981 resultados para passive energy dissipation


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada à Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Doutor em Engenharia Civil

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Energy resource scheduling is becoming increasingly important, such as the use of more distributed generators and electric vehicles connected to the distribution network. This paper proposes a methodology to be used by Virtual Power Players (VPPs), regarding the energy resource scheduling in smart grids and considering day-ahead, hour-ahead and realtime time horizons. This method considers that energy resources are managed by a VPP which establishes contracts with their owners. The full AC power flow calculation included in the model takes into account network constraints. In this paper, distribution function errors are used to simulate variations between time horizons, and to measure the performance of the proposed methodology. A 33-bus distribution network with large number of distributed resources is used.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The development in power systems and the introduction of decentralized generation and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which considers not only the generation, but also the management of loads through demand response programs, energy storage units, EVs and other players in a liberalized electricity markets environment. This paper proposes a methodology to be used by Virtual Power Players (VPPs), concerning the energy resource scheduling in smart grids, considering day-ahead, hour-ahead and real-time scheduling. The case study considers a 33-bus distribution network with high penetration of distributed energy resources. The wind generation profile is based on a real Portuguese wind farm. Four scenarios are presented taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour-ahead and realtime scheduling.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gradually smart grids and smart meters are closer to the home consumers. Several countries has developed studies focused in the impacts arising from the introduction of these technologies and one of the main advantages are related to energy efficiency, observed through the awareness of the population on behalf of a more efficient consumption. These benefits are felt directly by consumers through the savings on electricity bills and also by the concessionaires through the minimization of losses in transmission and distribution, system stability, smaller loading during peak hours, among others. In this article two projects that demonstrate the potential energy savings through smart meters and smart grids are presented. The first performed in Korea, focusing on the installation of smart meters and the impact of use of user interfaces. The second performed in Portugal, focusing on the control of loads in a residence with distributed generation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An intensive use of dispersed energy resources is expected for future power systems, including distributed generation, especially based on renewable sources, and electric vehicles. The system operation methods and tool must be adapted to the increased complexity, especially the optimal resource scheduling problem. Therefore, the use of metaheuristics is required to obtain good solutions in a reasonable amount of time. This paper proposes two new heuristics, called naive electric vehicles charge and discharge allocation and generation tournament based on cost, developed to obtain an initial solution to be used in the energy resource scheduling methodology based on simulated annealing previously developed by the authors. The case study considers two scenarios with 1000 and 2000 electric vehicles connected in a distribution network. The proposed heuristics are compared with a deterministic approach and presenting a very small error concerning the objective function with a low execution time for the scenario with 2000 vehicles.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Energy resource scheduling is becoming increasingly important, as the use of distributed resources is intensified and of massive electric vehicle is envisaged. The present paper proposes a methodology for day-ahead energy resource scheduling for smart grids considering the intensive use of distributed generation and Vehicle-to-Grid (V2G). This method considers that the energy resources are managed by a Virtual Power Player (VPP) which established contracts with their owners. It takes into account these contracts, the users' requirements subjected to the VPP, and several discharge price steps. The full AC power flow calculation included in the model takes into account network constraints. The influence of the successive day requirements on the day-ahead optimal solution is discussed and considered in the proposed model. A case study with a 33-bus distribution network and V2G is used to illustrate the good performance of the proposed method.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The recent changes on power systems paradigm requires the active participation of small and medium players in energy management. With an electricity price fluctuation these players must manage the consumption. Lowering costs and ensuring adequate user comfort levels. Demand response can improve the power system management and bring benefits for the small and medium players. The work presented in this paper, which is developed aiming the smart grid context, can also be used in the current power system paradigm. The proposed system is the combination of several fields of research, namely multi-agent systems and artificial neural networks. This system is physically implemented in our laboratories and it is used daily by researchers. The physical implementation gives the system an improvement in the proof of concept, distancing itself from the conventional systems. This paper presents a case study illustrating the simulation of real-time pricing in a laboratory.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The operation of distribution networks has been facing changes with the implementation of smart grids and microgrids, and the increasing use of distributed generation. The specific case of distribution networks that accommodate residential buildings, small commerce, and distributed generation as the case of storage and PV generation lead to the concept of microgrids, in the cases that the network is able to operate in islanding mode. The microgrid operator in this context is able to manage the consumption and generation resources, also including demand response programs, obtaining profits from selling electricity to the main network. The present paper proposes a methodology for the energy resource scheduling considering power flow issues and the energy buying and selling from/to the main network in each bus of the microgrid. The case study uses a real distribution network with 25 bus, residential and commercial consumers, PV generation, and storage.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Enterprise and Work Innovation Studies,6,IET, pp.9-51

