906 resultados para Management of change


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main aim of this study was to develop the project management framework model which would serve as the new model to follow for upcoming projects at the Lappeenranta cement plant. The other goal was to execute the SNCR (selective non catalytic reduction) project successfully so that the nitrogen oxides emissions are below the stated emission limit when the new emission limit comes into effect beginning in July, 2008. Nitrogen oxides, project management aspects, SNCR and the invested system are explained in the theory part. In the practical part of the study, the SNCR project in the Lappeenranta cement plant was executed and the findings were documented. In order to reach the aim of this study, a framework of project management was made. The framework is based on the executed SNCR project, previous projects in the cement plant and on the available literature relating to the subject matter. The developed project turned out to be successful.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Knowledge flow from the customers is an important resource for a company and therefore it should engage its customers in knowledge co-creation. Through providing a virtual customer environment (VCE) as knowledge creation and sharing platform a company can obtain this type of knowledge, which is important for strategic purposes. In the VCE the members of the virtual customer community (VCC) create and share knowledge individually and collectively in diverse roles, utilizing many interaction facilities. Creating a functional VCE is not either easy or quick task and a company needs to analyze various issues carefully. Providing such a VCE in which customers want to share their experiences and insights is however worth of considering, since it brings many benefits for the company. In this research the main benefit is stated as the supportative role of the VCE in the better management of the knowledge flow from the customers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study aims at enhancing understanding and deriving new constructs about the management of intellectual capital in the early phases of project marketing. The research methodology employed is deductive; conceptual reasoning is based on existing literature. The study's knowledge base is drawn from the bodies of literature dealing with project, relationship, and industrial marketing, as well as from the literature dealing with mechanical engineering, network approach, systems selling, R&D, project portfolio, strategic, financial, and knowledge management. As a result, three processes, 32 summaries and 19 conclusions give to the management of intellectual capital meaning in the context of project marketing. These conclusions and synthesis are proposed to improve the existing concepts and models in project marketing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study explores areas which need to be improved to develop the quality of patient education to support self-management of patients with mental illness in psychiatric hospitals. The study was conducted in five phases during the period 2000 – 2007. First, patients‘ (n = 313) satisfaction with patient education were investigated. Second, patients' (n = 51) experiences of patient education were explored. Third, a national survey was conducted to investigate realisation of patient education from the staff (n = 55) viewpoint. Fourth, outcomes of patient education were investigated by evaluating the impacts of different patient education methods on patients‘ (n = 311) attitudes towards medication, knowledge level and importance of information. Fifth, patients‘ (n = 16) perceptions of different patient education methods were explored. Patients reported poor satisfaction with patient education (Phase I), and they have considerable need to receive information during their hospital stay (Phase II). Described by staff, the content of patient education covered almost all informational areas investigated. However, discrepancies related to the realisation of patient education were found. (Phase III.) Evaluation of different patient education methods indicate that patients derived benefits from structured patient education with supportive methods (Phase IV) and patients also perceived that these methods supported their information receiving (Phase V). In order to improve the quality of patient education to support self-management of patients with mental illness patient education should be systematically and individually provided to all patients by using different educational methods. Realisation of this should be ensured by providing written instructions, improving nurses‘ knowledge and skills as well ensuring operating conditions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

