837 resultados para Coal power plant


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The water time constant and mechanical time constant greatly influences the power and speed oscillations of hydro-turbine-generator unit. This paper discusses the turbine power transients in response to different nature and changes in the gate position. The work presented here analyses the characteristics of hydraulic system with an emphasis on changes in the above time constants. The simulation study is based on mathematical first-, second-, third- and fourth-order transfer function models. The study is further extended to identify discrete time-domain models and their characteristic representation without noise and with noise content of 10 & 20 dB signal-to-noise ratio (SNR). The use of self-tuned control approach in minimising the speed deviation under plant parameter changes and disturbances is also discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The bankability of CPV projects is an important issue to pave the way toward a swift and sustained growth in this technology. The bankability of a PV plant is generally addressed through the modeling of its energy yield under a b aseline loss scenario, followed by an on-site measurement campaign aimed at verifying its energetic behavior. The main difference between PV and CPV resides in the proper CPV modules, in particular in the inclusion of optical lements and III-V multijunction cells that are much more sensitive to spectral variations than xSi cells, while the rest of the system behaves in a way that possesses many common points with xSi technology. The modeling of the DC power output of a CPV system thus requires several impo rtant second order parameters to be considered, mainly related to optics, spectral direct solar radiation, wind speed, tracker accuracy and heat dissipation of cells.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Forecasting the AC power output of a PV plant accurately is important both for plant owners and electric system operators. Two main categories of PV modeling are available: the parametric and the nonparametric. In this paper, a methodology using a nonparametric PV model is proposed, using as inputs several forecasts of meteorological variables from a Numerical Weather Forecast model, and actual AC power measurements of PV plants. The methodology was built upon the R environment and uses Quantile Regression Forests as machine learning tool to forecast AC power with a confidence interval. Real data from five PV plants was used to validate the methodology, and results show that daily production is predicted with an absolute cvMBE lower than 1.3%.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Short-term variability in the power generated by large grid-connected photovoltaic (PV) plants can negatively affect power quality and the network reliability. New grid-codes require combining the PV generator with some form of energy storage technology in order to reduce short-term PV power fluctuation. This paper proposes an effective method in order to calculate, for any PV plant size and maximum allowable ramp-rate, the maximum power and the minimum energy storage requirements alike. The general validity of this method is corroborated with extensive simulation exercises performed with real 5-s one year data of 500 kW inverters at the 38.5 MW Amaraleja (Portugal) PV plant and two other PV plants located in Navarra (Spain), at a distance of more than 660 km from Amaraleja.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper the power-frequency control of hydropower plants with long penstocks is addressed. In such configuration the effects of pressure waves cannot be neglected and therefore commonly used criteria for adjustment of PID governors would not be appropriate. A second-order Π model of the turbine-penstock based on a lumped parameter approach is considered. A correction factor is introduced in order to approximate the model frequency response to the continuous case in the frequency interval of interest. Using this model, several criteria are analysed for adjusting the PI governor of a hydropower plant operating in an isolated system. Practical criteria for adjusting the PI governor are given. The results are applied to a real case of a small island where the objective is to achieve a generation 100% renewable (wind and hydro). Frequency control is supposed to be provided exclusively by the hydropower plant. It is verified that the usual criterion for tuning the PI controller of isolated hydro plants gives poor results. However, with the new proposed adjustment, the time response is considerably improved

