829 resultados para cost of capital estimation
Resumo:
"April 1995."
Resumo:
"October 1993."
Resumo:
The purpose of this research was to estimate the cost-effectiveness of two rehabilitation interventions for breast cancer survivors, each compared to a population-based, non-intervention group (n = 208). The two services included an early home-based physiotherapy intervention (DAART, n = 36) and a group-based exercise and psychosocial intervention (STRETCH, n = 31). A societal perspective was taken and costs were included as those incurred by the health care system, the survivors and community. Health outcomes included: (a) 'rehabilitated cases' based on changes in health-related quality of life between 6 and 12 months post-diagnosis, using the Functional Assessment of Cancer Therapy - Breast Cancer plus Arm Morbidity (FACT-B+4) questionnaire, and (b) quality-adjusted life years (QALYs) using utility scores from the Subjective Health Estimation (SHE) scale. Data were collected using self-reported questionnaires, medical records and program budgets. A Monte-Carlo modelling approach was used to test for uncertainty in cost and outcome estimates. The proportion of rehabilitated cases was similar across the three groups. From a societal perspective compared with the non-intervention group, the DAART intervention appeared to be the most efficient option with an incremental cost of $1344 per QALY gained, whereas the incremental cost per QALY gained from the STRETCH program was $14,478. Both DAART and STRETCH are low-cost, low-technological health promoting programs representing excellent public health investments.
Resumo:
In various signal-channel-estimation problems, the channel being estimated may be well approximated by a discrete finite impulse response (FIR) model with sparsely separated active or nonzero taps. A common approach to estimating such channels involves a discrete normalized least-mean-square (NLMS) adaptive FIR filter, every tap of which is adapted at each sample interval. Such an approach suffers from slow convergence rates and poor tracking when the required FIR filter is "long." Recently, NLMS-based algorithms have been proposed that employ least-squares-based structural detection techniques to exploit possible sparse channel structure and subsequently provide improved estimation performance. However, these algorithms perform poorly when there is a large dynamic range amongst the active taps. In this paper, we propose two modifications to the previous algorithms, which essentially remove this limitation. The modifications also significantly improve the applicability of the detection technique to structurally time varying channels. Importantly, for sparse channels, the computational cost of the newly proposed detection-guided NLMS estimator is only marginally greater than that of the standard NLMS estimator. Simulations demonstrate the favourable performance of the newly proposed algorithm. © 2006 IEEE.
Resumo:
The objective of the thesis was to analyse several process configurations for the production of electricity from biomass. Process simulation models using AspenPlus aimed at calculating the industrial performance of power plant concepts were built, tested, and used for analysis. The criteria used in analysis were performance and cost. All of the advanced systems appear to have higher efficiencies than the commercial reference, the Rankine cycle. However, advanced systems typically have a higher cost of electricity (COE) than the Rankine power plant. High efficiencies do not reduce fuel costs enough to compensate for the high capital costs of advanced concepts. The successful reduction of capital costs would appear to be the key to the introduction of the new systems. Capital costs account for a considerable, often dominant, part of the cost of electricity in these concepts. All of the systems have higher specific investment costs than the conventional industrial alternative, i.e. the Rankine power plant; Combined beat and power production (CUP) is currently the only industrial area of application in which bio-power costs can be considerably reduced to make them competitive. Based on the results of this work, AsperiPlus is an appropriate simulation platform. How-ever, the usefulness of the models could be improved if a number of unit operations were modelled in greater detail. The dryer, gasifier, fast pyrolysis, gas engine and gas turbine models could be improved.
Resumo:
Most parametric software cost estimation models used today evolved in the late 70's and early 80's. At that time, the dominant software development techniques being used were the early 'structured methods'. Since then, several new systems development paradigms and methods have emerged, one being Jackson Systems Development (JSD). As current cost estimating methods do not take account of these developments, their non-universality means they cannot provide adequate estimates of effort and hence cost. In order to address these shortcomings two new estimation methods have been developed for JSD projects. One of these methods JSD-FPA, is a top-down estimating method, based on the existing MKII function point method. The other method, JSD-COCOMO, is a sizing technique which sizes a project, in terms of lines of code, from the process structure diagrams and thus provides an input to the traditional COCOMO method.The JSD-FPA method allows JSD projects in both the real-time and scientific application areas to be costed, as well as the commercial information systems applications to which FPA is usually applied. The method is based upon a three-dimensional view of a system specification as opposed to the largely data-oriented view traditionally used by FPA. The method uses counts of various attributes of a JSD specification to develop a metric which provides an indication of the size of the system to be developed. This size metric is then transformed into an estimate of effort by calculating past project productivity and utilising this figure to predict the effort and hence cost of a future project. The effort estimates produced were validated by comparing them against the effort figures for six actual projects.The JSD-COCOMO method uses counts of the levels in a process structure chart as the input to an empirically derived model which transforms them into an estimate of delivered source code instructions.
