922 resultados para work system
Resumo:
In Sweden, 90% of the solar heating systems are solar domestic hot water and heating systems (SDHW&H), so called combisystems. These generally supply most of the domestic hot water needs during the summer and have enough capacity to supply some energy to the heating system during spring and autumn. This paper describes a standard Swedish combisystem and how the output from it varies with heating load, climate within Sweden, and how it can be increased with improved system design. A base case is defined using the standard combi- system, a modern Swedish single family house and the climate of Stockholm. Using the simulation program Trnsys, parametric studies have been performed on the base case and improved system designs. The solar fraction could be increased from 17.1% for the base case to 22.6% for the best system design, given the same system size, collector type and load. A short analysis of the costs of changed system design is given, showing that payback times for additional investment are from 5-8 years. Measurements on system components in the laboratory have been used to verify the simulation models used. More work is being carried out in order to find even better system designs, and further improvements in system performance are expected.
Resumo:
An international standard, ISO/DP 9459-4 has been proposed to establish a uniform standard of quality for small, factory-made solar heating systerns. In this proposal, system components are tested separatelyand total system performance is calculated using system simulations based on component model parameter values validated using the results from the component tests. Another approach is to test the whole system in operation under representative conditions, where the results can be used as a measure of the general system performance. The advantage of system testing of this form is that it is not dependent on simulations and the possible inaccuracies of the models. Its disadvantage is that it is restricted to the boundary conditions for the test. Component testing and system simulation is flexible, but requires an accurate and reliable simulation model.The heat store is a key component conceming system performance. Thus, this work focuses on the storage system consisting store, electrical auxiliary heater, heat exchangers and tempering valve. Four different storage system configurations with a volume of 750 litre were tested in an indoor system test using a six -day test sequence. A store component test and system simulation was carried out on one of the four configurations, applying the proposed standard for stores, ISO/DP 9459-4A. Three newly developed test sequences for intemalload side heat exchangers, not in the proposed ISO standard, were also carried out. The MULTIPORT store model was used for this work. This paper discusses the results of the indoor system test, the store component test, the validation of the store model parameter values and the system simulations.
Resumo:
Participation as observer at the meeting of Task 14 of IEA's Solar Heating and Cooling Projects held in Hameln, Germany has led to greater understanding of interesting developments underway in several countries. This will be of use during the development of small scale systems suitable for Swedish conditions. A summary of the work carried out by the working groups within Task 14 is given, with emphasis on the Domestic Hot Water group. Experiences of low-flow systems from several countries are related, and the conclusion is drawn that the maximum theoretical possible increase in performance of 20% has not been achieved due to poor heat exchangers and poor stratification in the storage tanks. Positive developments in connecting tubes and pumps is noted. Further participation as observer in Task 14 meetings is desired, and is looked on favourably by the members of the group. Another conclusion is that SERC should carry on with work on Swedish storage tanks, with emphasis on better stratification and heat exchangers, and possible modelling of system components. Finally a German Do-it-Vourself kit is described and judged in comparison with prefabricated models and Swedish Do-it-Yourself kits.
Resumo:
The main aim of this project is to develop an ESES lab on a full scale system. The solar combisystem used is available most of the time and is only used twice a year to carry out some technical courses. At the moment, there are no other laboratories about combisystems. The experiments were designed in a way to use the system to the most in order to help the students apply the theoretical knowledge in the solar thermal course as well as make them more familiar with solar systems components. The method adopted to reach this aim is to carry out several test sequences on the system, in order to help formulating at the end some educating experiments. A few tests were carried out at the beginning of the project just for the sake of understanding the system and figuring out if any additional measuring equipment is required. The level of these tests sequences was varying from a simple energy draw off or collector loop controller respond tests to more complicated tests, such as the use of the ‘collector’ heater to simulate the solar collector effect on the system. The tests results were compared and verified with the theoretical data wherever relevant. The results of the experiment about the use of the ‘collector’ heater instead of the collector were positively acceptable. Finally, the Lab guide was developed based on the results of these experiments and also the experience gotten while conducting them. The lab work covers the theories related to solar systems in general and combisystems in particular.