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El proyecto que se presenta a continuación recoge la adaptación de una Central Térmica de carbón al cumplimiento de la DIRECTIVA 2010/75/UE DEL PARLAMENTO EUROPEO Y DEL CONSEJO de 24 de noviembre de 2010 sobre las emisiones industriales. La Central sobre la que se realiza el proyecto tiene un grupo térmico de carbón suscritico refrigerado por agua, con una potencia a plena carga de 350 MWe y de 190 MWe a mínimo técnico. Genera 1 090 t/h de vapor a 540 °C y 168 kg/cm2 funcionando a plena carga. Actualmente las emisiones de NOx son de 650 mg/m3, (condiciones normales, seco, 6 % O2). El objeto del proyecto es reducir estas emisiones a un valor máximo de 200 mg/m3 en las mismas condiciones. El proyecto analiza detalladamente las condiciones actuales de operación de la instalación en cuanto a combustible utilizado, horas de funcionamiento, condiciones climáticas y producción. Se analiza así mismo, todas las técnicas disponibles en mercado para la reducción del NOx, diferenciando entre medidas primarias (actúan sobre los efectos de formación) y secundarias (limpieza de gases). Las medidas primarias ya están implementadas en la central, por tanto, el proyecto plantea la reducción con medidas secundarias. De las medidas secundarias analizadas se ha seleccionado la instalación de un Reactor de Reducción Selectiva Catalítica (Reactor SCR). Tras un análisis de los diferentes reactores y catalizadores disponibles se ha seleccionado un reactor de configuración High-dust, una disposición de catalizador en 3 capas más 1, cuyos componentes están basados en óxidos metálicos (TiO2, V2O5, WO3) y estructura laminar. Se ha buscado la instalación del reactor para operar a una temperatura inferior a 450 °C. Como agente reductor se ha seleccionado NH3 a una dilución del 24,5 %. El proyecto recoge también el diseño de todo el sistema de almacenamiento, evaporación, dilución e inyección de amoniaco. El resultado del proyecto garantiza una concentración en los gases de salida por la chimenea inferior 180 mg/m3(n) de NOx. La reducción del NOx a los límites establecidos, tienen un coste por MWh neto generado para la central, trabajando 60 % a plena carga y 40 % a mínimo técnico y una amortización de 10 años, de 4,10 €/MWh. ABSTRACT The following project shows the compliance adjustment of a coal-fired power station to the 2010/75/EU Directive of the European Parliament and Council 24th November 2010 on industrial emissions. The project is based on a power station with a subcritical thermal coal unit, cooled with water, with a maximum power of 350 MWe and a technical minimum of 190 MWe. It produces 1 090 t/h of steam at 540 ° C and 168 kg/cm2 operating under full load. Currently, NOx emissions are 650 mg / m3 (normal conditions, dry, 6% O2). The project aims to reduce these emissions to a maximum value of 200 mg / m3 under the same conditions. The project analyses in detail the current operating conditions of the system in terms of fuel used, hours of operation, climatic conditions and production. In addition, it also analyses every available technique of NOx reduction on the market, distinguishing between primary (acting on the effects of formation) and secondary measures (gas cleaning). Primary measures are already implemented in the plant, thus proposing reduction with secondary measures. Among the secondary measures analyzed, it has been selected to install a Selective Catalytic Reduction Reactor (SCR Reactor). Having researched the different reactors and catalysts available, for the reactor has been selected High-dust configuration, an arrangement of catalyst in 3 layers plus 1, whose components are based on metal oxides (TiO2, V2O5, WO3) and laminar structure. The reactor has been sought facility to operate at a temperature below 450 ° C. NH3 diluted to 24,5 % has been selected as reducing agent. The project also includes the design of the entire storage system, evaporation, dilution and ammonia injection. The results of the project ensure a gas concentration in the lower chimney exit below 180 mg / m3(n) NOx. The reduction of NOx to the established limits has a cost per net MWh generated in the plant, working at 60% of full load and at 40% of technical minimum, with an amortization of 10 years, 4,10 € / MWh.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose Concentrating Solar Power (CSP) plants based on parabolic troughs utilize auxiliary fuels (usually natural gas) to facilitate start-up operations, avoid freezing of HTF and increase power output. This practice has a significant effect on the environmental performance of the technology. The aim of this paper is to quantify the sustainability of CSP and to analyse how this is affected by hybridisation with different natural gas (NG) inputs. Methods A complete Life Cycle (LC) inventory was gathered for a commercial wet-cooled 50 MWe CSP plant based on parabolic troughs. A sensitivity analysis was conducted to evaluate the environmental performance of the plant operating