945 resultados para pre-development project study
Resumo:
Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.
Resumo:
Since pre-colonial times the indigenous communities of Mayan origin in the state of Quintana Roo, Mexico, widely practice home gardens on a sustainable basis as the principal form of family agriculture. This study analyzes the structural complexity, functional diversity and management strategy of these indigenous home gardens in order to attempt to propose recommendations for improved family farming. The Mayan home gardens are structured into three or more vertical layers of multiple plant species of herbs, shrubs and trees, and horizontally into well-defined zones for production of both domestic and wild animals. The home gardens provide multiple services apart from food and nutrition security. For sustainable bottom-up rural development, we recommend the continuation of multifunctional home gardens.
Resumo:
El estudio de pre-factibilidad para ampliar la planta de lácteos de la cooperativa Coagroles en el municipio de Sesquilé, ubicado en Cundinamarca, surgió con el fin de aportar a los miembros de la cooperativa desde una punto de vista académico, cómo pueden tener un mejor desempeño en las labores para que el funcionamiento de la Cooperativa sea exitoso. Al notar que los asociados de Coagroles han mostrado el interés por este proyecto, nosotros como estudiantes de Administración de Negocios Internacionales y Administración en Logística y Producción, hemos puesto nuestros conocimientos a una investigación, donde se han analizado tanto fortalezas como debilidades con el fin de encontrar alternativas y opciones para mejorar la situación actual como es la producción y enfriamiento de la leche. Teniendo como objetivo el incremento en los ingresos económicos de la cooperativa Coagroles. Este es un trabajo realizado en alianza con una entidad educativa, en este caso Universidad del Rosario y entidades del Gobierno, donde juntos son los encargados del desarrollo integrar de todo el país. Busca brindar a la ciudadanía oportunidades de mejora y progreso en las actividades económicas que realizan. Actualmente, se vive una situación de complejidad en los mercados, donde cada día son más exigentes, teniendo en cuenta que los pequeños productores deben ir fortaleciéndose para competir con otras entidades no solo a nivel nacional sino próximamente a nivel internacional.
Resumo:
Este proyecto hace parte del Convenio suscrito entre El Colegio Mayor de Nuestra Señora del Rosario y la Gobernación de Cundinamarca, para adelantar el proyecto de “Municipio Saludables como Polo de Desarrollo Local (MSPDL)”, cuyo objetivo general es mejorar la calidad de vida de los habitantes de tres (3) municipios escogidos por la Gobernación de Cundinamarca: Mesitas de El Colegio, ubicado en la Provincia del Tequendama, Sesquilé y Machetá, ubicados en la Provincia de Almeidas. En el desarrollo del proyecto la Facultad de Administración de la Universidad del Rosario encontró en el municipio de Machetà, la Asociación “Vuestra Honrosa Labranza, asociación, formada por miembros de tres (3) veredas en el municipio. En las visitas realizadas al municipio y en las charlas sostenidas con algunos de los socios, manifestaron interés por la implementación del proyecto en su asociación. En reuniones y conversaciones sostenidas con el Secretario de Desarrollo Social de la Gobernación de Cundinamarca, en los que se han presentado varios informes de avance del proyecto Municipio Saludable como Polo de Desarrollo Local (MSPDL), se comentó explícitamente la problemática planteada por la Asociación Vuestra Honrosa Labranza”, con el fin de conseguir una forma para apoyarlos, con el montaje de un tanque de enfriamiento de leche. Para el desarrollo del estudio de Pre factibilidad del montaje de un tanque para el enfriamiento de la leche, se desarrollaran los capítulos de mercado, técnico, administrativo, legal, ambiental y financiero, con el fin de evaluar si esta información es suficiente y decidir si la idea del proyecto es viable o no.
