958 resultados para Management|Environmental management|Civil engineering
Resumo:
The Commonwealth Department of Industry, Science and Resources is identifying best practice case study examples of supply chain management within the building and construction industry to illustrate the concepts, innovations and initiatives that are at work. The projects provide individual enterprises with examples of how to improve their performance, and the competitiveness of the industry as a whole.
Resumo:
China today is experiencing a time when housing is needed more than ever and one approach satisfying this need is by industrialization - a streamlined process aimed at generating profits and promoting energy efficiency in the housing sectors. Although large housing programs have been completed in China, few housing projects have been built in an industrialized manner. One contributing factor is that industrialization is not omnipotent and, just as a coin has two sides, not all the outcomes of industrialization are beneficial. In this paper, a preliminary assessment is made of these two sides - the benefits and hindrances of industrialized housing in China - by literature review and survey. Case studies are used to verify the questionnaire survey results and from which the advantages and disadvantages involved are compared. The findings indicate the need for formulating policies to encourage industrialized housing in China and for well-planned R&D themes to be implemented simultaneously with industry practices in the near future.
Resumo:
The design-build (DB) system is a popular and effective delivery method of construction projects worldwide. After owners decide to procure their projects through the DB system, they may wish to determine the optimal proportion of design to be provided in the DB request for proposals (RFPs), which serve as solicitations for design-builders and describe the scope of work. However, this presents difficulties to DB owners and there is little, if any, systematic research in this area. This paper reports on an empirical study in the USA entailing both an online questionnaire survey and Delphi survey to identify and evaluate the factors influencing owners’ decisions in determining the proportion of design to include in DB RFPs. Eleven factors are identified, i.e. (1) clarity of project scope; (2) applicability of performance specifications; (3) desire for design innovation; (4) site constraints; (5) availability of competent design-builders; (6) project control requirements; (7) user group involvement level; (8) third party requirements; (9) owner experience with DB; (10) project complexity; and (11) schedule constraints. A statistically significant agreement on the eleven factors was also obtained from the (mainly non-owner) Delphi experts. Although some of the experts hold different opinions on how these factors affect the proportion of design, these findings furnish various stakeholders with a better understanding of the delivery process of DB projects and the appropriate provision of project information in DB RFPs. As the result is mainly industry opinion concerning the optimal proportion of design, in addition and for completeness, future studies should be conducted to obtain a big picture of the optimal proportion of design by means of seeking owners’ inputs.
Resumo:
Clients and Design-build (DB) contractors are two key stakeholders in DB projects, and contribute significantly to the successful project performance. This study aims to identify and compare such key competences in the construction market of the PRC. After the survey of available literature and face-to-face interviews, a two-round Delphi questionnaire survey was conducted to identify the key competences of clients and DB contractors in DB projects. Relative importance of these identified competences were ranked and compared. The questionnaire results indicated distinct differences between the key competences of clients and that of contractors. The contractor’s key competences emphasize on DB experience, corporate management capability, building and design expertise, financial capability, enterprise qualification and reputation. While the client’s competences focus on the ability to clearly define the project scope & requirements, financial capacity, contract management ability, adequate staff, effective coordination with DB contractor and similar DB experience. Both clients and DB contractors should clearly understand the competence requirements in DB projects and possess all the necessary competences for the successful outcome of DB projects. The identification of these key competences provides clients and DB contractors with indicators to assess their capabilities before going for the DB option. Furthermore, the comparison of competences for clients and DB contractors will result in better understanding of DB system and improve the communication between these stakeholders.
Resumo:
IT-supported field data management benefits on-site construction management by improving accessibility to the information and promoting efficient communication between project team members. However, most of on-site safety inspections still heavily rely on subjective judgment and manual reporting processes and thus observers’ experiences often determine the quality of risk identification and control. This study aims to develop a methodology to efficiently retrieve safety-related information so that the safety inspectors can easily access to the relevant site safety information for safer decision making. The proposed methodology consists of three stages: (1) development of a comprehensive safety database which contains information of risk factors, accident types, impact of accidents and safety regulations; (2) identification of relationships among different risk factors based on statistical analysis methods; and (3) user-specified information retrieval using data mining techniques for safety management. This paper presents an overall methodology and preliminary results of the first stage research conducted with 101 accident investigation reports.