Resumo:
The work presented in this thesis concerns the dimensioning of an Energy Storage System (ESS) which will be used as an energy buffer for a grid-connected PV plant. This ESS should help managing the PV plant to inject electricity into the grid according to the requirements of the grid System Operator. It is desired to obtain a final production not below 1300kWh/kWp with a maximum ESS budget of 0.9€/Wp. The PV plant will be sited in Martinique Island and connected to the main grid. This grid is a small one where the perturbations due clouds in the PV generation are not negligible anymore. A software simulation tool, incorporating a model for the PV-plant production, the ESS and the required injection pattern of electricity into the grid has been developed in MS Excel. This tool has been used to optimize the relevant parameters defining the ESS so that the feed-in of electricity into the grid can be controlled to fulfill the conditions given by the System Operator. The inputs used for this simulation tool are, besides the conditions given by the System Operator on the allowed injection pattern, the production data from a similar PV-plant in a close-by location, and variables for defining the ESS. The PV production data used is from a site with similar climate and weather conditions as for the site on the Martinique Island and hence gives information on the short term insolation variations as well as expected annual electricity production. The ESS capacity and the injected electric energy will be the main figures to compare while doing an economic study of the whole plant. Hence, the Net Present Value, Benefit to Cost method and Pay-back period studies are carried on as dependent of the ESS capacity. The conclusion of this work is that it is possible to obtain the requested injection pattern by using an ESS. The design of the ESS can be made within an acceptable budget. The capacity of ESS to link with the PV system depends on the priorities of the final output characteristics, and it also depends on which economic parameter that is chosen as a priority.
Resumo:
Projektet omfattade en jämförelsestudie avseende stomsystem. Studien undersökte ramverk och fackverk/balk/pelar-system och genomfördes självständigt med stöttning av Ramböll AB´s kontor i Falun. Syftet var främst att undersöka vilka skillnader det finns mellan tvåledsramar och fackverk/balk/pelar-system för lätta hallbyggnader och försöka få klarhet i varför fackverk/balk/pelar-system är det dominerande systemet i Sverige eftersom övriga Europa har tagit en annan utveckling och domineras av tvåledsramar. Studien undersöker skillnaderna mellan systemen i en hallbyggnad med förutbestämda mått i stål.Inledningsvis gjordes en litteraturstudie för att få en bredare bakgrund av systemen och en bättre förståelse om förutsättningarna för varje system. Efter litteraturstudien kunde sedan ett typhus och beräkningsunderlag för jämförelsestudien tas fram. Även en enkätstudie gjordes med syftet att skapa en tydlig bild av vilket stomsystem konstruktörer i Sverige oftast väljer och varför. Resultatet av studien visade att tvåledsramar ger en ökad kostnad jämfört med fackverk/balk/pelar-system i materialåtgång och framställning samt att beräkningarna blir mer komplicerade. Skulle fortsatta studier göras med dessa system i byggnader med andra mått skulle det kanske gå att få fram speciella mått på byggnader där kostnaden för tvåledsramar blir densamma som för fackverk/balk/pelar-system och därför är ett likvärdigt alternativ som stomsystem.En viktig slutsats från projektet är att tvåledsramar används mycket mer sällan än fackverk/balk/pelar-system som stomsystem i lätta hallbyggnader i Sverige på grund av att kostnaderna blir mycket högre med tvåledsramar och att det är ett mer komplicerat system i beräkningsarbetet. De viktigaste slutsatserna från jämförelsestudien går att sammafatta som följande: Tvåledsramar är dyrare att använda. Tvåledsramar är ett mer komplicerat system beräkningsmässigt. Traditionen av att använda tvåledsramar finns inte och därför används inte systemet.
Resumo:
A decision support system (DSS) was implemented based on a fuzzy logic inference system (FIS) to provide assistance in dose alteration of Duodopa infusion in patients with advanced Parkinson’s disease, using data from motor state assessments and dosage. Three-tier architecture with an object oriented approach was used. The DSS has a web enabled graphical user interface that presents alerts indicating non optimal dosage and states, new recommendations, namely typical advice with typical dose and statistical measurements. One data set was used for design and tuning of the FIS and another data set was used for evaluating performance compared with actual given dose. Overall goodness-of-fit for the new patients (design data) was 0.65 and for the ongoing patients (evaluation data) 0.98. User evaluation is now ongoing. The system could work as an assistant to clinical staff for Duodopa treatment in advanced Parkinson’s disease.
Resumo:
Objective: For the evaluation of the energetic performance of combined renewable heating systems that supply space heat and domestic hot water for single family houses, dynamic behaviour, component interactions, and control of the system play a crucial role and should be included in test methods. Methods: New dynamic whole system test methods were developed based on “hardware in the loop” concepts. Three similar approaches are described and their differences are discussed. The methods were applied for testing solar thermal systems in combination with fossil fuel boilers (heating oil and natural gas), biomass boilers, and/or heat pumps. Results: All three methods were able to show the performance of combined heating systems under transient operating conditions. The methods often detected unexpected behaviour of the tested system that cannot be detected based on steady state performance tests that are usually applied to single components. Conclusion: Further work will be needed to harmonize the different test methods in order to reach comparable results between the different laboratories. Practice implications: A harmonized approach for whole system tests may lead to new test standards and improve the accuracy of performance prediction as well as reduce the need for field tests.