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Some of the properties sought in seismic design of buildings are also considered fundamental to guarantee structural robustness. Moreover, some key concepts are common to both seismic and robustness design. In fact, both analyses consider events with a very small probability of occurrence, and consequently, a significant level of damage is admissible. As very rare events,in both cases, the actions are extremely hard to quantify. The acceptance of limited damage requires a system based analysis of structures, rather than an element by element methodology, as employed for other load cases. As for robustness analysis, in seismic design the main objective is to guarantee that the structure survives an earthquake, without extensive damage. In the case of seismic design, this is achieved by guaranteeing the dissipation of energy through plastic hinges distributed in the structure. For this to be possible, some key properties must be assured, in particular ductility and redundancy. The same properties could be fundamental in robustness design, as a structure can only sustain significant damage if capable of distributing stresses to parts of the structure unaffected by the triggering event. Timber is often used for primary load‐bearing elements in single storey long‐span structures for public buildings and arenas, where severe consequences can be expected if one or more of the primary load bearing elements fail. The structural system used for these structures consists of main frames, secondary elements and bracing elements. The main frame, composed by columns and beams, can be seen as key elements in the system and should be designed with high safety against failure and under strict quality control. The main frames may sometimes be designed with moment resisting joints between columns and beams. Scenarios, where one or more of these key elements, fail should be considered at least for high consequence buildings. Two alternative strategies may be applied: isolation of collapsing sections and, provision of alternate load paths [1]. The first one is relatively straightforward to provide by deliberately designing the secondary structural system less strong and stiff. Alternatively, the secondary structural system and the bracing system can be design so that loss of capacity in the main frame does not lead to the collapse. A case study has been selected aiming to assess the consequences of these two different strategies, in particular, under seismic loads.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para a obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A eficiência energética tem um papel de importância crescente devido a questões ambientais e ao aumento dos custos energéticos. Recentemente foram tomadas medidas para regular o consumo e o fornecimento de energia reativa em Portugal, que tornaram mais rigorosas as condições de faturação. O custo crescente da energia e a implementação das smart grids apontam para um futuro de maior rigor sobre a utilização da energia reativa. Não será de estranhar que as regras de faturação sejam mais severas daqui a uns anos. O desenvolvimento tecnológico nas áreas da análise da energia e nas formas de controlo da compensação de energia reativa permitem resultados muito mais eficazes que aqueles apresentados pelos vulgares sistemas a contactores que constituem a maioria dos cenários. Apesar de terem um custo inicial superior, os sistemas de compensação do fator de potência com filtragem passiva de harmónicos, desde que projetados corretamente, trazem vantagens evidentes na sua exploração a longo prazo. Com este trabalho pretende-se promover a sensibilização para o uso de sistemas mais eficientes na compensação de energia reativa e para que estes sejam projetados mais à medida das necessidades de cada local. Também se demonstra a extrema importância da adequação destes sistemas à qualidade de energia do local, principalmente em termos de conteúdo harmónico. Desta forma, os sistemas serão mais flexíveis em termos de utilização e possibilitam a sua adaptação às necessidades mesmo que as regras de faturação de energia reativa se tornem mais rigorosas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Atualmente, o parque edificado é responsável pelo consumo de 40% da energia total consumida em toda a União Europeia. As previsões apontam para o crescimento do sector da construção civil, nomeadamente a construção de edifícios, o que permite perspetivar um aumento do consumo de energia nesta área. Medidas importantes, como o lançamento da Diretiva 2010/31/EU do Parlamento Europeu e do Conselho de 19 de Maio de 2010 relativa ao desempenho energético dos edifícios, abrem caminho para a diminuição das necessidades energéticas e emissões de gases de efeito de estufa. Nela são apontados objetivos para aumentar a eficiência energética do parque edificado, tendo como objetivo que a partir de 2020 todos os novos edifícios sejam energeticamente eficientes e de balanço energético quase zero, com principal destaque para a compensação usando produção energética própria proveniente de fontes renováveis. Este novo requisito, denominado nearly zero energy building, apresenta-se como um novo incentivo no caminho para a sustentabilidade energética. As técnicas e tecnologias usadas na conceção dos edifícios terão um impacto positivo na análise de ciclo de vida, nomeadamente na minimização do impacto ambiental e na racionalização do consumo energético. Desta forma, pretendeu-se analisar a aplicabilidade do conceito nearly zero energy building a um grande edifício de serviços e o seu impacto em termos de ciclo de vida a 50 anos. Partindo da análise de alguns estudos sobre o consumo energético e sobre edifícios de balanço energético quase nulo já construídos em Portugal, desenvolveu-se uma análise de ciclo de vida para o caso de um edifício de serviços, da qual resultou um conjunto de propostas de otimização da sua eficiência energética e de captação de energias renováveis. As medidas apresentadas foram avaliadas com o auxílio de diferentes aplicações como DIALux, IES VE e o PVsyst, com o objetivo de verificar o seu impacto através da comparação com estado inicial de consumo energético do edifício. Nas condições iniciais, o resultado da análise de ciclo de vida do edifício a 50 anos no que respeita ao consumo energético e respetivas emissões de CO2 na fase de operação foi de 6 MWh/m2 e 1,62 t/m2, respetivamente. Com aplicação de medidas propostas de otimização, o consumo e as respetivas emissões de CO2 foram reduzidas para 5,2 MWh/m2 e 1,37 t/m2 respetivamente. Embora se tenha conseguido reduzir ao consumo com as medidas propostas de otimização de energia, chegou-se à conclusão que o sistema fotovoltaico dimensionado para fornecer energia ao edifício não consegue satisfazer as necessidades energéticas do edifício no final dos 50 anos.