899 resultados para Newspaper layout and design.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose-- DB clients play a vital role in the delivery of DB system and the clients’ competences are critical to the success of DB projects. Most of DB clients, however, remain inexperienced with the DB system. This study, therefore, aims to identify the key competences that DB clients should possess to ensure the success of DB projects in the construction market of China. Design/Methodology/Approach -- Five semi-structured face-to-face interviews and two rounds Delphi questionnaire survey were conducted in the construction market of China to identify the key competences of DB clients. Rankings have been assigned to these key competences on the basis of their relative importance. Findings-- Six ranked key competences of DB clients have been identified, which are, namely, (1) the ability to clearly define project scope and objectives; (2) financial capacity for the projects; (3) capacity in contract management; (4) adequate staff or consulting team; (5) effective coordination with DB contractors and (6) experience with similar design-build projects. Calculation of Kendall’s Coefficient of Concordance (W) indicates a statistically significant consensus of panel experts on these top six key competences. Practical implications—Clients should clearly understand the competence requirements in DB projects and should assess their DB capability before going for the DB option. Originality/Value-- The examination of DB client’s key competences will help the client deepen the understanding of the DB system. DB clients can also make use of the research findings as guidelines to improve their DB competence.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Design-builders play a vital role in the success of DB projects. In the construction market of the People’s Republic of China, most of the design-builders, however, lack adequate competences to conduct the DB projects successfully. The objective of this study is, therefore, to identify the key competences that design-builders should possess to not only ensure the success of DB projects but also acquire the competitive advantages in the DB market. Five semi-structured face-to-face interviews and two rounds of Delphi questionnaire survey were conducted to identify the key competences of design-builders. Rankings have been assigned to these key competences on the basis of their relative importance. Six ranked key competences of design-builders have been identified, which are, namely, (1) experience with similar DB projects; (2) capability of corporate management; (3) combination of building techniques and design expertise; (4) financial capability for DB projects; (5) enterprise qualification and scale; and (6) credit records and reputation in the industry. The design-builders can make use of the research findings as guidelines to improve their DB competence. These research findings will also be useful to clients during the selection of design-builders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Design-build (DB) system has been demonstrated as an effective delivery method and been widely used overseas. However it does not receive the same popularity in the People’s Republic of China (PRC). This paper first conducts a literature review on advantages and disadvantages of DB in general; then it gives an overview of the PRC construction industry. There are ample evidences that the DB system will theoretically bring benefits to the PRC construction industry. After a thorough investigation of the current DB market, it can be concluded that the development of the DB system is still at its infancy stage. The barriers to entry have been finally identified, which relate to the legal restraints, negative owner attitude, and high requirement of DB projects. These barriers constitute obstacles to the development of DB system in the PRC. However, with rapid growth of construction industry, new requirements in modern construction projects, and strong promotion from governments, it is believed that the domestic DB market will have great potential in the near future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Design-Build (DB) system has been widely adopted overseas but it has not received the same popularity yet in the People’s Republic of China. The selection of design-build variant is regarded as one of the critical obstacles to the application of this alternative. This paper investigates categories of design-build variants in the construction market of China. The develop-and-construction, enhanced design-build, traditional-design-build and engineering procurement-construction (EPC) are the four current designbuild variants adopted by clients. Each of them is developed to meet a varying set of circumstances and has its own advantages and disadvantages. The develop-and-construction is mostly used in large, complex projects in housing industry and it will guarantee client’s great control over the project while still leave some design room for the contractor. The traditional-design-build and enhanced-design-build systems are mostly applied in projects that are comparatively simple, small-scale, and the DB contractors will have greater control of the projects. The EPC is the extension of pure design-build method and is widely adopted in the petrochemical, metallurgical and electronic fields because of the high-technique requirements and the necessity for one entity to control the design, construction, procurement and commissioning etc. Four corresponding design-build projects are also presented in this paper in order to better illustrate the operational process and provide the insight for understanding the design-build variants in Mainland China.