947 resultados para underground mines
Resumo:
The history of the settlement of the province is tied to patterns of exploration and min development. In Northern British Columbia the Cariboo goldfields provided the impetus for settlement of the region and the beginning for mining to extend into the watern and northern regions in a series of minor gold rushes. The northern half of the province has a geological diverse mineral base that supports a wide variety of mining, and a gradual improvement of exploration and mining methods due to scientific knowledge and technology provided opportunities for lode gold and base metal mines to be developed. The success of mining is based on world ore prices and competitive markets that impact the economic viability of developing a mine. Mining faces increasing pressures in the northern half of the province due to other resource values, such as tourism or protected areas, that claim and compete for a similar land base.
Resumo:
-
Resumo:
Cat’s claw creeper, Macfadyena unguis-cati (L.) Gentry (Bignoniaceae) is a major environmental weed of riparian areas, rainforest communities and remnant natural vegetation in coastal Queensland and New South Wales, Australia. In densely infested areas, it smothers standing vegetation, including large trees, and causes canopy collapse. Quantitative data on the ecology of this invasive vine are generally lacking. The present study examines the underground tuber traits of M. unguis-cati and explores their links with aboveground parameters at five infested sites spanning both riparian and inland vegetation. Tubers were abundant in terms of density (~1000 per m2), although small in size and low in level of interconnectivity. M. unguis-cati also exhibits multiple stems per plant. Of all traits screened, the link between stand (stem density) and tuber density was the most significant and yielded a promising bivariate relationship for the purposes of estimation, prediction and management of what lies beneath the soil surface of a given M. unguis-cati infestation site. The study also suggests that new recruitment is primarily from seeds, not from vegetative propagation as previously thought. The results highlight the need for future biological-control efforts to focus on introducing specialist seed- and pod-feeding insects to reduce seed-output.
Resumo:
This report presents the results of a random telephone survey of 500 adult residents of Mount Isa, conducted in early November 2007. The study was funded by Xstrata Mount Isa Mines. The primary aim of the survey was to collect data about community perceptions and experiences of air quality in Mount Isa and to compare these results with those of a similar survey conducted in 2000 (MacLennan, Lloyd & Hensley, 2000). Both surveys also included questions relating to other aspects of the Mount Isa environment (e.g. water quality, heat, amount of greenery) as well as questions aimed at ascertaining respondents’ general attitudes towards environmental protection.
Resumo:
There has been a boom in Australian horror movie production in recent years. Daybreakers (2010), Wolf Creek (2005), Rogue (2007), Undead (2003), Black Water (2008), and Storm Warning (2006) among others, have all experienced varying degrees of popularity, mainstream visibility, and cult success in worldwide horror markets. While Aussie horror’s renaissance is widely acknowledged in industry literature, there is limited research into the extent of the boom and the dynamics of production. Consequently, there are few explanations for why and how this surge has occurred. This paper argues that the recent growth in Australian horror films has been driven by intersecting international market forces, domestic financing factors, and technological change. In so doing, it identifies two distinct tiers of Australian horror film production: ‘mainstream’ and ‘underground’ production; though overlap between these two tiers results in ‘high-end indie’ films capable of cinema release. Each tier represents the high and low-ends of Australian horror film production, each with different financing, production, and distribution models.
Resumo:
This paper examines the feasibility of automation of dragline bucket excavators used to strip over-burden from open cut mines. In particular the automatic control of bucket carry angle and bucket trajectory are addressed. Open-loop dynamics of a 1:20 scale model dragline bucket are identified, through measurement of frequency response between carry angle and drag motor input voltage. A strategy for automatic control of carry angle is devised and implemented using bucket angle and rate feedback. System compensation and tuning are explained and closed loop frequency and time responses are measured.
Resumo:
This paper investigates a wireless sensor network deployment - monitoring water quality, e.g. salinity and the level of the underground water table - in a remote tropical area of northern Australia. Our goal is to collect real time water quality measurements together with the amount of water being pumped out in the area, and investigate the impacts of current irrigation practice on the environments, in particular underground water salination. This is a challenging task featuring wide geographic area coverage (mean transmission range between nodes is more than 800 meters), highly variable radio propagations, high end-to-end packet delivery rate requirements, and hostile deployment environments. We have designed, implemented and deployed a sensor network system, which has been collecting water quality and flow measurements, e.g., water flow rate and water flow ticks for over one month. The preliminary results show that sensor networks are a promising solution to deploying a sustainable irrigation system, e.g., maximizing the amount of water pumped out from an area with minimum impact on water quality.
Resumo:
Mining is the process of extracting mineral resources from the Earth for commercial value. It is an ancient human activity which can be traced back to Palaeolithic times (43 000 years ago), where for example the mineral hematite was mined to produce the red pigment ochre. The importance of many mined minerals is reflected in the names of the major milestones in human civilizations: the stone, copper, bronze, and iron ages. Much later coal provided the energy that was critical to the industrial revolution and still underpins modern society, creating 38% of world energy generation today. Ancient mines used human and later animal labor and broke rock using stone tools, heat, and water, and later iron tools. Today’s mines are heavily mechanized with large diesel and electrically powered vehicles, and rock is broken with explosives or rock cutting machines.
Resumo:
Robotics in mines, aerospace, underwater, everyday unstructured environments and sensor networks with communicating devices that collect data.
Resumo:
Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.