Green Peter Reservoir, Middle Santiam River, Oregon; design memorandum.


Autoria(s): United States. Army. Corps of Engineers.
Data(s)

31/12/1969

Resumo

no. 4. Right Bank Road [and] 4 supplements.--no. 8. Clearing: Green Peter Dam.--no.9. Geology and foundations--no. 10. Concrete dam.--no. 11. Powerhouse and switchyard; preliminary design report [and [suppl] 1. Powerhouse; structural and architectural design. [suppl] 2. Powerhouse; mechanical design. no. 13. Fish facilities.--no. 14. Concrete aggregates.

Mode of access: Internet.

Formato

bib

bib

bib

bib

bib

bib

bib

bib

bib

bib

bib

Identificador

http://hdl.handle.net/2027/coo.31924003851429

http://hdl.handle.net/2027/coo.31924003851445

http://hdl.handle.net/2027/coo.31924003851452

http://hdl.handle.net/2027/coo.31924003851460

http://hdl.handle.net/2027/coo.31924003851478

http://hdl.handle.net/2027/coo.31924003851486

http://hdl.handle.net/2027/coo.31924003851494

http://hdl.handle.net/2027/coo.31924003851502

http://hdl.handle.net/2027/coo.31924003851510

http://hdl.handle.net/2027/coo.31924003851528

http://hdl.handle.net/2027/coo.31924057850251

Idioma(s)

eng

Publicador

[Portland, Or.] Prepared by U. S. Army Engineer District, Portland, Corps of Engineers,

Direitos

Items in this record are available as Public Domain, Google-digitized. View access and use profile at http://www.hathitrust.org/access_use#pd-google. Please see individual items for rights and use statements.

Tipo

text