Resumo:
Aim of the paper: The purpose is to gather the practices and to model the impacts of climate change on fiscal spending and revenues, responsibilities and opportunities, balance and debt related to climate change (CC). Methodology of the paper: The methodology will distinguish fiscal cost of mitigation and adaptation, besides direct and indirect costs. It will also introduce cost benefit analyses to evaluate the propensity of policy makers for action or passivity. Several scenarios will be drafted to see the different outcomes. The scenarios shall contain the possible losses in the natural and artificial environment and resources. Impacts on public budget are based on damage of income opportunities and capital/wealth/natural assets. There will be a list of actions when the fiscal correction of market failures will be necessary. Findings: There will be a summary and synthesis of estimation models on CC impacts on public finances, and morals of existing/existed budgeting practices on mitigation. The model will be based on damages (and maybe benefits) from CC, adjusted with probabilities of sce-narios and policy making propensity for action. Findings will cover the way of funding of fiscal costs. Practical use, value added: From the synthesis of model, the fiscal cost of mitigation and adaptation can be estimated for any developed, emerging and developing countries. The paper will try to reply, also, for the challenge how to harmonize fiscal and developmental sustainability.
Resumo:
One of the most disputable matters in the theory of finance has been the theory of capital structure. The seminal contributions of Modigliani and Miller (1958, 1963) gave rise to a multitude of studies and debates. Since the initial spark, the financial literature has offered two competing theories of financing decision: the trade-off theory and the pecking order theory. The trade-off theory suggests that firms have an optimal capital structure balancing the benefits and costs of debt. The pecking order theory approaches the firm capital structure from information asymmetry perspective and assumes a hierarchy of financing, with firms using first internal funds, followed by debt and as a last resort equity. This thesis analyses the trade-off and pecking order theories and their predictions on a panel data consisting 78 Finnish firms listed on the OMX Helsinki stock exchange. Estimations are performed for the period 2003–2012. The data is collected from Datastream system and consists of financial statement data. A number of capital structure characteristics are identified: firm size, profitability, firm growth opportunities, risk, asset tangibility and taxes, speed of adjustment and financial deficit. A regression analysis is used to examine the effects of the firm characteristics on capitals structure. The regression models were formed based on the relevant theories. The general capital structure model is estimated with fixed effects estimator. Additionally, dynamic models play an important role in several areas of corporate finance, but with the combination of fixed effects and lagged dependent variables the model estimation is more complicated. A dynamic partial adjustment model is estimated using Arellano and Bond (1991) first-differencing generalized method of moments, the ordinary least squares and fixed effects estimators. The results for Finnish listed firms show support for the predictions of profitability, firm size and non-debt tax shields. However, no conclusive support for the pecking-order theory is found. However, the effect of pecking order cannot be fully ignored and it is concluded that instead of being substitutes the trade-off and pecking order theory appear to complement each other. For the partial adjustment model the results show that Finnish listed firms adjust towards their target capital structure with a speed of 29% a year using book debt ratio.
Resumo:
The determination of the most appropriate procurement method for capital works projects is a challenging task for the Department of Housing and Works (DHW) and other Western Australian State Government Agencies because of the array of assessment criteria that are considered and the procurement methods that are available. A number of different procurement systems can be used to deliver capital works projects such a traditional, design and construct and management. Sub-classifications of these systems have proliferated and continue to emerge in response to market demands. The selection of an inappropriate procurement method may lead to undesirable project outcomes. To facilitate DHW in selecting an appropriate procurement method for its capital works projects, a six step procurement method selection process is presented. The characteristics of the most common forms of procurement method used in Australia are presented. Case studies where procurement methods have been used for specific types of capital works in Western Australia are offered to provide a reference point and learning opportunity for procurement method selection.
Resumo:
Despite the increasing significance of the construction industry as an emerging sector of the Australian economy, there is inadequate research performed on construction design firms in terms of theoretical and empirical foundations. Although past research has identified the barriers and success factors for firm market entry, evidence suggests that to date no research has explicitly explored the sustainability of construction design firms in international markets. SMEs and their approach to firm internationalisation differ significantly from large manufacturing firms and a vast majority of construction design firms operate as SMEs. This paper develops a sustainable business model for construction design SMEs, which rely upon the development of clear Client Following (CF) versus Market Seeking (MS) strategies to support internal firm strategic and operational management. The understanding of these strategies is vital as the application of either will shape the design management approach of firms, which would in turn impact on the sustainability of these firms in foreign markets. Long-term sustainability of firms in international markets relies heavily upon client satisfaction. Client and project team participants’ communication during various design processes has often been problematic and the added difficulty of communicating across international boundaries further compounds the problem of capturing and maintaining client’s requirements. Therefore this paper develops a model for economic sustainability of Australian construction design firms working in international markets by exploring factors that affect client satisfaction across international boundaries, through the development of business performance indicators. These include not only the critical financial capital but also other ‘softer’ indicators, namely: social, cultural and intellectual capital. These act as a firm’s measure of success and the acquisition of this type of capital will provide significant advantages to firms’ success, hence sustainability in international markets.
