994 resultados para Maintenance Engineering
Resumo:
Although physical activity is recommended in patients on maintenance hemodialysis (MHD), randomized controlled trials testing the effects of exercise in this population have given conflicting results. In general, aerobic exercises mostly failed to produce improvements in physical function, whereas resistance exercises, although less studied, appeared to be more promising. The use of sophisticated materials such as leg press and free weights may preclude widespread application of resistance training in patients on MHD. Simple and cheap elastic bands may thus be an attractive alternative. We tested the feasibility of a supervised intradialytic resistance band exercise training program, and its effects on physical function, in patients on MHD. A total of 11 unselected adult patients on MHD from our center, aged 70 ± 10.7 (mean ± standard deviation) years, including 8 men and 3 women, accepted to follow the program under the supervision of qualified physiotherapists. Thirty-six exercise sessions of moderate intensity (twice a week, mean duration 40 minutes each, during 4.5 to 6 months), mainly involving leg muscles against an elastic resistance, were performed. The exercise program was well tolerated and all patients completed it. Statistically significant improvements were observed in the following tests: Tinetti test, 23.9 ± 3.9 points before versus 25.7 ± 3.5 points after the program (P = .022); the Timed Up and Go test, 12.1 ± 6.6 versus 10 ± 5.8 seconds (P = .0156). Improvements in the 6-minute walk distance and in the one-leg balance tests just failed to reach statistical significance. In this single-center pilot study, an intradialytic resistance band exercise program was feasible, well tolerated, and showed encouraging results on physical function.
Resumo:
This handbook provides a broad, easy to understand reference for temporary traffic control in work zones, addressing the safe and efficient accommodation of all road users: motorists, bicyclists, pedestrians, and those with special needs. When impacting a pedestrian facility, provide ten calendar days advance notification to the local jurisdiction and the National Federation of the Blind of Iowa (www.nfbi.org). The information presented is based on standards and guidance in the 2009 Edition of the Manual on Uniform Traffic Control Devices (MUTCD). References to the MUTCD sign designations in this handbook are shown in parentheses, e.g. (W20-1). Not all the recommendations in this handbook will apply to every circumstance faced by local agencies, and each unique situation may not be addressed. Modifications of the typical applications in this handbook will be required to adapt to specific field conditions. Therefore, use engineering judgment, seeking the advice of experienced professionals and supervisors in difficult and complex interpretations. This handbook can be used as a reference for temporary traffic control in work zones on all city or county roadways. However, always check contract documents and local agency requirements for any pertinent modifications.
Resumo:
Currently there are no guidelines within the Manual on Uniform Traffic Control Devices (MUTCD) on construction phasing and maintenance of traffic (MOT) for retrofit construction and maintenance projects involving innovative geometric designs. The research presented in this report addressed this gap in existing knowledge by investigating the state of the practice of construction phasing and MOT for several types of innovative geometric designs including the roundabout, single point urban interchange (SPUI), diverging diamond interchange (DDI), restricted-crossing left turn (RCUT), median U-turn (MUT), and displaced left turn (DLT). This report provides guidelines for transportation practitioners in developing construction phasing and MOT plans for innovative geometric designs. This report includes MOT Phasing Diagrams to assist in the development of MOT strategies for innovative designs. The MOT Phasing Diagrams were developed through a review of literature, survey, interviews with practitioners, and review of plans from innovative geometric design projects. These diagrams are provided as a tool to assist in improving work zone safety and mobility through construction of projects with innovative geometric designs. The aforementioned synthesis of existing knowledge documented existing practices for these types of designs.
Resumo:
The state Departments of Transportation (DOTs) of Iowa, Michigan, and Minnesota formed a consortium to define and develop the next generation highway maintenance vehicle. The Center for Transportation Research and Education of Iowa State University provided staff support to the concept highway maintenance vehicle project, which focused on winter maintenance activities. Phase I of the three-phase project focused on describing the desirable functions of a concept maintenance vehicle. Phase II will include the development, operation, and evaluation of prototype winter maintenance vehicles. Phase III is envisioned to be a comprehensive fleet evaluation of prototype winter maintenance vehicles. This report covers the activities of Phase I. Phase I included conducting a literature review of materials related to winter highway maintenance activities, identifying ideal capabilities of a winter maintenance vehicle, inviting private sector equipment and technology providers to join the project and commit equipment and expertise for Phase II, and determining the specific equipment and technology to be included on the three prototype vehicles for the winter of 1996-1997. Phase I concluded by establishing that assembling the three prototype vehicles would be beneficial to the project and to the three state DOTs.
