935 resultados para Green management
Resumo:
This paper attempts to determine whether the adoption of recommended corporate governance practices by Chinese firms is associated with less earnings management proxied by abnormal accruals. We examine the role of the audit committee and ownership concentration in preventing earnings management using Chinese firms listed in Hong Kong. The results of this preliminary analysis show that the frequency of audit committee meetings is associated with reduced levels of abnormal accruals, our measure of earnings management. We conclude that audit committee activity is an important factor in constraining the propensity of managers to engage in earnings management. In contrast, we find that the size of the audit committee is associated with increased levels of abnormal accruals and suggest that increasing the size of the audit committee creates information asymmetry between the audit committee and management that reduces the monitoring capacity of the audit committee. We do not find any association between audit committee independence, financial and industry experience, or ownership concentration and abnormal accruals.
Resumo:
There is a widespread recognition to the need of better manage municipal property in most cities in the world. Structural problems across regional, state, and territorial governments that have legal powers to own and maintain real property are similar, regardless of the level of development of each country. Start from a very basic level of property inventory records. The need for better manage to the local government owned property is the result of widespread decentralisation initiatives that often have devolved huge property portfolios from central to local governments almost “overnight”. At the same time municipal or regional governments were and continue to be unprepared to deal with multiple issues related to the role of property owners and managers. The lack of discussion of public asset management especially the elements that should be incorporated in the framework creates an important challenge to study the discipline of public asset management further. The aim of this paper is to study the practices of public asset management in developed countries, especially the elements of public asset management framework, and its transferability to developing countries. A case study was selected and conducted to achieve this aim. They involved interviews and a focus group. The study found that in public asset management framework, proper asset identification, public asset needs analysis, asset life cycle and performance measurements are an important element that should be incorporated in the framework. Those elements are transferable and applicable to developing countries’ local governments. Finally, findings from this study provide useful input for the local government policy makers, scholars and asset management practitioners to establish a public asset management framework toward more efficient and effective local governments in managing their assets as well as increasing public services quality.
Resumo:
Information security policy defines the governance and implementation strategy for information security in alignment with the corporate risk policy objectives and strategies. Research has established that alignment between corporate concerns may be enhanced when strategies are developed concurrently using the same development process as an integrative relationship is established. Utilizing the corporate risk management framework for security policy management establishes such an integrative relationship between information security and corporate risk management objectives and strategies. There is however limitation in the current literature on presenting a definitive approach that fully integrates security policy management with the corporate risk management framework. This paper presents an approach that adopts a conventional corporate risk management framework for security policy development and management to achieve alignment with the corporate risk policy. A case example is examined to illustrate the alignment achieved in each process step with a security policy structure being consequently derived in the process. It is shown that information security policy management outcomes become both integral drivers and major elements of the corporate-level risk management considerations. Further study should involve assessing the impact of the use of the proposed framework in enhancing alignment as perceived in this paper.
Resumo:
The concept of asset management is not a new but an evolving idea that has been attracting attention of many organisations operating and/or owning some kind of infrastructure assets. The term asset management have been used widely with fundamental differences in interpretation and usage. Regardless of the context of the usage of the term, asset management implies the process of optimising return by scrutinising performance and making key strategic decisions throughout all phases of an assets lifecycle (Sarfi and Tao, 2004). Hence, asset management is a philosophy and discipline through which organisations are enabled to more effectively deploy their resources to provide higher levels of customer service and reliability while balancing financial objectives. In Australia, asset management made its way into the public works in 1993 when the Australian Accounting Standard Board issued the Australian Accounting Standard 27 – AAS27. Standard AAS27 required government agencies to capitalise and depreciate assets rather than expense them against earnings. This development has indirectly forced organisations managing infrastructure assets to consider the useful life and cost effectiveness of asset investments. The Australian State Treasuries and the Australian National Audit Office was the first organisation to formalise the concepts and principles of asset management in Australia in which they defined asset management as “ a systematic, structured process covering the whole life of an asset”(Australian National Audit Office, 1996). This initiative led other Government bodies and industry sectors to develop, refine and apply the concept of asset management in the management of their respective infrastructure assets. Hence, it can be argued that the concept of asset management has emerged as a separate and recognised field of management during the late 1990s. In comparison to other disciplines such as construction, facilities, maintenance, project management, economics, finance, to name a few, asset management is a relatively new discipline and is clearly a contemporary topic. The primary contributors to the literature in asset management are largely government organisations and industry practitioners. These contributions take the form of guidelines and reports on the best practice of asset management. More recently, some of these best practices have been made to become a standard such as the PAS 55 (IAM, 2004, IAM, 2008b) in UK. As such, current literature in this field tends to lack well-grounded theories. To-date, while receiving relatively more interest and attention from empirical researchers, the advancement of this field, particularly in terms of the volume of academic and theoretical development is at best moderate. A plausible reason for the lack of advancement is that many researchers and practitioners are still unaware of, or unimpressed by, the contribution that asset management can make to the performance of infrastructure asset. This paper seeks to explore the practices of organisations that manage infrastructure assets to develop a framework of strategic infrastructure asset management processes. It will begin by examining the development of asset management. This is followed by the discussion on the method to be adopted for this paper. Next, is the discussion of the result form case studies. It first describes the goals of infrastructure asset management and how they can support the broader business goals. Following this, a set of core processes that can support the achievement of business goals are provided. These core processes are synthesised based on the practices of asset managers in the case study organisations.