with different NG inputs (between 0 and 35% of gross electricity generation). ReCiPe Europe (H) was used as LCA methodology. CML 2 baseline 2000 World and ReCiPe Europe E were used for comparative purposes. Cumulative Energy Demands (CED) and Energy Payback Times (EPT) were also determined for each scenario. Results and discussion Operation of CSP using solar energy only produced the following environmental profile: climate change 26.6 kg CO2 eq/KWh, human toxicity 13.1 kg 1,4-DB eq/KWh, marine ecotoxicity 276 g 1,4-DB eq/KWh, natural land transformation 0.005 m2/KWh, eutrophication 10.1 g P eq/KWh, acidification 166 g SO2 eq/KWh. Most of these impacts are associated with extraction of raw materials and manufacturing of plant components. The utilization NG transformed the environmental profile of the technology, placing increasing weight on impacts related to its operation and maintenance. Significantly higher impacts were observed on categories like climate change (311 kg CO2 eq/MWh when using 35 % NG), natural land transformation, terrestrial acidification and fossil depletion. Despite its fossil nature, the use of NG had a beneficial effect on other impact categories (human and marine toxicity, freshwater eutrophication and natural land transformation) due to the higher electricity output achieved. The overall environmental performance of CSP significantly deteriorated with the use of NG (single score 3.52 pt in solar only operation compared to 36.1 pt when using 35 % NG). Other sustainability parameters like EPT and CED also increased substantially as a result of higher NG inputs. Quasilinear second-degree polynomial relationships were calculated between various environmental performance parameters and NG contributions. Conclusions Energy input from auxiliary NG determines the environmental profile of the CSP plant. Aggregated analysis shows a deleterious effect on the overall environmental performance of the technology as a result of NG utilization. This is due primarily to higher impacts on environmental categories like climate change, natural land transformation, fossil fuel depletion and terrestrial acidification. NG may be used in a more sustainable and cost-effective manner in combined cycle power plants, which achieve higher energy conversion efficiencies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Concentrating Solar Power (CSP) plants typically incorporate one or various auxiliary boilers operating in parallel to the solar field to facilitate start up operations, provide system stability, avoid freezing of heat transfer fluid (HTF) and increase generation capacity. The environmental performance of these plants is highly influenced by the energy input and the type of auxiliary fuel, which in most cases is natural gas (NG). Replacing the NG with biogas or biomethane (BM) in commercial CSP installations is being considered as a means to produce electricity that is fully renewable and free from fossil inputs. Despite their renewable nature, the use of these biofuels also generates environmental impacts that need to be adequately identified and quantified. This paper investigates the environmental performance of a commercial wet-cooled parabolic trough 50 MWe CSP plant in Spain operating according to two strategies: solar-only, with minimum technically viable energy non-solar contribution; and hybrid operation, where 12 % of the electricity derives from auxiliary fuels (as permitted by Spanish legislation). The analysis was based on standard Life Cycle Assessment (LCA) methodology (ISO 14040-14040). The technical viability and the environmental profile of operating the CSP plant with different auxiliary fuels was evaluated, including: NG; biogas from an adjacent plant; and BM withdrawn from the gas network. The effect of using different substrates (biowaste, sewage sludge, grass and a mix of biowaste with animal manure) for the production of the biofuels was also investigated. The results showed that NG is responsible for most of the environmental damage associated with the operation of the plant in hybrid mode. Replacing NG with biogas resulted in a significant improvement of the environmental performance of the installation, primarily due to reduced impact in the following categories: natural land transformation, depletion of fossil resources, and climate change. However, despite the renewable nature of the biofuels, other environmental categories like human toxicity, eutrophication, acidification and marine ecotoxicity scored higher when using biogas and BM.