For any international companies who wish to enter the Chinese market, quality is base on the fundamental. The companies are coming to realize the importance of quality gradually, thus companies have been put the quality problems on the agenda. The competitiveness of companies comes from quality. Quality is the key to success, and it can decide that the companies can be accepted or eliminated by the market. Due to the obvious benefits, the demand of the method of how to achieve high quality of product keeps growing. During achieving the high quality process, the main troubles come from the impact between Eastern and Western culture. Chinese culture which is different with Western one have lasted as long as five thousand years. Such a culture deeply rooted in the hearts of Chinese people, and effected generation after generation of Chinese people's working style and ways of thinking. This thesis determines how to find a good fit point between Eastern and Western culture. Doing right thing by the right way. The nature of improving quality is improving management level in fact. "How to manage, who should be managed", the thesis explains the basic and best option to achieve those. It describes three-dimension-style management to monitoring the working process. This kind of management style can inspect production process from horizontal and vertical direction. In this management way, it defines effective evaluation system to every subcontractor, and makes the companies to achieve the ultimate goal - satisfy quality. Because of the importance of human factor, the thesis determines the range of training of the inspector and welder due to the current situation of China. The results show that in order to reach reliable training effective evaluation, not only the quality of the human but also the ultimate goal of product quality.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Vanhemmat keskoslasten kivun lievittäjinä Tutkimuksen tarkoituksena oli kehittää uusi kivunlievitysmenetelmä, Vanhempien käsikapalo, keskoslasten kivunhoitoon vastasyntyneiden teho-osastolla. Vanhempien käsikapalon tehokkuutta verrattiin kahdessa satunnaistetussa kontrolloidussa crossover-tutkimusasetelmassa ei-lääkkeelliseen näyttöön perustuvaan hoitoon (P.O. glukoosiliuos), lääkkeelliseen menetelmään (I.V. oksikodoni) ja lumeeseen (P.O. vesi) tai kontrolli hoitoon kantapääpiston ja hengitysteiden imemisen aikana. Lisäksi mitattiin kivunhoidon lyhytaikaisia sivuvaikutuksia (hapetuksen- ja pulssinlasku) ja pidempiaikaisia vaikutuksia uneen. Tutkittujen lasten ikä oli 28 raskausviikkoa (n = 20) ja 28 1/7 (n = 20). Toimenpidekipua arvioitiin Premature Infant Pain Profile (PIPP) -kipumittarilla. Interventioiden jälkeen unen rakenne analysoitiin 13 tunnin polysomnografia-rekisteröinneistä. Viimeisessä vaiheessa haastateltiin äitejä (n = 23), jotka olivat käyttäneet vanhempien käsikapaloa 2–4 viikkoa vastasyntyneiden teho-osastolla, strukturoidulla the Clinical Interview for Parents of High-Risk Infants -haastattelulla, johon oli lisätty kysymyksiä lapsen kivunhoidosta. Kantapääpiston aikana PIPP–pisteet olivat merkitsevästi matalampia P.O. glukoosiliuoksella (ka 4,85 ± 1,73, p ≤ 0,001) ja vanhempien käsikapalolla (ka 5,20 ± 1,70, p = 0,004) verrattuna lumeeseen (ka 7,05 ± 2,16). Hengitysteiden imemisen yhteydessä PIPP–pisteet olivat matalampia P.O. glukoosiliuoksella (ka 11,05 ± 2,31, p = 0,014) ja vanhempien käsikapalolla (ka 11,25 ± 2,47, p = 0,034) verrattuna lumeeseen (ka 12,40 ± 2,06). Oksikodonin teho oli verrattavissa lumeeseen kummankin toimenpiteen aikana. P.O. glukoosiliuoksen (21,3 %) ja lumeen (12,5 %) annosteluun liittyi merkittävästi enemmän lyhytaikaisia sivuvaikutuksia verrattuna oksikodoniin (5 %) tai vanhempien käsikapaloon (5 %). Oksikodoni muutti keskoslasten unen rakennetta vähentämällä merkittävästi aktiivisen unen määrää verrattuna muihin hoitoihin. Vanhemmat suhtautuivat positiivisesti käsikapalon käyttöön. Äitien osallistuminen kivunhoitoon voitiin jaotella kolmeen eri tyylin, jotka selittyivät äidin kiintymyksen tunteilla ja lapsen tehohoitoon liittyvällä stressillä. Vanhempien käsikapalo on suositeltavampi lyhyen toimenpidekivun lievittäjä kuin P.O. glukoosiliuos tai I.V. oksikodoni, kun tehokkuus, turvallisuus ja perhe otetaan huomioon.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project management has evolved in recent decades. Project portfolio management, together with multi project management, is an emerging area in the project management field in practice, and correspondingly in academic research and forums. In multi project management, projects cannot be handled isolated from each other, as they often have interdependencies that have to be taken into account. If the interdependencies between projects are evaluated during the selection process, the success rate of the project portfolio is increased. Interdependencies can be human resources, technological, and/or market based. Despite of the fact that interdependency as a phenomenon has roots in the 1960s and is related to famous management theories, it has not been much studied, although in practice most companies use it to great extent. There exists some research on interdependency, but prior publications have not emphasized the phenomenon per se, because a practical orientation practitioner techniques prevails in the literature. This research applies the method triangulation, electronic surveys and