Resumo:
Dynamic system test methods for heating systems were developed and applied by the institutes SERC and SP from Sweden, INES from France and SPF from Switzerland already before the MacSheep project started. These test methods followed the same principle: a complete heating system – including heat generators, storage, control etc., is installed on the test rig; the test rig software and hardware simulates and emulates the heat load for space heating and domestic hot water of a single family house, while the unit under test has to act autonomously to cover the heat demand during a representative test cycle. Within the work package 2 of the MacSheep project these similar – but different – test methods were harmonized and improved. The work undertaken includes: • Harmonization of the physical boundaries of the unit under test. • Harmonization of the boundary conditions of climate and load. • Definition of an approach to reach identical space heat load in combination with an autonomous control of the space heat distribution by the unit under test. • Derivation and validation of new six day and a twelve day test profiles for direct extrapolation of test results. The new harmonized test method combines the advantages of the different methods that existed before the MacSheep project. The new method is a benchmark test, which means that the load for space heating and domestic hot water preparation will be identical for all tested systems, and that the result is representative for the performance of the system over a whole year. Thus, no modelling and simulation of the tested system is needed in order to obtain the benchmark results for a yearly cycle. The method is thus also applicable to products for which simulation models are not available yet. Some of the advantages of the new whole system test method and performance rating compared to the testing and energy rating of single components are: • Interaction between the different components of a heating system, e.g. storage, solar collector circuit, heat pump, control, etc. are included and evaluated in this test. • Dynamic effects are included and influence the result just as they influence the annual performance in the field. • Heat losses are influencing the results in a more realistic way, since they are evaluated under "real installed" and representative part-load conditions rather than under single component steady state conditions. The described method is also suited for the development process of new systems, where it replaces time-consuming and costly field testing with the advantage of a higher accuracy of the measured data (compared to the typically used measurement equipment in field tests) and identical, thus comparable boundary conditions. Thus, the method can be used for system optimization in the test bench under realistic operative conditions, i.e. under relevant operating environment in the lab. This report describes the physical boundaries of the tested systems, as well as the test procedures and the requirements for both the unit under test and the test facility. The new six day and twelve day test profiles are also described as are the validation results.
Resumo:
Background: The gap between what is known and what is practiced results in health service users not benefitting from advances in healthcare, and in unnecessary costs. A supportive context is considered a key element for successful implementation of evidence-based practices (EBP). There were no tools available for the systematic mapping of aspects of organizational context influencing the implementation of EBPs in low- and middle-income countries (LMICs). Thus, this project aimed to develop and psychometrically validate a tool for this purpose. Methods: The development of the Context Assessment for Community Health (COACH) tool was premised on the context dimension in the Promoting Action on Research Implementation in Health Services framework, and is a derivative product of the Alberta Context Tool. Its development was undertaken in Bangladesh, Vietnam, Uganda, South Africa and Nicaragua in six phases: (1) defining dimensions and draft tool development, (2) content validity amongst in-country expert panels, (3) content validity amongst international experts, (4) response process validity, (5) translation and (6) evaluation of psychometric properties amongst 690 health workers in the five countries. Results: The tool was validated for use amongst physicians, nurse/midwives and community health workers. The six phases of development resulted in a good fit between the theoretical dimensions of the COACH tool and its psychometric properties. The tool has 49 items measuring eight aspects of context: Resources, Community engagement, Commitment to work, Informal payment, Leadership, Work culture, Monitoring services for action and Sources of knowledge. Conclusions: Aspects of organizational context that were identified as influencing the implementation of EBPs in high-income settings were also found to be relevant in LMICs. However, there were additional aspects of context of relevance in LMICs specifically Resources, Community engagement, Commitment to work and Informal payment. Use of the COACH tool will allow for systematic description of the local healthcare context prior implementing healthcare interventions to allow for tailoring implementation strategies or as part of the evaluation of implementing healthcare interventions and thus allow for deeper insights into the process of implementing EBPs in LMICs.
Resumo:
Recent work has begun exploring the characterization and utilization of provenance in systems based on the Service Oriented Architecture (such as Web Services and Grid based environments). One of the salient issues related to provenance use within any given system is its security. In a broad sense, security requirements arise within any data archival and retrieval system, however provenance presents unique requirements of its own. These requirements are additionally dependent on the architectural and environmental context that a provenance system operates in. We seek to analyze the security considerations pertaining to a Service Oriented Architecture based provenance system. Towards this end, we describe the components of such a system and illustrate the security considerations that arise within it. Concurrently, we outline possible approaches to address them.
