patients and Methods: Prospectively updated databank for bariatric patients. Patients undergoing RYGBP have yearly blood tests during follow-up. The results for lipids at one to five years were compared with preoperative values. Results: The mean excess BMI loss after one and five years was 77,9 % and 72,3%respectively. After one year, there was a significant reduction of the mean total cholesterol, LDL-cholesterol, total cholesterol/HDL ratio and triglyceride values, which maintained up to five years, and an increase of the HDL fraction, which progressed until five years. The proportion of patients with abnormal values decreased from 24,3 to 6,2% for total cholesterol, from 45,1 to 11,7 %for HDL, from 53,3 to 21,9 for LDL, and from 40,5 to 10 % for triglycerides, with no significant change between three and five years, despite some weight regain. Conclusions: RYGBP rapidly improves all components of dyslipidemia, and thereby reduces the overall cardiovascular risk in operated patients.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Federal Highway Administration mandates that states collect traffic count information at specified intervals to meet the needs of the Highway Performance Monitoring System (HPMS). A manual land use change detection method was employed to determine the effects of land use change on traffic for Black Hawk County, Iowa, from 1994 to 2002. Results from land use change detection could enable redirecting traffic count activities and related data management resources to areas that are experiencing the greatest changes in land use and related traffic volume. Including a manual land use change detection process in the Iowa Department of Transportation’s traffic count program has the potential to improve efficiency by focusing monitoring activities in areas more likely to experience significant increase in traffic.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Center for Transportation Research and Education (CTRE) issued a report in July 2003, based on a sample study of the application of remote sensed image land use change detection to the methodology of traffic monitoring in Blackhawk County, Iowa. In summary, the results indicated a strong correlation and a statistically significant regression coefficient between the identification of built-up land use change areas from remote sensed data and corresponding changes in traffic patterns, expressed as vehicle miles traveled (VMT). Based on these results, the Iowa Department of Transportation (Iowa DOT) requested that CTRE expand the study area to five counties in the southwest quadrant of the state. These counties are scheduled for traffic counts in 2004, and the Iowa DOT desired the data to 1) evaluate the current methodology used to place the devices; 2) potentially influence the placement of traffic counting devices in areas of high built-up land use change; and 3) determine if opportunities exist to reduce the frequency and/or density of monitoring activity in lower trafficked rural areas of the state. This project is focused on the practical application of built-up land use change data for placement of traffic count data recording devices in five southwest Iowa counties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND: Pharmacists can play a decisive role in the management of ambulatory patients with depression who have poor adherence to antidepressant drugs. OBJECTIVE: To systematically evaluate the effectiveness of pharmacist care in improving adherence of depressed outpatients to antidepressants. METHODS: A systematic review and meta-analysis of randomized controlled trials (RCTs) was conducted. RCTs were identified through electronic databases (MEDLINE, Cochrane Central Register of Controlled Trials, Institute for Scientific Information Web of Knowledge, and Spanish National Research Council) from inception to April 2010, reference lists were checked, and experts were consulted. RCTs that evaluated the impact of pharmacist interventions on improving adherence to antidepressants in depressed patients in an outpatient setting (community pharmacy or pharmacy service) were included. Methodologic quality was assessed and methodologic details and outcomes were extracted in duplicate. RESULTS: Six RCTs were identified. A total of 887 patients with an established diagnosis of depression who were initiating or maintaining pharmacologic treatment with antidepressant drugs and who received pharmacist care (459 patients) or usual care (428 patients) were included in the review. The most commonly reported interventions were patient education and monitoring, monitoring and management of toxicity and adverse effects, adherence promotion, provision of written or visual information, and recommendation or implementation of changes or adjustments in medication. Overall, no statistical heterogeneity or publication bias was detected. The pooled odds ratio, using a random effects model, was 1.64 (95% CI 1.24 to 2.17). Subgroup analysis showed no statistically significant differences in results by type of pharmacist involved, adherence measure, diagnostic tool, or analysis strategy. CONCLUSIONS: These results suggest that pharmacist intervention is effective in the improvement of patient adherence to antidepressants. However, data are still limited and we would recommend more research in this area, specifically outside of the US.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Lake Hendricks is a 54 acre man-made lake that is encompassed by a 1,209 acre watershed. Lake Hendricks is currently on the 303(d) Impaired Waters List for algae and pH impairments due to an abundance of algae growth caused by nutrients being delivered to the lake via 11 separate tile lines draining adjoining cropland areas. In 2009, a Watershed Management Plan was developed in partnership with IDALS and the IDNR 319 programs and $256,500 was awarded to address the nutrient and sediment loading of the lake. Over the past three years a total of $251,000 were spent to implement one grade stabilization structure, two sediment basins, two bioreactors, 700 feet of streambank stabilization, 30.7 acres oftimber stand improvement, and 39.4 acres of Conservation Reserve Program (CRP). A proposed wetland structure and three sediment basins are scheduled to be constructed in the fall of 2011. Current water monitoring data is showing an average of 54% Nitrate (N) loading reductions as a result of the installed BMPs. The District feels further reductions are possible by addressing nutrient management issues in the cropland areas, stabilizing additional streambanks, and improving the surrounding woodland areas. The goal is to reduce N loading by an additional 20% and sediment loading by 50 tlac/yr. The resulting collaborative effort may lead to the future de-listing of Lake Hendricks from the 303(d) Impaired Waters List.