999 resultados para Project Independence.
Resumo:
The efforts involved in developing a small satellite for scientific purposes in China in recent years are introduced in the present paper. The project is arranged on a case to case principle depending upon requirements and financial support. The space technology of a satellite and rockets, which have been developed over a relatively longer period in China, have been transferred to the scientific research of small satellites for improvement of the quality requirements. The surplus payloads of the rocket and satellite are used as the payloads of the small satellite and scientific experiments at a low cost. As an example, the project of balloon satellites for atmospheric research was successfully completed in 1991. The experience of the project management is of great benefit for further organization and arrangement of other projects. Opportunities exist for surplus payloads to be used in the future, and a small satellite for magnetospheric research will be launched in 1993.
Resumo:
This is a report to the California Department of Fish and Game. Between 2003 and 2008, the Foundation of CSUMB produced fish habitat maps and GIS layers for CDFG based on CDFG field data. This report describes the data entry, mapping, and website construction procedures associated with the project. Included are the maps that have been constructed. This report marks the completion of the Central Coast region South District Basin Planning and Habitat Mapping Project. (Document contains 40 pages)
Resumo:
“Advanced Watershed Science and Policy (ESSP 660)” is a graduate class taught in the Master of Science in Coastal and Watershed Science & Policy program at California State University Monterey Bay (CSUMB). In 2007, the class was taught in four 4-week modules, each focusing on a local watershed issue. This report is one outcome of one of those 4-week modules taught in the fall 2007 session. (Document contains 32 pages)
Resumo:
The Carr Lake Project aims to convert Carr Lake’s 450 acres of agriculture fields into a regional multi-use park that will benefit flood protection, water quality, and wildlife habitat, while also providing additional recreational areas for the local community. The Project is represented by an informal consortium of interested parties including the Watershed Institute of California State University Monterey Bay, The City of Salinas, 1000 Friends of Carr Lake, and the Big Sur Land Trust. (Document contains 54 pages)
Resumo:
This is a report to the California Department of Parks and Recreation. It describes water quality and aquatic invertebrate monitoring after the construction of the Carmel River Lagoon Enhancement Project. Included are data that have been collected for two years and preliminary assessment of the enhanced ecosystem. This report marks the completion of 3-years of monitoring water quality and aquatic habitat. The report adopts the same format and certain background text from previous years’ reporting by the same research group (e.g. Larson et al., 2005). (Document contains 100 pages)
Resumo:
In summer and fall 2004, the California Department of Parks and Recreation (DPR) initiated the Carmel River Lagoon Enhancement Project. The project involved excavation of a dry remnant Arm of the lagoon and adjacent disused farmland to form a significant new lagoon volume. The intention was to provide habitat, in particular, for two Federally threatened species: the California Red-Legged Frog, and the Steelhead Trout (South Central-Coastal California Evolutionary Significant Unit). DPR contracted with the Foundation of California State University Monterey Bay (Central Coast Watershed Studies Team, Watershed Institute) to monitor water quality and aquatic invertebrates in association with the enhancement, and to attempt to monitor steelhead using novel video techniques. The monitoring objective was to assess whether the enhancement was successful in providing habitat with good water quality, adequate invertebrate food for steelhead, and ultimately the presence of steelhead. (Document contains 102 pages)
Resumo:
(287 page document)