Resumo:
Bovine intestine was dried in a heat pump fluid bed combination. Minimum fluidisation velocity was calculated by Ergun Equation and some relations were established.
Resumo:
The trend of diminished funding, demands for greater efficiency and higher public accountability have led to a rapid expansion of interest in the bibliometric assessment of research performance of universities. A pilot research is conducted to provide a preliminary overview of the research performance of the building and construction schools or departments through the analysis of bibliometric indicators including the journal impact factor (JIF) published by Institute for Scientific Information (ISI). The suitability of bibliometric evaluation approaches as a measure of research quality in building and construction management research field is discussed.
Resumo:
The increasing scarcity of water in the world, along with rapid population increase in urban areas, gives reason for concern and highlights the need for integrating water and wastewater management practices. The uncontrolled growth in urban areas has made planning, management and expansion of water and wastewater infrastructure systems very difficult and expensive. In order to achieve sustainable wastewater treatment and promote the conservation of water and nutrient resources, this chapter advocates the need for a closed-loop treatment system approach, and the transformation of the traditional linear treatment systems into integrated cyclical treatment systems. The recent increased understanding of integrated resource management and a shift towards sustainable management and planning of water and wastewater infrastructure are also discussed.
Resumo:
Australia, road crash trauma costs the nation A$15 billion annually whilst the US estimates an economic impact of around US$ 230 billion on its network. Worldwide economic cost of road crashes is estimated to be around US$ 518 billion each year. Road accidents occur due to a number of factors including driver behaviour, geometric alignment, vehicle characteristics, environmental impacts, and the type and condition of the road surfacing. Skid resistance is considered one of the most important road surface characteristics because it has a direct effect on traffic safety. In 2005, Austroads (the Association of Australian and New Zealand Road Transport and Traffic Authorities) published a guideline for the management of skid resistance and Queensland Department of Main Roads (QDMR) developed a skid resistance management plan (SRMP). The current QDMR strategy is based on rationale analytical methodology supported by field inspection with related asset management decision tools. The Austroads’s guideline and QDMR's skid resistance management plan have prompted QDMR to review its skid resistance management practice. As a result, a joint research project involving QDMR, Queensland University of Technology (QUT) and the Corporative Research Centre for Integrated Engineering Asset Management (CRC CIEAM) was formed. The research project aims at investigating whether there is significant relationship between road crashes and skid resistance on Queensland’s road networks. If there is, the current skid resistance management practice of QDMR will be reviewed and appropriate skid resistance investigatory levels will be recommended. This paper presents analysis results in assessing the relationship between wet crashes and skid resistance on Queensland roads. Attributes considered in the analysis include surface types, annual average daily traffic (AADT), speed and seal age.
Resumo:
Many infrastructure and necessity systems such as electricity and telecommunication in Europe and the Northern America were used to be operated as monopolies, if not state-owned. However, they have now been disintegrated into a group of smaller companies managed by different stakeholders. Railways are no exceptions. Since the early 1980s, there have been reforms in the shape of restructuring of the national railways in different parts of the world. Continuous refinements are still conducted to allow better utilisation of railway resources and quality of service. There has been a growing interest for the industry to understand the impacts of these reforms on the operation efficiency and constraints. A number of post-evaluations have been conducted by analysing the performance of the stakeholders on their profits (Crompton and Jupe 2003), quality of train service (Shaw 2001) and engineering operations (Watson 2001). Results from these studies are valuable for future improvement in the system, followed by a new cycle of post-evaluations. However, direct implementation of these changes is often costly and the consequences take a long period of time (e.g. years) to surface. With the advance of fast computing technologies, computer simulation is a cost-effective means to evaluate a hypothetical change in a system prior to actual implementation. For example, simulation suites have been developed to study a variety of traffic control strategies according to sophisticated models of train dynamics, traction and power systems (Goodman, Siu and Ho 1998, Ho and Yeung 2001). Unfortunately, under the restructured railway environment, it is by no means easy to model the complex behaviour of the stakeholders and the interactions between them. Multi-agent system (MAS) is a recently developed modelling technique which may be useful in assisting the railway industry to conduct simulations on the restructured railway system. In MAS, a real-world entity is modelled as a software agent that is autonomous, reactive to changes, able to initiate proactive actions and social communicative acts. It has been applied in the areas of supply-chain management processes (García-Flores, Wang and Goltz 2000, Jennings et al. 2000a, b) and e-commerce activities (Au, Ngai and Parameswaran 2003, Liu and You 2003), in which the objectives and behaviour of the buyers and sellers are captured by software agents. It is therefore beneficial to investigate the suitability or feasibility of applying agent modelling in railways and the extent to which it might help in developing better resource management strategies. This paper sets out to examine the benefits of using MAS to model the resource management process in railways. Section 2 first describes the business environment after the railway 2 Modelling issues on the railway resource management process using MAS reforms. Then the problems emerge from the restructuring process are identified in section 3. Section 4 describes the realisation of a MAS for railway resource management under the restructured scheme and the feasible studies expected from the model.