Resumo:
Australia's airline industry was born on connecting regional communities to major cities, but almost a century later, many regional and remote communities are facing the prospect of losing their air transport services. The focus of this paper is to highlight key issues and concerns surrounding remote, rural and regional airports in Australia using a network governance framework. Contributions are focused towards regional and remote airport managers, decision makers, and policy makers to stimulate further discussion towards retaining regional and remote services to communities.
Resumo:
Purpose – This paper presents findings of a research study aimed at identifying critical sustainability factors for improved implementation of Industrialised Building Systems (IBS). It also highlights the importance of decision support, through the establishment of decision making guidelines, for sustainability deliverables in IBS development. Design/methodology/approach – A broad range of sustainability factors, as perceived by researchers and practitioners, are identified through a comprehensive literature study. A study of the survey and statistical data analysis is conducted to examine the criticality of these sustainability factors in IBS implementation. Findings – 18 sustainability factors are identified as critical to IBS implementation. Their interrelationships and driving forces are explored, which leads to the development of a conceptual model to map these factors for actions or potential solutions. The work provides a sound basis towards a set of decision making guidelines for sustainable IBS implementation. Originality/value – Compared with previous studies that focus on technical or economical aspects, this study extends existing knowledge on construction prefabrication by linking all aspects of sustainability issues with the design process. It also covers industry characteristics of developing countries, as represented by Malaysia’s scenarios.
Resumo:
Design-build (DB) system is well-known to be a popular and effective delivery method of construction work worldwide. It has been demonstrated as superior to the traditional delivery system in regards to time and cost performance. However, it suffers a major flaw, in that the performance of project quality cannot be guaranteed. This paper aims to investigate the underlying factors attributing to the poor quality performance of design-build projects in Queensland. Five major factors were first identified through a comprehensive literature review, which relate to (1) project briefing and scope definition, (2) client’s role and responsibility, (3) procurement selection, (4) contractor’s incentive, and (5) design document quality. A questionnaire survey with 127 DB professionals was conducted to determine how these factors affect various quality criteria, i.e. functional quality, architectural quality, technical quality, workmanship quality, client satisfaction and overall quality. With the architectural quality reduced greatly, the research findings reveal that the DB projects in Queensland have the reduced overall quality compared with traditional projects. The impacts of different factors on the quality performance of DB projects have been closely examined and summarized. The research findings will facilitate project stakeholder’s better understanding of the delivery process of the DB system and provide guidelines to improve the quality performance.
Resumo:
This special issue of the Project Management Journal (PMJ) presents a collection of six of the best papers presented at the International Academy of African Business and Development (IAABD) conference held on May 17–20, 2011, in Edmonton, Alberta, Canada.
Resumo:
In order to promote green building practice in Australia, the Green Building Council of Australia (GBCA) launched the Green Star rating tools for various types of buildings built since 2003. Of these, the Green Star-Education rating tool addresses sustainability issues during the design and construction phrases of education facility development. It covers a number of categories, including Management, Indoor Environment Quality, Energy, Transport, Water, Materials, Land Use & Ecology, Emissions and Innovation. This paper reviews the use of the Green Star system in Australian education facilities construction and the potential challenges associated with Green Star- Education implementation. Score sheets of 34 education projects across Australia that achieved Green Star certification were collected and analysed. The percentage of green star points obtained within each category and sub-category (credits) for each project were analysed to illustrate the achievement of credits. The results show that management-related credits and ecology-related credits are the easiest and most difficult to obtain respectively. The study also indicted that 6 Green Star education projects obtained particularly high percentages in the Innovation category. The investigation of points obtained in each category provides prospective Green Star applicants with insights into credit achievement for future projects.
Resumo:
A Maintenance Test Section Survey (MTSS) was conducted as part of a Peer State Review of the Texas Maintenance Program conducted October 5–7, 2010. The purpose of the MTSS was to conduct a field review of 34 highway test sections and obtain participants’ opinions about pavement, roadside, and maintenance conditions. The goal was to cross reference or benchmark TxDOT’s maintenance practices based on practices used by selected peer states. Representatives from six peer states (California, Georgia, Kansas, Missouri, North Carolina, and Washington) were invited to Austin to attend a 3-day Peer State Review of TxDOT Maintenance Practices Workshop and to participate in a field survey of a number of pre-selected one-mile roadway sections. It should be emphasized that the objective of the survey was not to evaluate and grade or score TxDOT’s road network but rather to determine whether the selected roadway sections met acceptable standards of service as perceived by Directors of Maintenance or senior maintenance managers from the peer states...