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Pumped storage hydro plants (PSHP) can provide adequate energy storage and frequency regulation capacities in isolated power systems having significant renewable energy resources. Due to its high wind and solar potential, several plans have been developed for La Palma Island in the Canary archipelago, aimed at increasing the penetration of these energy sources. In this paper, the performance of the frequency control of La Palma power system is assessed, when the demand is supplied by the available wind and solar generation with the support of a PSHP which has been predesigned for this purpose. The frequency regulation is provided exclusively by the PSHP. Due to topographic and environmental constraints, this plant has a long tail-race tunnel without a surge tank. In this configuration, the effects of pressure waves cannot be neglected and, therefore, usual recommendations for PID governor tuning provide poor performance. A PI governor tuning criterion is proposed for the hydro plant and compared with other criteria according to several performance indices. Several scenarios considering solar and wind energy penetration have been simulated to check the plant response using the proposed criterion. This tuning of the PI governor maintains La Palma system frequency within grid code requirements.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Vitamin C (l-ascorbic acid; AsA) acts as a potent antioxidant and cellular reductant in plants and animals. AsA has long been known to have many critical physiological roles in plants, yet its biosynthesis is only currently being defined. A pathway for AsA biosynthesis that features GDP-mannose and l-galactose has recently been proposed for plants. We have isolated a collection of AsA-deficient mutants of Arabidopsis thaliana that are valuable tools for testing of an AsA biosynthetic pathway. The best-characterized of these mutants (vtc1) contains ≈25% of wild-type AsA and is defective in AsA biosynthesis. By using a combination of biochemical, molecular, and genetic techniques, we have demonstrated that the VTC1 locus encodes a GDP-mannose pyrophosphorylase (mannose-1-P guanyltransferase). This enzyme provides GDP-mannose, which is used for cell wall carbohydrate biosynthesis and protein glycosylation as well as for AsA biosynthesis. In addition to genetically defining the first locus involved in AsA biosynthesis, this work highlights the power of using traditional mutagenesis techniques coupled with the Arabidopsis Genome Initiative to rapidly clone physiologically important genes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The allometric relationships for plant annualized biomass production (“growth”) rates, different measures of body size (dry weight and length), and photosynthetic biomass (or pigment concentration) per plant (or cell) are reported for multicellular and unicellular plants representing three algal phyla; aquatic ferns; aquatic and terrestrial herbaceous dicots; and arborescent monocots, dicots, and conifers. Annualized rates of growth G scale as the 3/4-power of body mass M over 20 orders of magnitude of M (i.e., G ∝ M3/4); plant body length L (i.e., cell length or plant height) scales, on average, as the 1/4-power of M over 22 orders of magnitude of M (i.e., L ∝ M1/4); and photosynthetic biomass Mp scales as the 3/4-power of nonphotosynthetic biomass Mn (i.e., Mp ∝ Mn3/4). Because these scaling relationships are indifferent to phylogenetic affiliation and habitat, they have far-reaching ecological and evolutionary implications (e.g., net primary productivity is predicted to be largely insensitive to community species composition or geological age).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The outlook for natural gas demand is often considered bright, especially for gas used to generate electricity. This is because gas is the cleanest of all fossil fuels. The carbon intensity of modern gas-fired power stations is less than 50% that of modern coal plants. Moreover, gas-fired units are well-suited to follow rapid swings in supply and demand due to their flexibility. In the future, these balancing tasks will become more and more important given the intermittent character of the supply of wind and solar power. Gas seems to hold out the promise of being a key pillar of the energy transition and the perfect partner of renewables. Given the EU’s long-term climate policy goals, however, there is strong evidence that demand for gas for purposes of power generation peaked as early as 2010.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In 1879 a campus heating plant and coal sheds were built on central campus just east of University Hall. In 1894, a new heating plant was built at the southeast corner of central campus. The University Hall heating plant was used by Buildings and Grounds from 1894-1915. From 1915-1923 the building was used as a fire station. On verso: Photographed in 1887 by A.L. Conton of '89

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Cover title.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Emanuel Celler, chairman.