743 resultados para research capacity building


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The exchange of design models in the design and construction industry is evolving away from 2-dimensional computer-aided design (CAD) and paper towards semantically-rich 3-dimensional digital models. This approach, known as Building Information Modelling (BIM), is anticipated to become the primary means of information exchange between the various parties involved in construction projects. From a technical perspective, the domain represents an interesting study in model-based interoperability, since the models are large and complex, and the industry is one in which collaboration is a vital part of business. In this paper, we present our experiences with issues of model-based interoperability in exchanging building information models between various tools, and in implementing tools which consume BIM models, particularly using the industry standard IFC data modelling format. We report on the successes and challenges in these endeavours, as the industry endeavours to move further towards fully digitised information exchange.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project discusses a component of the research study conducted to provide construction organizations with a generic benchmarking framework to assess their extent of information communication technology (ICT) adoption for building project management processes. It defines benchmarking and discusses objectives of the required benchmarking framework and development of the framework. The study focuses on ICT adoption by small and medium enterprises (SMEs) in the construction industry and with respect to SMEs it is important to understand processes, their indicators, and measures in the local context. Structure of the suggested benchmarking framework has been derived after extensive literature survey and a questionnaire survey conducted in the Indian construction industry. The suggested benchmarking process is an iterative process divided into four stages. It can be implemented at organization and industry levels for rating the construction organizations for ICT adoption and performance measurement. The framework has a generic structure and can be generalized and applied for other countries with due considerations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose - Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach - This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings - SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are inter-related and their effect cannot be maximized in isolation. Originality/value - The results provide direction to building project managements for strategically adopting the effective use of ICT within their organisations and for BPM general.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research uses confirmatory factor analysis and structural equation modelling to examine how organizational size - made up of four dimensions - control, resources, trust and complexity - impacts on utilization of industry-led supply chain innovation capacity in a traditional agribusiness industry, the Australian beef industry. It confirms small business rather than larger business accords greater importance to exploiting supply chain dynamic capabilities, particularly in relation to utilizing industry –led supply chain innovation capacity. For small business in Australian beef supply chains, being agile and able to adapt and align their business practices with supply chain partners is integral to ensuring these businesses remain relevant and competitive in this market. In theoretical terms this is supported by authors in the dynamic capabilities literature as they argue these types of capabilities enable organizations to innovate faster (or better), often leading to the creation of newer sources of competitive advantage.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Over the years, public health in relation to Australian Aboriginal people has involved many individuals and groups including health professionals, governments, politicians, special interest groups and corporate organisations. Since colonisation commenced until the1980s, public health relating to Aboriginal and Torres Strait Islander people was not necessarily in the best interests of Aboriginal and Torres Strait Islander people, but rather in the interests of the non-Aboriginal population. The attention that was paid focussed more generally around the subject of reproduction and issues of prostitution, exploitation, abuse and venereal diseases (Kidd, 1997). Since the late 1980s there has been a shift in the broader public health agenda (see Baum, 1998) along with public health in relation to Aboriginal and Torres Strait Islander people (NHMRC, 2003). This has been coupled with increasing calls to develop appropriate tertiary curriculum and to educate, train, and employ more Aboriginal and Torres Strait Islander and non-Aboriginal people in public health (Anderson et al., 2004; Genat, 2007; PHERP, 2008a, 2008b). Aboriginal and Torres Strait Islander people have been engaged in public health in ways in which they are in a position to influence the public health agenda (Anderson 2004; 2008; Anderson et al., 2004; NATSIHC, 2003). There have been numerous projects, programs and strategies that have sought to develop the Aboriginal and Torres Strait Islander Public Health workforce (AHMAC, 2002; Oldenburg et al., 2005; SCATSIH, 2002). In recent times the Aboriginal community controlled health sector has joined forces with other peak bodies and governments to find solutions and strategies to improve the health outcomes of Aboriginal and Torres Strait Islander peoples (NACCHO & Oxfam, 2007). This case study chapter will not address these broader activities. Instead it will explore the activities and roles of staff within the Public Health and Research Unit (PHRU) at the Victorian Aboriginal Community Controlled Health Organisation (VACCHO). It will focus on their experiences with education institutions, their work in public health and their thoughts on gaps and where improvements can be made in public health, research and education. What will be demonstrated is the diversity of education qualifications and experience. What will also be reflected is how people work within public health on a daily basis to enact change for equity in health and contribute to the improvement of future health outcomes of the Victorian Aboriginal community.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background Research involving incapacitated persons with dementia entails complex scientific, legal, and ethical issues, making traditional surveys of layperson views on the ethics of such research challenging. We therefore assessed the impact of democratic deliberation (DD), involving balanced, detailed education and peer deliberation, on the views of those responsible for persons with dementia. Methods One hundred and seventy-eight community-recruited caregivers or primary decision-makers for persons with dementia were randomly assigned to either an all-day DD session group or a control group. Educational materials used for the DD session were vetted for balance and accuracy by an interdisciplinary advisory panel. We assessed the acceptability of family-surrogate consent for dementia research (“surrogate-based research”) from a societal policy perspective as well as from the more personal perspectives of deciding for a loved one or for oneself (surrogate and self-perspectives), assessed at baseline, immediately post-DD session, and 1 month after DD date, for four research scenarios of varying risk-benefit profiles. Results At baseline, a majority in both the DD and control groups supported a policy of family consent for dementia research in all research scenarios. The support for a policy of family consent for surrogate-based research increased in the DD group, but not in the control group. The change in the DD group was maintained 1 month later. In the DD group, there were transient changes in attitudes from surrogate or self-perspectives. In the control group, there were no changes from baseline in attitude toward surrogate consent from any perspective. Conclusions Intensive, balanced, and accurate education, along with peer deliberation provided by democratic deliberation, led to a sustained increase in support for a societal policy of family consent in dementia research among those responsible for dementia patients.