Green Peter Reservoir, Middle Santiam River, Oregon; design memorandum.
| Data(s) |
31/12/1969
|
|---|---|
| Resumo |
no. 4. Right Bank Road [and] 4 supplements.--no. 8. Clearing: Green Peter Dam.--no.9. Geology and foundations--no. 10. Concrete dam.--no. 11. Powerhouse and switchyard; preliminary design report [and [suppl] 1. Powerhouse; structural and architectural design. [suppl] 2. Powerhouse; mechanical design. no. 13. Fish facilities.--no. 14. Concrete aggregates. Mode of access: Internet. |
| Formato |
bib bib bib bib bib bib bib bib bib bib bib |
| Identificador |
http://hdl.handle.net/2027/coo.31924003851429 http://hdl.handle.net/2027/coo.31924003851445 http://hdl.handle.net/2027/coo.31924003851452 http://hdl.handle.net/2027/coo.31924003851460 http://hdl.handle.net/2027/coo.31924003851478 http://hdl.handle.net/2027/coo.31924003851486 http://hdl.handle.net/2027/coo.31924003851494 http://hdl.handle.net/2027/coo.31924003851502 http://hdl.handle.net/2027/coo.31924003851510 |
| Idioma(s) |
eng |
| Publicador |
[Portland, Or.] Prepared by U. S. Army Engineer District, Portland, Corps of Engineers, |
| Direitos |
Items in this record are available as Public Domain, Google-digitized. View access and use profile at http://www.hathitrust.org/access_use#pd-google. Please see individual items for rights and use statements. |
| Tipo |
text |