Resumo:
Estudia la historia social de Gran Bretaña en los últimos mil años, a través de un viaje en el tiempo en una nave espacial averiada. Cumple con los requisitos del currículo nacional inglés para la etapa de 3 de secundaria (key stage 3).Este texto esta preparado para el Schools History Project creado en 1972 para mejorar el estudio de la historia entre estudiantes de trece a dieciséis años. Reconsidera las formas en que la historia contribuye a las necesidades educativas de los jóvenes, y por ello idea nuevos objetivos, nuevos criterios para la planificación y desarrollo del curso, así como de nuevos materiales de apoyo. Requiere nuevos criterios de evaluación y, por tanto nuevos exámenes y, adquirió mayor expansión con la introducción del General Certificate of Secondary Education (GCSE) en 1987.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.
Resumo:
The practical application of systemic sustainability analysis (SSA; Bell and Morse, 1999) as applied in-a project instigated and managed by 'Blue Plan', one of the regional activity centres of the Mediterranean Action Plan, is set out and explained in this paper. The context in which SSA was applied and adapted to SPSA (systemic and prospective sustainability analysis). is described in the Mediterranean, primarily in Malta. The SSA process is summarized, its extension and linkage to the prospective approach is described and the comments of stakeholders in the context are added. Some preliminary outcomes are suggested. The pauticular focus of the paper is on the lessons learned from doing SSA/SPSA within a classic blueprint project framework. It is-not assumed that SSA/SPSA is 'finished' or 'definitive'. Rather, we suggest that it is a developing and changing approach that practitioners can adapt and change to meet the specific needs of the circumstances that confront them. Copyright (C) 2004 John Wiley & Sons, Ltd and ERP Environment.
Resumo:
We give an overview on the development of "horizontal" European Committee for Standardisation (CEN) standards for characterising soils, sludges and biowaste in the context of environmental legislation in the European Union (EU). We discuss the various steps in the development of a horizontal standard (i.e. assessment of the possibility of such a standard, review of existing normative documents, pre-normative testing and validation) and related problems. We also provide a synopsis of European and international standards covered by the so-called Project HORIZONTAL. (C) 2004 Elsevier Ltd. All rights reserved.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private development consisting of an extension to an existing building to provide a wholesale butchery facility. The project used a conventionally organized management process. The organization structure adopted on the project is analysed using concepts from the systems theory, which are included in Walkers theoretical model of the structure of building project organizations. This model proposes that the process of building provision can be viewed as systems and sub-systems that are differentiated from each other at decision points. Further to this, the sub-systems can be viewed as the interaction of managing system and operating system. Using Walkers model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. The project's organization structure diverged from the models propositions resulting in delay to the project's completion and cost overrun but the client was satisfied with the project functionally.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an engineering factory and offices. A multi-disciplinary professional practice was used to manage and design the project. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of buildings provision can be viewed as systems and sub-systems which are differentiated form each other at decision points. Further to this, the sub-systematic analysis of the relationship between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. There was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's proposition. However, the project was subject to string environmental forces which the project organization was not capable of entirely overcoming.
Resumo:
Gaining public acceptance is one of the main issues with large-scale low-carbon projects such as hydropower development. It has been recommended by the World Commission on Dams that to gain public acceptance, publicinvolvement is necessary in the decision-making process (WCD, 2000). As financially-significant actors in the planning and implementation of large-scale hydropowerprojects in developing country contexts, the paper examines the ways in which publicinvolvement may be influenced by international financial institutions. Using the casestudy of the NamTheun2HydropowerProject in Laos, the paper analyses how publicinvolvement facilitated by the Asian Development Bank had a bearing on procedural and distributional justice. The paper analyses the extent of publicparticipation and the assessment of full social and environmental costs of the project in the Cost-Benefit Analysis conducted during the projectappraisal stage. It is argued that while efforts were made to involve the public, there were several factors that influenced procedural and distributional justice: the late contribution of the Asian Development Bank in the projectappraisal stage; and the issue of non-market values and discount rate to calculate the full social and environmental costs.
Resumo:
Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM’, while judged to be successful and actively supporting users, was delivered through an exploratory and emergent development process of informal prototyping. Technical IT skills were adopted into the construction project through personal relationships and arrangements rather than formal processes. Implementation was driven by construction project employees rather than controlled centrally by the corporate IT function.