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In many countries, the main providers for major infrastructure projects are government or public agencies. Public infrastructure projects includes economic and social infrastructure such as transportation, education and health facilities. Most decision-making models for delivery of public infrastructure projects are heavily weighted towards financial/economic factors. In Australia, public participation is an essential instrument in the procurement of infrastructure and development within Australia. This study reviews the public participation, values and interests in the procurement of infrastructure projects in Australia, and identifies the research direction in this research area in order to improve the decision-making models that capture stakeholder social, economical and environmental concerns in infrastructure projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Office building retrofit projects are increasingly more intensified as existing buildings are aging. At the same time, building owners and occupants are looking for environmentally sustainable products. These retrofit projects usually take place in center business district (CBDs) with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors. Despite their large involvement, they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. Few research has been done on their performance of waste management operations. This paper identifies characteristics of on-site waste in office building retrofit projects. It examines the specific requirements for contractors to manage waste in the projects before exploring the existing performance of SMEs. By comparing requirements for SMEs and their potential areas for improvement, a framework is established for performance promotion of SMEs in on-site waste management of office building retrofit projects. The paper will raise the consciousness and commitment of SMEs as sub-contractors to waste management. It also explores ways of supporting SMEs for experience accumulation, performance promotion and project culture establishment towards effective and efficient on-site waste management in the growing sector of office building retrofit and upgrade.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Increased industrialisation has brought to the forefront the susceptibility of concrete columns in both buildings and bridges to vehicle impacts. Accurate vulnerability assessments are crucial in the design process due to possible catastrophic nature of the failures that can cause. This chapter reports on research undertaken to investigate the impact capacity of the columns of low to medium raised building designed according to the Australian standards. Numerical simulation techniques were used in the process and validation was done by using experimental results published in the literature. The investigation thus far has confirmed that vulnerability of typical columns in five story buildings located in urban areas to medium velocity car impacts and hence these columns need to be re-designed or retrofitted. In addition, accuracy of the simplified method presented in EN 1991-1-7 to quantify the impact damage was scrutinised. A simplified concept to assess the damage due to all collisions modes was introduced. The research information will be extended to generate a common data base to assess the vulnerability of columns in urban areas against new generation of vehicles.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper treats the seismic mitigation of medium rise frame-shear wall structures and building facade systems using passive damping devices. The frame shear wall structures have embedded viscoelastic and friction dampers in different configurations and placed in various locations in the structure. Influence of damper type, configuration and location are investigated. Results for tip deflections which provide an overall evaluation of the seismic response of the structure, are determined. Seismic mitigation of building facade systems in which visco-elastic dampers are fitted at the horizontal connections between the facades and the frame, instead of the traditional rigid connections, are also treated. Finite element techniques are used to model and analyse the two structural systems under different earthquake loadings, scaled to the same peak ground acceleration for meaningful comparison of responses. Results demonstrate the feasibility of these techniques for seismic mitigation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The intersection of current arguments about the role of creative industries in economic development, online user-generated content, and the uptake of broadband in economically disadvantaged communities provides the content for this article. From 2006 to 2008 the authors carried out a research project in Ipswich, Queensland involving local creative practitioners and community groups in their development of edgeX, a Web-based platform for content uploads and social networking. The project aimed to explore issues of local identity and community building through online networking, as well as the possibilities for creating pathways from amateur to professional practice in the creative industries through the auspices of the Website. Set against the backdrop of a rapidly changing technological environment that has problematic implications for research projects aiming to build new online platforms, we present several case studies from the project to illustrate the challenges to participation experienced by people with limited access to, and literacy with, the Internet.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Assessment for Learning(AfL) case studies in a North Queensland school highlight the significance of the teacher-student relationship in creating a supportive culture within which students can negotiate new learner identities. AfL practices are school based evaluative practices that occur within the regular flow of teaching and learning with the purpose of informing and improving student learning to enhance learner autonomy. The identity of an autonomous learner is socially negotiated through participation in the community of practice of the class. Underpinned by a sociocultural perspective this research shows how AfL is manifested in action in its complexity and how positive teacher-student interactions can build bridges for students to move towards full participation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This document presents the newly updated strategic directions for strengthening nursing and midwifery services (SDNM) for the period 2011–2015. Complementing and building on the 2002–2008 SDNM, it seeks to provide policymakers, practitioners and other stakeholders at every level with a flexible framework for broad-based, collaborative action to enhance the capacity of nurses and midwives to contribute to: * universal coverage * people-centred health care * policies affecting their practice and working conditions, and the * scaling up of national health systems to meet global goals and targets. The SDNM for 2011–2015 draws on several key World Health Assembly resolutions, and are underpinned by the associated global policy recommendations and codes of practice. (1,2) After two years of extensive research and consultation, a SDNM task force was developed, and a consensus on a range of specific activities revolving around 13 objectives in five interrelated key results areas (KRAs), was achieved: n health system and service strengthening n policy and practice * education, training and career development * workforce management and * partnership. Stakeholders, although free to prioritize certain parts of the framework to meet their own particular needs, are encouraged to adhere to the cornerstone of collaborative action, namely the common goal enshrined in the core SDNM 2011–2015 vision statement: improved health outcomes for individuals, families and communities through the provision of competent, culturally sensitive, evidence-based nursing and midwifery services.