multiple case study. The research concentrates on small to large companies in Estonia and Finland, mainly in construction, engineering, ICT, and machinery industries. The literature review reveals that interdependencies are deeply involved in R&D and innovation. Survey analysis shows that companies are aware of interdependency issues in general, but they i have lack of detailed knowledge to use it thoroughly. Empirical evidence also indicates that interdependency techniques influence the success rate and other efficiency aspects to different extents. There are a lot of similarities in interdependency related managerial issues in companies of varying sizes and countries in Northern Europe. Differences found in the study are for instance the fact that smaller companies face more difficulties in implementing and evaluating interdependency procedures. Country differences between Estonia and Finland stem from working solutions to manage interdependencies on a daily basis.historical and cultural reasons, such as the special features of a transition country compared to a mature country. An overview of the dominant problems, best practices, and commonly used techniques associated with interdependency is provided in the study. Empirical findings show that many interdependency techniques are not used in practice. A multiple case study was performed in the study to find out how interdependencies are managed in real life on a daily basis. The results show that interdependencies are mostly managed in an informal manner. A description of managing the interdependencies and implementation procedures is given. Interdependency procedures are hard to implement, especially in smaller companies. Companies have difficulties in implementing interdependency procedures and evaluating them. The study contains detailed results on how companies have implemented working solutions to manage interdependencies on a daily basis

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Management of plant-parasitic nematodes with the use of nematicides has not been recommended for small farmers that grow yam in the Northeastern region of Brazil, due to its high cost and residue toxicity. The use of plants with antagonistic effect to nematodes and green manure which improves soil chemical, physical and biological characteristics can be a viable and low cost alternative to control parasitic nematodes. This work aimed to evaluate the effect of crotalaria (Crotalaria juncea) and pigeon pea (Cajanus cajan) plants on the control of yam nematodes. Three experiments were carried out. The first was conducted under in vitro conditions to evaluate the nematostatic and nematicide effect of extracts from fresh and dry matter of the above ground parts of crotalaria, pigeon pea, and the combination of both. The second experiment was carried out under greenhouse conditions to evaluate the effect of soil amendment with crotalaria, pigeon pea, and the combination of both in the infectivity of Scutellonema bradys, using tomato plants as the host plant. The third experiment was conducted under field conditions to evaluate the effect of crotalaria, pigeon pea, and the combination of both, cultivated between yam planting rows and incorporated to soil surface, on yam nematodes. The aqueous extract obtained form fresh matter of crotalaria had a nematicide effect of 100% for S. bradys. Extracts from dry matter of both crotalaria and pigeon pea did not have any nematicide effect, but had a nematostatic effect. Incorporation of crotalaria to soil inhibited infectivity of S. bradys in tomato seedlings. These results showed that planting crotalaria alone or in combination with pigeon pea, between the yam planting rows, is an efficient method for controlling S. bradys and Rotylenchulus reniformis associated with yams. Crotalaria can be used for controlling these plant-parasitic nematodes in soil.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The structural change of society from product-based business to service- and further to need-based business has caused the fact that work for environmental issues has spread from conventional factories and environmentally harmful production to concern services and offices as well. Almost every company has an office, so a relatively small environmental burden caused by an individual office grows remarkable already at the state level and globally even more. Motivation to work for environmental issues in an individual office could be challenging even without the fact that wasted environmental impacts bound also wasted costs. Besides cost savings, a concretely greener image of a company has its value in the B2Cas well as in the B2B-field. Consumers and clients are more and more conscious of environmental issues and demand concrete actions instead of speeches, good thoughts and meaningless certifications. Internal work for environmental issues at a strategy level is not sufficient, so operational environmental management is needed for changing old practices. This research is about the effects of operative environmental management on the greening process of an office-based business. The research is outlined to concern the operative work in the office including field sales. Target was to concretely lower the environmental impacts of Lyreco Finland and to find cost savings directly by changing the operative practices in the office and also indirectly by affecting the level of environmental knowledge of the personnel. During the greening process, the aim was also to create concrete arguments for marketing as well. The circle of greening process, which was especially created for this diploma work, was used as a method. The circle divides a year to themes and sections separated by factors of environmental impacts. Separation is based on Brett Wills’ thoughts of seven green wastes (Wills, Brett. The Green Intensions. 