Resumo:
The need to “reduce red tape” and regulatory inconsistencies is a desirable outcome (OECD 1997) for developed countries. The costs normally associated with regulatory regimes are compliance costs and direct charges. Geiger and Hoffman (1998) have noted that the extent of regulation in an industry tends to be negatively associated with firm performance. Typically, approaches to estimation of the cost of regulations examine direct costs, such as fees and charges, together with indirect costs, such as compliance costs. However, in a fragmented system, such as Australia, costs can also be incurred due to procedural delays, either by government, or by industry having to adapt documentation for different spheres of government; lack of predictable outcomes, with variations occurring between spheres of government and sometimes within the same government agency; and lost business opportunities, with delays and red tape preventing realisation of business opportunities (OECD 1997). In this submission these costs are termed adaptation costs. The adaptation costs of complying with variations in regulations between the states has been estimated by the Building Product Innovation Council (2003) as being up to $600 million per annum for building product manufacturers alone. Productivity gains from increased harmonisation of the regulatory system have been estimated in the hundreds of millions of dollars (ABCB 2003). This argument is supported by international research which found that increasing the harmonisation of legislation in a federal system of government reduces what we have termed adaptation costs (OECD 2001). Research reports into the construction industry in Australia have likewise argued that improved consistency in the regulatory environment could lead to improvements in innovation (PriceWaterhouseCoopers 2002), and that research into this area should be given high priority (Hampson & Brandon 2004). The opinion of industry in Australia has consistently held that the current regulatory environment inhibits innovation (Manley 2004). As a first step in advancing improvements to the current situation, a summary of the current costs experienced by industry needs to be articulated. This executive summary seeks to outline these costs in the hope that the Productivity Commission would be able to identify the best tools to quantify the actual costs to industry.
Resumo:
PPP (Public Private Partnerships) is a new operation mode of infrastructure projects, which usually undergo long periods and have various kinds of risks in technology, market, politics, policy, finance, society, natural conditions and cooperation. So the government and the private agency should establish the risk-sharing mechanism to ensure the successful implementation of the project. As an important branch of the new institutional economics, transaction cost economics and its analysis method have been proved to be beneficial to the proper allocation of risks between the two parts in PPP projects and the improvement of operation efficiency of PPP risk-sharing mechanism. This paper analyzed the transaction cost of the projects risk-sharing method and the both risk carriers. It pointed out that the risk-sharing method of PPP projects not only reflected the spirit of cooperation between public sector and private agency, but also minimized the total transaction cost of the risk sharing mechanism itself. Meanwhile, the risk takers had to strike a balance between the beforehand cost and the afterwards cost so as to control the cost of risk management. The paper finally suggested three ways which might be useful to reduce the transaction cost: to choose appropriate type of contract of PPP risk-sharing mechanism, to prevent information asymmetry and to establish mutual trust between the two participants.
Resumo:
This chapter focuses on the major social ruptures and developments that are most significant in the historical emergence and development of Capital and, more precisely, on those ruptures that highlight the most significant ethical issues upon which Capital, as a form of social organisation, is premised. Capital is most often viewed as a system of relationships between “things”, like land, labour, machinery, money, and so on. But this is to obscure the human relationships within which Capital flourishes.
Resumo:
he purpose of this study was to evaluate the comparative cost of treating alcohol dependence with either cognitive behavioral therapy (CBT) alone or CBT combined with naltrexone (CBT+naltrexone). Two hundred ninety-eight outpatients dependent on alcohol who were consecutively treated for alcohol dependence participated in this study. One hundred seven (36%) patients received adjunctive pharmacotherapy (CBT+naltrexone). The Drug Abuse Treatment Cost Analysis Program was used to estimate treatment costs. Adjunctive pharmacotherapy (CBT+naltrexone) introduced an additional treatment cost and was 54% more expensive than CBT alone. When treatment abstinence rates (36.1% CBT; 62.6% CBT+naltrexone) were applied to cost effectiveness ratios, CBT+naltrexone demonstrated an advantage over CBT alone. There were no differences between groups on a preference-based health measure (SF-6D). In this treatment center, to achieve 100 abstainers over a 12-week program, 280 patients require CBT compared with 160 CBT+naltrexone. The dominant choice was CBT+naltrexone based on modest economic advantages and significant efficiencies in the numbers needed to treat.
Resumo:
This paper describes the optimization of conductor size and the voltage regulator location & magnitude of long rural distribution lines. The optimization minimizes the lifetime cost of the lines, including capital costs and losses while observing voltage drop and operational constraints using a Genetic Algorithm (GA). The GA optimization is applied to a real Single Wire Earth Return (SWER) network in regional Queensland and results are presented.