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The concept of constructability integrates individual construction functions and experiences through suitable and timely inputs into early stages of project planning and design. It aims to ease construction processes for a more effective and efficient achievement of overall project objectives. Similarly, the concepts of operability and maintainability integrate the functions and experiences of Operation and Maintenance (O&M) into project planning and design. Various studies suggested that these concepts have been implemented in isolation of each other and thus preventing optimum result in delivering infrastructure projects. This paper explores the integration of these three concepts in order to maximize the benefits of their implementation. It reviews the literature to identify the main O&M concerns, and assesses their association with constructability principles. This provides a structure to develop an extended constructability model that includes O&M concerns. It is anticipated that an extended constructability model that include O&M considerations can lead to a more efficient and effective delivery of infrastructure projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Contamination of packaged foods due to micro-organisms entering through air leaks can cause serious public health issues and cost companies large amounts of money due to product recalls, consumer impact and subsequent loss of market share. The main source of contamination is leaks in packaging which allow air, moisture and microorganisms to enter the package. In the food processing and packaging industry worldwide, there is an increasing demand for cost effective state of the art inspection technologies that are capable of reliably detecting leaky seals and delivering products at six-sigma. The new technology will develop non-destructive testing technology using digital imaging and sensing combined with a differential vacuum technique to assess seal integrity of food packages on a high-speed production line. The cost of leaky packages in Australian food industries is estimated close to AUD $35 Million per year. Contamination of packaged foods due to micro-organisms entering through air leaks can cause serious public health issues and cost companies large sums of money due to product recalls, compensation claims and loss of market share. The main source of contamination is leaks in packaging which allow air, moisture and micro-organisms to enter the package. Flexible plastic packages are widely used, and are the least expensive form of retaining the quality of the product. These packets can be used to seal, and therefore maximise, the shelf life of both dry and moist products. The seals of food packages need to be airtight so that the food content is not contaminated due to contact with microorganisms that enter as a result of air leakage. Airtight seals also extend the shelf life of packaged foods, and manufacturers attempt to prevent food products with leaky seals being sold to consumers. There are many current NDT (non-destructive testing) methods of testing the seal of flexible packages best suited to random sampling, and for laboratory purposes. The three most commonly used methods are vacuum/pressure decay, bubble test, and helium leak detection. Although these methods can detect very fine leaks, they are limited by their high processing time and are not viable in a production line. Two nondestructive in-line packaging inspection machines are currently available and are discussed in the literature review. The detailed design and development of the High-Speed Sensing and Detection System (HSDS) is the fundamental requirement of this project and the future prototype and production unit. Successful laboratory testing was completed and a methodical design procedure was needed for a successful concept. The Mechanical tests confirmed the vacuum hypothesis and seal integrity with good consistent results. Electrically, the testing also provided solid results to enable the researcher to move the project forward with a certain amount of confidence. The laboratory design testing allowed the researcher to confirm theoretical assumptions before moving into the detailed design phase. Discussion on the development of the alternative concepts in both mechanical and electrical disciplines enables the researcher to make an informed decision. Each major mechanical and electrical component is detailed through the research and design process. The design procedure methodically works through the various major functions both from a mechanical and electrical perspective. It opens up alternative ideas for the major components that although are sometimes not practical in this application, show that the researcher has exhausted all engineering and functionality thoughts. Further concepts were then designed and developed for the entire HSDS unit based on previous practice and theory. In the future, it would be envisaged that both the Prototype and Production version of the HSDS would utilise standard industry available components, manufactured and distributed locally. Future research and testing of the prototype unit could result in a successful trial unit being incorporated in a working food processing production environment. Recommendations and future works are discussed, along with options in other food processing and packaging disciplines, and other areas in the non-food processing industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