2009) and follows it uneasily. The circle aimed at ensuring evolutionary growth of knowledge instead of being revolutionary in the changing process. Committing personnel to the process from its start by asking ideas from them and giving them clear directions was an important part of the research of operative management. Because of working from distance, communication with personnel was operated by frequent training days and weekly greening notes via emails and intranet. Also availability for communication was an important task because of the telecommuting. Research results of this work show that operative environmental management in an officebased business today is mostly management of change. When the strategic environmental friendliness is taken into a concrete level, the most important individual factor is motivating the operating personnel. Research shows that evolutionary change is found being an efficient way to make a change. Also understanding one´s own impact on the environmental burden and on the whole greening process clearly motivates the personnel. Results show that in the operative realization of the greening process, clear directions of new working practices, being as concrete as possible, and committing personnel to follow them make the process more effective. The operative environmental management and the cycle of the greening process decrease the environmental burden and save costs. The concrete results could be used as believable arguments in marketing and therefore exploited in communication with interest groups. Commitment of the management is also one of the key factors of success in the greening process. In this research, changes in the business field by a company trade took the focus of the management away from the greening process and made the process more inefficient by decreasing the amount of training days. The circle of greening process will be used as a tool in the future, as well, and therefore it will help observe environmental impacts of a company and increase sustainable development. Commitment of management to the evolutionary environmental work helps the operating personnel lower environmental impacts, decrease costs and build a concretely greener image.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis studies the use of heuristic algorithms in a number of combinatorial problems that occur in various resource constrained environments. Such problems occur, for example, in manufacturing, where a restricted number of resources (tools, machines, feeder slots) are needed to perform some operations. Many of these problems turn out to be computationally intractable, and heuristic algorithms are used to provide efficient, yet sub-optimal solutions. The main goal of the present study is to build upon existing methods to create new heuristics that provide improved solutions for some of these problems. All of these problems occur in practice, and one of the motivations of our study was the request for improvements from industrial sources. We approach three different resource constrained problems. The first is the tool switching and loading problem, and occurs especially in the assembly of printed circuit boards. This problem has to be solved when an efficient, yet small primary storage is used to access resources (tools) from a less efficient (but unlimited) secondary storage area. We study various forms of the problem and provide improved heuristics for its solution. Second, the nozzle assignment problem is concerned with selecting a suitable set of vacuum nozzles for the arms of a robotic assembly machine. It turns out that this is a specialized formulation of the MINMAX resource allocation formulation of the apportionment problem and it can be solved efficiently and optimally. We construct an exact algorithm specialized for the nozzle selection and provide a proof of its optimality. Third, the problem of feeder assignment and component tape construction occurs when electronic components are inserted and certain component types cause tape movement delays that can significantly impact the efficiency of printed circuit board assembly. Here, careful selection of component slots in the feeder improves the tape movement speed. We provide a formal proof that this problem is of the same complexity as the turnpike problem (a well studied geometric optimization problem), and provide a heuristic algorithm for this problem.