950 resultados para BAND-GAPS


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Affordances have recently been proposed as a guiding principle in perception–action research in sport (Fajen, Riley, & Turvey, 2009). In the present study, perception of the ’passability’ affordance of a gap between two approaching defenders in rugby is explored. A simplified rugby gap closure scenario was created using immersive, interactive virtual reality technology where 14 novice participants (attacker) judged the passability of the gap between two virtual defenders via a perceptual judgment (button press) task. The scenario was modeled according to tau theory (Lee, 1976) and a psychophysical function was fitted to the response data. Results revealed that a tau-based informational quantity could account for 82% of the variance in the data. Findings suggest that the passability affordance in this case, is defined by this variable and participants were able to use it in order to inform prospective judgments as to passability. These findings contribute to our understanding of affordances and how they may be defined in this particular sporting scenario; however, some limitations regarding methodology, such as decoupling perception and action are also acknowledged.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A simple V-band radio IQ receiver architecture based around a six-port monolithic microwave integrated circuit (MMIC) is presented. The receiver assembly is designed to cover the 57-65 GHz broadband wireless communication system frequency allocation. The receiver that has an integral 10 dB microstrip antenna consumes 120 mW of dc power and occupies an area of 23 mm x 16 mm. The receiver can be used in heterodyne or in homodyne mode and has the capacity to demodulate quadrature amplitude modulation (QAM), binary phase shift keying (BPSK)/quadrature phase shift keying (QPSK)/offset quadrature phase shift keying (OQPSK). At 60 GHz the receiver can operate over 10 m range for transmitter effective isotropic radiated power (EIRP) of 20 dBm.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the course of building the 7000 year Belfast long oak chronology a series of depletion problems were encountered. These problems were overcome by 1984 when the completion of the long chronology was announced. The solution to the bridging of the various ‘gaps’ in the Irish chronology lay in the use of long sections of oak chronology from Britain. Now that a quarter of a century has elapsed and large numbers of additional oak samples, and site assemblages, have been accumulated it seems reasonable to review the ‘gaps’ in order to see if the Irish chronology could now be constructed without the use of British material. That is, are the depletion periods in the Irish chronology still evident, and if so, what might they imply about past conditions and human populations? The perhaps surprising conclusion is that the original depletions are still evident after 25 years of quasi-random sampling by archaeologists and palaeoecologists throughout Ireland.

Relevância:

20.00% 20.00%

Publicador: