969 resultados para U.S. Army Combat Systems Test Activity.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

no. 4. Right Bank Road [and] 4 supplements.--no. 8. Clearing: Green Peter Dam.--no.9. Geology and foundations--no. 10. Concrete dam.--no. 11. Powerhouse and switchyard; preliminary design report [and [suppl] 1. Powerhouse; structural and architectural design. [suppl] 2. Powerhouse; mechanical design. no. 13. Fish facilities.--no. 14. Concrete aggregates.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Vols. [2-11]: Appendices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Project reference: 1T025001A129."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes bibliographical references: (p. 157-165).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes bibliographical references: (p. 48-55).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes bibliographical references: (p. 89-94).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes bibliographical references: (p. 196-201).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes bibliographical references: (p. 48-49).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes bibliographical references: (p. 60).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

At head of title: Pascagoula River comprehensive basin study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.