1. Overview of hotspot identification (HSID)methods 2. Challenges with HSID 3. Bringing crash severity into the ‘mix’ 4. Case Study: Truck Involved Crashes in Arizona 5. Conclusions • Heavy duty trucks have different performance envelopes than passenger cars and have more difficulty weaving, accelerating, and braking • Passenger vehicles have extremely limited sight distance around trucks • Lane and shoulder widths affect truck crash risk more than passenger cars • Using PDOEs to model truck crashes results in a different set of locations to examine for possible engineering and behavioral problems • PDOE models point to higher societal cost locations, whereas frequency models point to higher crash frequency locations • PDOE models are less sensitive to unreported crashes • PDOE models are a great complement to existing practice

Relevância:

100.00% 100.00%

Publicador:

Resumo:

• What is risk compensation, and why is relevant to motor vehicle crashes? • Recent simulator work that revealed risk compensation • Current and future work on risk compensation

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Video is commonly used as a method for recording embodied interaction for purposes of analysis and design and has been proposed as a useful ‘material’ for interaction designers to engage with. But video is not a straight forward reproduction of embodied activity – in themselves video recordings ‘flatten’ the space of embodied interaction, they impose a perspective on unfolding action, and remove the embodied spatial and social context within which embodied interaction unfolds. This does not mean that video is not a useful medium with which to engage as part of a process of investigating and designing for embodied interaction – but crucially, it requires that as people attempting to engage with video, designers own bodies and bodily understandings must be engaged with and brought into play. This paper describes and reflects upon our experiences of engaging with video in two different activities as part of a larger research project investigating the design of gestural interfaces for a dental surgery context.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper investigates energy saving potential of commercial building by living wall and green façade system using Envelope Thermal Transfer Value (ETTV) equation in Sub-tropical climate of Australia. Energy saving of four commercial buildings was quantified by applying living wall and green façade system to the west facing wall. A field experimental facility, from which temperature data of living wall system was collected, was used to quantify wall temperatures and heat gain under controlled conditions. The experimental parameters were accumulated with extensive data of existing commercial building to quantify energy saving. Based on temperature data of living wall system comprised of Australian native plants, equivalent temperature of living wall system has been computed. Then, shading coefficient of plants in green façade system has been included in mathematical equation and in graphical analysis. To minimize the air-conditioned load of commercial building, therefore to minimize the heat gain of commercial building, an analysis of building heat gain reduction by living wall and green façade system has been performed. Overall, cooling energy performance of commercial building before and after living wall and green façade system application has been examined. The quantified energy saving showed that only living wall system on opaque part of west facing wall can save 8-13 % of cooling energy consumption where as only green façade system on opaque part of west facing wall can save 9.5-18% cooling energy consumption of commercial building. Again, green façade system on fenestration system on west facing wall can save 28-35 % of cooling energy consumption where as combination of both living wall on opaque part of west facing wall and green façade on fenestration system on west facing wall can save 35-40% cooling energy consumption of commercial building in sub-tropical climate of Australia.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Although the design-build (DB) system has been demonstrated to be an effective delivery method and has gained popularity worldwide, it has not gained the same popularity in the construction market of China. The objective of this study was, theretofore, to investigate the barriers to entry in the DB market. A total of 22 entry barriers were first identified through an open-ended questionnaire survey with 15 top construction professionals in the construction market of China. A broad questionnaire survey was further conducted to prioritize these entry barriers. Statistical analysis of responses shows that the most dominant barriers to entry into the DB market are, namely, lack of design expertise, lack of interest from owners, lack of suitable organization structure, lack of DB specialists, and lack of credit record system. Analysis of variance indicates that there is no difference of opinions among the respondent groups of academia, government departments, state-owned company, and private company, at the 5% significance level, on most of the barriers to entry. Finally, the underlying dimensions of barriers to entry in the DB market were investigated through factor analysis. The results indicate that there are six major underlying dimensions of entry barriers in DB market, which include, namely, the competence of design-builders, difficulty in project procurement, characteristics of DB projects, lack of support from public sectors, the competence of DB owners, and the immaturity of DB market. These findings are useful for both potential and incumbent design-builders to understand and analyze the DB market in China.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nursing personnel are consistently identified as one of the occupational groups most at risk of work-related musculoskeletal disorders. During the moving and handling of bariatric patients, the weight of the patient combined with atypical body mass contributes to a significant risk of injury to the care provider and patient. This is further compounded by the shape, mobility and co-operation of the patient. The aim of this study was determine user experiences and design requirements for mobile hoists with bariatric patients. Structured interviews were conducted with six experienced injury management staff from the Manual Task Services department of three hospitals in Adelaide, South Australia. All staff had experience in patient handling, the use of patient handling equipment and the provision of patient handling training. A series of open-ended questions were structured around five main themes: 1) patient factors; 2) building/vehicle space and design; 3) equipment and furniture; 4) communication; and 5) staff issues. Questions focussed on the use of mobile hoists for lifting and transferring bariatric patients. Interviews were supplemented with a walk-through of the hospital to view the types of mobile hoists used, and the location and storage of equipment. Across the three hospitals there were differing classification systems to define bariatric patients. Ensuring patient dignity, respect and privacy were viewed as important in the management and rehabilitation of bariatric patients. Storage and space constraints were considered factors restricting the use of mobile floor hoists, with ceiling hoists being the preferred method for patient transfers. When using mobile floor hoists, the forces required to push, pull and manoeuvre, as well as sudden unstable movements of the hoist were considered important risks factors giving rise to a risk of injury to the care provider. Record keeping and purchasing policies appeared to inhibit the effective use of patient handling equipment. The moving and handling of bariatric patients presents complex and challenging issues. A co-ordinated and collaborative approach for moving and handling bariatric patients is needed across the range of care providers. Designers must consider both user and patient requirements.