Resumo:
In microscopic traffic simulators, the interaction between vehicles is considered. The dynamics of the system then becomes an emergent property of the interaction between its components. Such interactions include lane-changing, car-following behaviours and intersection management. Although, in some cases, such simulators produce realistic prediction, they do not allow for an important aspect of the dynamics, that is, the driver-vehicle interaction. This paper introduces a physically sound vehicle-driver model for realistic microscopic simulation. By building a nanoscopic traffic simulation model that uses steering angle and throttle position as parameters, the model aims to overcome unrealistic acceleration and deceleration values, as found in various microscopic simulation tools. A physics engine calculates the driving force of the vehicle, and the preliminary results presented here, show that, through a realistic driver-vehicle-environment simulator, it becomes possible to model realistic driver and vehicle behaviours in a traffic simulation.
Resumo:
Dhaka, the capital of Bangladesh, is facing severe traffic congestion. Owing to the flaws in past land use and transport planning decisions, uncontrolled population growth and urbanization, Dhaka’s traffic condition is worsening. Road space is widely regarded in the literature as a utility, so a common view of transport economists is that its usage ought to be charged. Road pricing policy has proven to be effective in managing travel demand, in order to reduce traffic congestion from road networks in a number of cities including London, Stockholm and Singapore. Road pricing as an economic mechanism to manage travel demand can be more effective and user-friendly when revenue is hypothecated into supply alternatives such as improvements to the transit system. This research investigates the feasibility of adopting road pricing in Dhaka with respect to a significant Bus Rapid Transit (BRT) project. Because both are very new concepts for the population of Dhaka, public acceptability would be a principal issue driving their success or failure. This paper explores the travel behaviour of workers in Dhaka and public perception toward Road Pricing with regards to work trips- based on worker’s travel behaviour. A revealed preference and stated preference survey has been conducted on sample of workers in Dhaka. They were asked limited demographic questions, their current travel behaviour and at the end they had been given several hypothetical choices of integrated BRT and road pricing to choose from. Key finding from the survey is the objective of integrated road pricing; subsidies Bus rapid Transit by road pricing to get reduced BRT fare; cannot be achieved in Dhaka. This is because most of the respondent stated that they would choose the cheapest option Walk-BRT-Walk, even though this would be more time consuming and uncomfortable as they have to walk from home to BRT station and also from BRT station to home. Proper economic analysis has to be carried out to find out the appropriate fare of BRT and road charge with some incentive for the low income people.
Resumo:
Partnering has drawn attention from both academics and practitioners in the construction industry in the context of construction and facilities management. The past decades have seen a number of articles reporting the application of partnering in construction. The Chinese construction industry is one of the largest industries in the world; however, to the authors’ best knowledge, no project in mainland China has adopted this procurement approach in a formal and systematic manner as yet. This study employed a qualitative approach to investigate the factors that support or impede the implementation of partnering in mainland China. The findings indicate that the partnering practice is feasible in the construction industry of China due to the large demand brought about by China’s strong economic growth and government support. However, the implementation of partnering in the Chinese construction industry is being impeded by the restrictions of the current Chinese regulatory framework and tender evaluation framework, the incompatible features of Chinese culture and the general lack of trust. Six strategies that help to facilitate the implementation of partnering in China have been developed. This study offers a useful reference to implement collaborative contracting models such as partnering in developing countries.
Resumo:
In response to the need to leverage private finance and the lack of competition in some parts of the Australian public sector infrastructure market, the Australian Federal government has demonstrated its desire to attract new sources of in-bound foreign direct investment (FDI) by multinational contractors. This study aims to update progress towards an investigation into the determinants of multinational contractors’ willingness to bid for Australian public sector major road and bridges. This research deploys Dunning’s eclectic theory for the first time in terms of in-bound FDI by multinational contractors into Australia. Elsewhere, the authors have developed Dunning’s principal hypothesis to suit the context of this research and to address a weakness arising in this hypothesis that is based on a nominal (yes or no) approach to the ownership, location and internalisation factors in Dunning's eclectic framework and which fails to speak to the relative explanatory power of these factors. The authors have completed a first stage test of this development of Dunning's hypothesis based on publically available secondary data, in which it was concluded tentatively that the location factor appears to have the greatest explanatory power. This paper aims to present, for the first time, a further and novel development of the operation of Dunning's eclectic paradigm within the context of multinational contracting, as well as a preview of the design and planned analysis of the next empirical stage in this research concerning case studies. Finally, and beyond the theoretical contributions expected, other expected contributions are mentioned concerning research method and practical implications.