Resumo:
Aim: This paper is a report of a study conducted to determine the effectiveness of a community case management collaborative education intervention in terms of satisfaction, learning and performance among public health nurses. Background: Previous evaluation studies of case management continuing professional education often failed to demonstrate effectiveness across a range of outcomes and had methodological weaknesses such as small convenience samples and lack of control groups. Method: A cluster randomised controlled trial was conducted between September 2005 and February 2006. Ten health centre clusters (5 control, 5 intervention) recruited 163 public health nurses in Taiwan to the trial. After pre-tests for baseline measurements, public health nurses in intervention centres received an educational intervention of four half-day workshops. Post-tests for both groups were conducted after the intervention. Two-way repeated measures analysis of variance was performed to evaluate the effect of the intervention on target outcomes. Results: A total of 161 participants completed the pre- and post-intervention measurements. This was almost a 99% response rate. Results revealed that 97% of those in the experimental group were satisfied with the programme. There were statistically significant differences between the two groups in knowledge (p = 0.001), confidence in case management skills (p = 0.001), preparedness for case manager role activities (p = 0.001), self-reported frequency in using skills (p = 0.001), and role activities (p = 0.004). Conclusion: Collaboration between academic and clinical nurses is an effective strategy to prepare nurses for rapidly-changing roles.
Resumo:
Organisations owning and managing infrastructure asset are constantly striving to obtain the greatest lifetime value from their infrastructure assets. Many such organisations have adopted the concept of “asset management” with the aim of improving the performance of their infrastructure assets. This paper evaluates the adoption of asset management to improve performance in the context of organisations managing infrastructure assets. Relevant previous research studies on main barriers to the adoption of asset management are reviewed. Analysis of these findings, together with deductive reasoning, leads to the development of the proposed improvement strategies. Three issues were identified as barrier to the advancement of the concept of asset management. They are (1) lack of recognition, (2) fragmentation; and (3) growing complexity. To overcome these issues, this paper suggests that the organisations manage infrastructure assets must (1) adopt a more strategic approach in the management of infrastructure assets, (2) develop a framework of strategic infrastructure asset management processes, and (3) identify the core capabilities needed in the management of infrastructure assets. This paper presents the direction for further research to advance the concept of asset management in the management of infrastructure asset.
Resumo:
Infrastructure organisations such as airport, seaport, rail and road are operating in an increasingly challenging business environment as a result of globalisation, privatisation and deregulation. These organisations must ensure that their main resource i.e. their infrastructure assets are well managed in order to support their business operations. Brisbane Airport is used as a case study to understand the challenges faced in the management of infrastructure assets as well as the approaches used to overcome them. The findings can be useful in helping asset managers to identify the resources they should seek to manipulate in order to make improvement to their activities and contribute to the overall performance of their organisation.
Resumo:
Various countries have been introducing sustainable assessment tools for real estate design to produce integrated sustainability components not just for the building, but also the landscape component of the development. This paper aims to present the comparison between international and local assessment tools of landscape design for housing estate developments in Bangkok Metropolitan Region (BMR), Thailand. The methodologies used are to review, then compare and identify discrepancy indicators among the tools. This paper will examine four international tools; LEED for Neighbourhood Development (LEED – ND) of United State of America (USA), EnviroDevelopment standards of Australia, Residential Landscape Sustainability of United Kingdom (UK) and Green Mark for Infrastructure of Singapore; and three BMR’s existing tools; Land Subdivision Act B.E. 2543, Environmental Impact Assessment Monitoring Awards (EIA-MA) and Thai’s Rating for Energy and Environmental Sustainability of New construction and major renovation (TREES-NC). The findings show that there are twenty two elements of three categories which are neighbourhood design, community management, and environmental condition. Moreover, only one element in neighbourhood designs different between the international and local tools. The sustainable assessment tools have existed in BMR but they are not complete in only one assessment tool. Thus, the development of new comprehensive assessment tool will be necessary in BMR; however, it should meet the specific environment and climate condition for housing estate development at BMR.
Resumo:
Sustainable urban development and the liveability of a city are increasingly important issues in the context of land use planning and infrastructure management. In recent years, the promotion of sustainable urban development in Australia and overseas is facing various physical, socio-economic and environmental challenges. These challenges and problems arise from the lack of capability of local governments to accommodate the needs of the population and economy in a relatively short timeframe. The planning of economic growth and development is often dealt with separately and not included in the conventional land use planning process. There is also a sharp rise in the responsibilities and roles of local government for infrastructure planning and management. This increase in responsibilities means that local elected officials and urban planners have less time to prepare background information and make decisions. The Brisbane Urban Growth Model has proven initially successful in providing a dynamic platform to ensure timely and coordinated delivery of urban infrastructure. Most importantly, this model is the first step for local governments in moving toward a systematic approach to pursuing sustainable and effective urban infrastructure management.