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Two sections of the Yellow River have been named to the State of Iowa’s 303d list of impaired waters. The listing reflects streams with pollution problems linked to habitat alterations, in addition to those with potential disease causing bacteria, viruses and parasites. This fact, combined with local knowledge of water quality problems, shows the need for land treatment practices and habitat improvement measures. This project would target the Yellow River watershed, which totals approximately 49,800 acres. Areas that drain directly into the Yellow River mainstream will be targeted. Individually, these areas are too small to be considered sub-watersheds. This project will assess the drainage areas for active gullies and prioritize grade stabilization structures based upon severity and impact on the fishery. Funding would be utilized to target high priority grade stabilization structure sites and provide cost-share for those projects. A prerequisite for cost-share allocation is 75% of the land contributing to the drainage area must have some form of treatment in place. The Allamakee SWCD has received an EPA Region 7 Grant toward grade stabilization structures in the same area. Landowners have indicated that 75% cost-share is necessary to implement practices. To meet this request, the EPA funding would be used at a 15% cost-share rate if matched with 60% cost-share from WIRB funding. If matched with Federal EQIP funds, 25% of funds obtained from WIRB would be used. If other funds were depleted, WIRB funds would be utilized for the entire 75% cost-share.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An overall effort has been initiated to improve the quality of the Yellow River in Northeast Iowa by reducing the amount of sediment and bacteria entering the stream. Funding for this project will be utilized to improve stream quality to the level of fully supporting game fish such as brown, rainbow and brook trout, walleye, northern pike and smallmouth bass. The Yellow River has the potential to be one of the top trout streams, not only in Iowa, but in the entire Upper Midwest. This project will greatly enhance recreational activities such as fishing, canoeing and inner tubing and will greatly increase tourism dollars to the state. The project will specifically address two sources of impairment: stream bank erosion and coliform bacteria from both livestock and inadequate human septic systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Dickinson SWCD is applying for $486,800 over three years from the Watershed Improvement Fund to enhance water quality in Dickinson County through an impairment-based, locally directed watershed improvement project dealing specifically with storm water runoff. The LID Project will provide a cost share incentive and technical expertise to individual and business owners in specially targeted districts who are willing to implement low impact development techniques such as rain gardens, bioswales, pervious paving to reduce storm water runoff from their properties. Goals for the project include: 1) Defining and prioritizing urban watersheds in the Iowa Great Lakes region for implementation of Low Impact Development Practices; 2) Providing technical expertise in the form of a graduate assistant/project manager to design and oversee construction; 3) Continuing public education of such practices and their local existence through project kiosk, brochures, County Naturalist programs, local cable television shows, tours and other interactions of the Clean Water Alliance with its 50 partners in the area concerned about water quality; and 4) Completing 125 separate projects over a three year period.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Iowa Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The fifteen-member Board conducted seven meetings throughout the year in-person or via teleconference. Meetings were held January 23, February 27, April 17, June 18, July 24, September 25 and December 17. Attachment 1 lists the board members and their organization affiliation. The Board completed one Request For Applications (RFA) for the Watershed Improvement Fund. The RFA was announced November 6, 2014 and closed December 29, 2014. December 29, 2014 Closing Date Request For Applications: The Board received 16 applications in response to this RFA. These applications requested $2.8 million in Watershed Improvement Funds and leveraged an additional $9.1 million for a total of $11.9 million of watershed project activity proposed. After reviewing and ranking the applications individually from this RFA, the Board met and selected eight applications for funding. The eight applications were approved for $1,249,861 of Watershed Improvement Funds. Data on the eight selected projects in this RFA include the following: • These projects included portions of 12 counties. • The $1.2 million requested of Watershed Improvement Funds leveraged an additional $4.2 million for a total of $5.4 million in watershed improvements. • Approved projects ranged in funding from $41,980 to $250,000. Attachment 2 lists the approved projects’ name, applicant name, project length, county or counties where located, and funding amount for the RFA. Attachment 3 is a map showing the status of all projects funded since inception of the program. At the end of 2015 there are 111 completed projects and 39 active projects. In cooperation with the Treasurer of State, the WIRB submitted the 2015 year-end report for the Rebuild Iowa Infrastructure Fund to the Legislative Services Agency and the Department of Management. Attachment 4 contains the 2015 annual progress reports submitted from active projects or projects finished in 2015.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the annual appropriations report submitted on behalf of the Watershed Improvement Review Board (WIRB).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Each agency is invited and encouraged to send a representative to a quarterly Department of Administrative Services State Recruitment Coordinating Committee “Committee” meeting. This Committee conducts strategic planning sessions to identify top goals and initiatives for the next 2-3 years.