Resumo:
This booklet is a compilation of notes taken during motor grader operators workshops held at some 20 different locations throughout Iowa during the last two years. It is also the advice of 16 experienced motor grader operators and maintenance foremen (from 14 different counties around Iowa), who serve as instructors and assistant instructors at the "MoGo" workshops. The instructors have all said that they learn as much from the operators who attend the workshops as they impart. Motor grader operators from throughout Iowa have shown us new, innovative and better ways of maintaining gravel roads. This booklet is an attempt to pass on some of these "tips" that we have gathered from Iowa operators. It will need to be revised, corrected, and added to based on the advice we get from you, the operators who do the work here in Iowa.
Resumo:
What follows are the refined guidelines from the Thin Maintenance Surface: Phase II Report. For that report, test sections were created and monitored along with some existing test sections. From the monitoring and evaluation of these test sections, literature reviews, and the experience and knowledge of the authors, the following guidelines were created. More information about thin maintenance surfaces and their uses can be found in the above-mentioned report.
Resumo:
This bulletin is a compilation of the reports on completed research done for the Iowa State Highway Research Board Project HR-1, "The Loess and Glacial Till Materials of Iowa; an Investigation of Their Physical and Chemical Properties and Techniques for Processing Them to Increase Their All-Weather Stability for Road Construction.” The research, started in 1950, was done by the Iowa Engineering Experiment Station under its project 283-S. The project was supported by funds from the Iowa State Highway Commission.
Resumo:
Abstract
Resumo:
The objective of this work was to determine the maintenance requirement and the deposition efficiency of lysine in growing pigs. It was used the incomplete changeover experimental design, with replicates over time. Twelve castrated pigs with average body weight (BW) of 52±2 kg were kept in metabolism crates with a controlled temperature of 22ºC. The diets were formulated to supply 30, 50, 60, and 70% of the expected requirements of standardized lysine, and provided at 2.6 times the energy requirements for maintenance. The trial lasted 24 days and was divided into two periods of 12 days: seven days for animal adaptation to the diet and five days for sample collection. The increasing content of lysine in the diet did not affect dry matter intake of the pigs. The amount of nitrogen excreted was 47% of the nitrogen intake, of which 35% was excreted through feces and 65% through urine. The estimated endogenous losses of lysine were 36.4 mg kg-1 BW0.75. The maintenance requirement of lysine for pigs weighing around 50 kg is 40.4 mg kg-1 BW0.75, and the deposition efficiency of lysine is 90%.
Resumo:
Työn tavoitteena on tutkia intranetin ylläpitoprosessien merkitystä sisäisen viestinnän, tiedonhallinnan ja käytettävyyden kannalta. Työn kirjallisuusosuuden tavoitteena on tutustua yrityksen sisäisen viestinnän eri tekijöihin, tavoitteisiin, merkityksiin ja menetelmiin. Intranetin roolia organisaation kontekstissa tarkastellaan näkökulmista: organisaatio, tieto organisaatiossa, organisaatioiden sisäinen viestintä ja viestintäteknologian keinot sisäiseen viestintään. Kirjallisuusosan toisena tavoitteena on tutustua käyttäjäkeskeisen suunnittelun lähtökohtiin ja malleihin. Nykypäivän tuotteissa käyttäjäkeskeisyys on itsestään selvää, ja se otetaankin huomioon jo tuotesuunnittelun alkuvaiheista lähtien. Työssä tutustutaan kolmeen käyttäjäkeskeisen suunnittelun prosessimalliin: ISO 13407 –prosessimalli, Usability engineering lifecycle ja vaatimusmäärittelyn spiraalimalli. Työssä esitellään myös käyttäjäkeskeisen vaatimusmäärittelyn toteuttamiseen liittyviä vaiheita, tekijöitä ja toimenpiteitä. Työn käytännönosuudessa tarkastellaan case-yrityksen intranet-palvelun nykytilannetta ja kuvataan nykyinen ylläpitoprosessi ja sen ongelmakohdat. Työn tavoitteena on pohtia ratkaisuja näihin ongelmiin. Käytännössä tämä tarkoittaa intranetin vaatimusmäärittelyn tekemistä, jonka pohjalta voidaan tunnistaa kehityskohteet ja tehdä suunnitelma toimintojen kehittämisestä. Työn lopputuloksena saadaan prosessien kuvaus, joilla ylläpito hoituu parhaiten.