Resumo:
The chapter starts from the premise that an historically- and institutionally-formed orientation to music education at primary level in European countries privileges a nineteenth century Western European music aesthetic, with its focus on formal characteristics such as melody and rhythm. While there is a move towards a multi-faceted understanding of musical ability, a discrete intelligence and willingness to accept musical styles or 'open-earedness', there remains a paucity of documented evidence of this in research at primary school level. To date there has been no study undertaken which has the potential to provide policy makers and practitioners with insights into the degree of homogeneity or universality in conceptions of musical ability within this educational sector. Against this background, a study was set up to explore the following research questions: 1. What conceptions of musical ability do primary teachers hold a) of themselves and; b) of their pupils? 2. To what extent are these conceptions informed by Western classical practices? A mixed methods approach was used which included survey questionnaire and semi-structured interview. Questionnaires have been sent to all classroom teachers in a random sample of primary schools in the South East of England. This was followed up with a series of semi-structured interviews with a sub-sample of respondents. The main ideas are concerned with the attitudes, beliefs and working theories held by teachers in contemporary primary school settings. By mapping the extent to which a knowledge base for teaching can be resistant to change in schools, we can problematise primary schools as sites for diversity and migration of cultural ideas. Alongside this, we can use the findings from the study undertaken in an English context as a starting point for further investigation into conceptions of music, musical ability and assessment held by practitioners in a variety of primary school contexts elsewhere in Europe; our emphasis here will be on the development of shared understanding in terms of policies and practices in music education. Within this broader framework, our study can have a significant impact internationally, with potential to inform future policy making, curriculum planning and practice.
Resumo:
Purpose This study investigated whether vergence and accommodation development in pre-term infants is pre-programmed or is driven by experience. Methods 32 healthy infants, born at mean 34 weeks gestation (range 31.2-36 weeks) were compared with 45 healthy full-term infants (mean 40.0 weeks) over a 6 month period, starting at 4-6 weeks post-natally. Simultaneous accommodation and convergence to a detailed target were measured using a Plusoptix PowerRefII infra-red photorefractor as a target moved between 0.33m and 2m. Stimulus/response gains and responses at 0.33m and 2m were compared by both corrected (gestational) age and chronological (post-natal) age. Results When compared by their corrected age, pre-term and full-term infants showed few significant differences in vergence and accommodation responses after 6-7 weeks of age. However, when compared by chronological age, pre-term infants’ responses were more variable, with significantly reduced vergence gains, reduced vergence response at 0.33m, reduced accommodation gain, and increased accommodation at 2m, compared to full-term infants between 8-13 weeks after birth. Conclusions When matched by corrected age, vergence and accommodation in pre-term infants show few differences from full-term infants’ responses. Maturation appears pre-programmed and is not advanced by visual experience. Longer periods of immature visual responses might leave pre-term infants more at risk of development of oculomotor deficits such as strabismus.
Resumo:
A laboratory offset press has been developed over the last five years at PAPRO for testing print qualityon newsprint, as at present, there is no good way for the mills to test this issue. In this project a comparisonhas been made between a laboratory offset press and a commercial press to see if the laboratoryoffset press can be used as a reliable test method or if a further development is needed.To evaluate the method, similar papers have been printed in both presses and compared using imageanalysis techniques. All together eighteen samples were tested which is enough to give comparableresults. The print quality showed a high variation, the values from the laboratory offset press and thecommercial press were not following the same trends. At present time the laboratory offset press needsome further development before it can be used as a reliable test method for halftone prints. Even sosome conclusions were made.The newsprint that has been used came from Norske Skog Tasman Mill (Kawerau), since the otheraim of this project was to do a repeatability study of their three existing paper machines to distinguishpossible differences in the production. The paper samples were taken from each paper machine on sixdifferent dates to give a representative result. This also gave the opportunity to compare the machinesbetween themselves. Comparison between the machines shows that the wire side gives a better andmore even result than the topside on the prints from the laboratory offset press. According to the resultfrom the commercial press the wire side shows a higher degree of variability. Samples from papermachine 2 and 3 were less variable and had the lowest standard deviation of grey level for solid areas.This suggests that newsprints from PM 2 and PM 3 give a more even print quality with a better inkcoverage.