1000 resultados para Kulttuurikaupunki 2000-työryhmä
Resumo:
This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.
Resumo:
The ICEA Service Bureau, created in 1998 after nearly seven years of prior effort, has now existed for 2% years. Although assisted in starting up by a grant of $300,000 from the Iowa Highway Research Board, it now operates exclusively on the basis of dues paid by 98 member counties. Its three person staff operates out of an office in Des Moines, Iowa, where the 28E agency subleases space from the Iowa State Association of Counties. Services, provided via the Internet, include News & updates, Communications support, Files for download, On-line database driven applications, a reference center, and a business area. Future services are being identified by both formal and informal processes and the Bureau has established itself as a valued member of the county engineering world in Iowa.
Resumo:
BACKGROUND: Little is known about time trends, predictors, and consequences of changes made to antiretroviral therapy (ART) regimens early after patients initially start treatment. METHODS: We compared the incidence of, reasons for, and predictors of treatment change within 1 year after starting combination ART (cART), as well as virological and immunological outcomes at 1 year, among 1866 patients from the Swiss HIV Cohort Study who initiated cART during 2000--2001, 2002--2003, or 2004--2005. RESULTS: The durability of initial regimens did not improve over time (P = .15): 48.8% of 625 patients during 2000--2001, 43.8% of 607 during 2002--2003, and 44.3% of 634 during 2004--2005 changed cART within 1 year; reasons for change included intolerance (51.1% of all patients), patient wish (15.4%), physician decision (14.8%), and virological failure (7.1%). An increased probability of treatment change was associated with larger CD4+ cell counts, larger human immunodeficiency virus type 1 (HIV-1) RNA loads, and receipt of regimens that contained stavudine or indinavir/ritonavir, but a decreased probability was associated with receipt of regimens that contained tenofovir. Treatment discontinuation was associated with larger CD4+ cell counts, current use of injection drugs, and receipt of regimens that contained nevirapine. One-year outcomes improved between 2000--2001 and 2004--2005: 84.5% and 92.7% of patients, respectively, reached HIV-1 RNA loads of <50 copies/mL and achieved median increases in CD4+ cell counts of 157.5 and 197.5 cells/microL, respectively (P < .001 for all comparisons). CONCLUSIONS: Virological and immunological outcomes of initial treatments improved between 2000--2001 and 2004--2005, irrespective of uniformly high rates of early changes in treatment across the 3 study intervals.
Resumo:
Newsletter for those who reside on acreages in Iowa. Produced by the Iowa State University Extension Office.
Resumo:
Newsletter for those who reside on acreages in Iowa. Produced by the Iowa State University Extension Office.
Resumo:
Newsletter for those who reside on acreages in Iowa. Produced by the Iowa State University Extension Office.
Resumo:
Newsletter for those who reside on acreages in Iowa. Produced by the Iowa State University Extension Office.
Resumo:
Newsletter for those who reside on acreages in Iowa. Produced by the Iowa State University Extension Office.
Resumo:
The joint between two lanes of asphalt pavement is often the first area of a roadway which shows signs of deterioration and requires maintenance. As the final lift of hot asphalt is being placed in a construction project, it is being forced p against the adjoining lane of cold asphalt, forming the longitudinal joint. The mating of the two lanes, to form a high quality seal, is often not fully successful and later results in premature stripping or raveling as water enters the unsealed joint. The application of a hot poured rubberized asphaltic joint sealant along the joint face in the final stage of construction should help to form a watertight joint seal. A new product, especially formulated for the longitudinal joint in asphalt pavements was proposed to improve joint sealing. The following describes the experimental application of the new product, Crafco, PN 34524.