Resumo:
There are many viruses that are able to infect the alimentary tract of man. Little is known, however, about the mechanism of infection itself or the pathophysiology of the gut during infection. 'The research reported here is concerned with the differences in susceptibility among suckling mice of various ages inoculated by the intraperitoneal and intragastric routes. Since the normal mode of entry of many viruses to the gut is via the oral route, Coxsackievirus B5, a human enterovirus which does attack this way, was utilized. It is a non-tumor producing RNA virus that has been shown to act similarly in the mouse and human. The virus was pooled in HeLa cell cultures and titered by a plaquing assay in the same cell cultures. CD-l mice, 10, 14, 18, and 22 days old , were infected either orally or intraperitoneally with 5.0 x 10^10 (10 day old animals) and 1.0 x10^9 plaque forming units per animal. Dissections were done at 1 and 3 days post infection with samples of the blood, heart, liver, and gut being taken from each animal. Each sample was titered individually and the data presented as an average of six samples. As a result of previous work, it is known that the gut of a newborn mouse isn't able to decrease the concentration of the infecting dose and therefore provides no defense against an enteric infection with Coxsackievirus B5. In contrat, mature mice are able to reduce the amount of viral dissemination across the gut as well as inhibit replication after absorption has occurred. The results of this study indicate that there is a double barrier system developing in suckling mice that is involved with and directly related to the gastrointestinal tract The first part of this defense is the inhibition of penetration of virus across the gut when the primary site of' infection is the intestinal mucosa. This mechanism develops sometime around 20 to 22 days after birth. At about 16-18 days of age, suckling mice that were challenged intragastrically are able to stop active replication and initiate clearance of virus from the systemic circulation. There are many factors that might contribute to the marked decrease in susceptibility with age of suckling mice. Some of these or possibly a combination of these factors might explain the defense mechanisms described above, but to date, the chemistry or mechanical functioning of the gastrointestinal barrier to enteric viral infection is unknown.
Resumo:
An underwater gas pipeline is the portion of the pipeline that crosses a river beneath its bottom. Underwater gas pipelines are subject to increasing dangers as time goes by. An accident at an underwater gas pipeline can lead to technological and environmental disaster on the scale of an entire region. Therefore, timely troubleshooting of all underwater gas pipelines in order to prevent any potential accidents will remain a pressing task for the industry. The most important aspect of resolving this challenge is the quality of the automated system in question. Now the industry doesn't have any automated system that fully meets the needs of the experts working in the field maintaining underwater gas pipelines. Principle Aim of this Research: This work aims to develop a new system of automated monitoring which would simplify the process of evaluating the technical condition and decision making on planning and preventive maintenance and repair work on the underwater gas pipeline. Objectives: Creation a shared model for a new, automated system via IDEF3; Development of a new database system which would store all information about underwater gas pipelines; Development a new application that works with database servers, and provides an explanation of the results obtained from the server; Calculation of the values MTBF for specified pipelines based on quantitative data obtained from tests of this system. Conclusion: The new, automated system PodvodGazExpert has been developed for timely and qualitative determination of the physical conditions of underwater gas pipeline; The basis of the mathematical analysis of this new, automated system uses principal component analysis method; The process of determining the physical condition of an underwater gas pipeline with this new, automated system increases the MTBF by a factor of 8.18 above the existing system used today in the industry.
Resumo:
In the last years the number of industrial applications for Augmented Reality (AR) and Virtual Reality (VR) environments has significantly increased. Optical tracking systems are an important component of AR/VR environments. In this work, a low cost optical tracking system with adequate attributes for professional use is proposed. The system works in infrared spectral region to reduce optical noise. A highspeed camera, equipped with daylight blocking filter and infrared flash strobes, transfers uncompressed grayscale images to a regular PC, where image pre-processing software and the PTrack tracking algorithm recognize a set of retro-reflective markers and extract its 3D position and orientation. Included in this work is a comprehensive research on image pre-processing and tracking algorithms. A testbed was built to perform accuracy and precision tests. Results show that the system reaches accuracy and precision levels slightly worse than but still comparable to professional systems. Due to its modularity, the system can be expanded by using several one-camera tracking modules linked by a sensor fusion algorithm, in order to obtain a larger working range. A setup with two modules was built and tested, resulting in performance similar to the stand-alone configuration.
Resumo:
A model of overlapping generations in continuous time is composed. IndividuaIs pass through two distinct time periods during their life times. During the first period, they work, save and have a death probability equal to zero. During the second, from the periods T after birth, their probability of death changes to p and then they retire. Capital stock and the stationary state in come are calculated for two situations: in the first, people live from their accumulated capital after retirementj in the second, they live from a state transfer payment through income taxo To simplify matters, in this preliminary version, it is supposed that there is no population growth and that the instantaneous elasticity substitution of consumption is unitary.