873 resultados para Eletric power transmission
Resumo:
In this paper, the dynamic response of a hydro power plant for providing secondary regulation reserve is studied in detail. Special emphasis is given to the elastic water column effects both in the penstock and the tailrace tunnel. For this purpose, a nonlinear model based on the analogy between mass and momentum conservation equations of a water conduit and those of wave propagation in transmission lines is used. The influence of the plant configuration and design parameters on the fulfilment of the Spanish Electrical System Operator requirements is analysed
Resumo:
Energy management has always been recognized as a challenge in mobile systems, especially in modern OS-based mobile systems where multi-functioning are widely supported. Nowadays, it is common for a mobile system user to run multiple applications simultaneously while having a target battery lifetime in mind for a specific application. Traditional OS-level power management (PM) policies make their best effort to save energy under performance constraint, but fail to guarantee a target lifetime, leaving the painful trading off between the total performance of applications and the target lifetime to the user itself. This thesis provides a new way to deal with the problem. It is advocated that a strong energy-aware PM scheme should first guarantee a user-specified battery lifetime to a target application by restricting the average power of those less important applications, and in addition to that, maximize the total performance of applications without harming the lifetime guarantee. As a support, energy, instead of CPU or transmission bandwidth, should be globally managed as the first-class resource by the OS. As the first-stage work of a complete PM scheme, this thesis presents the energy-based fair queuing scheduling, a novel class of energy-aware scheduling algorithms which, in combination with a mechanism of battery discharge rate restricting, systematically manage energy as the first-class resource with the objective of guaranteeing a user-specified battery lifetime for a target application in OS-based mobile systems. Energy-based fair queuing is a cross-application of the traditional fair queuing in the energy management domain. It assigns a power share to each task, and manages energy by proportionally serving energy to tasks according to their assigned power shares. The proportional energy use establishes proportional share of the system power among tasks, which guarantees a minimum power for each task and thus, avoids energy starvation on any task. Energy-based fair queuing treats all tasks equally as one type and supports periodical time-sensitive tasks by allocating each of them a share of system power that is adequate to meet the highest energy demand in all periods. However, an overly conservative power share is usually required to guarantee the meeting of all time constraints. To provide more effective and flexible support for various types of time-sensitive tasks in general purpose operating systems, an extra real-time friendly mechanism is introduced to combine priority-based scheduling into the energy-based fair queuing. Since a method is available to control the maximum time one time-sensitive task can run with priority, the power control and time-constraint meeting can be flexibly traded off. A SystemC-based test-bench is designed to assess the algorithms. Simulation results show the success of the energy-based fair queuing in achieving proportional energy use, time-constraint meeting, and a proper trading off between them. La gestión de energía en los sistema móviles está considerada hoy en día como un reto fundamental, notándose, especialmente, en aquellos terminales que utilizando un sistema operativo implementan múltiples funciones. Es común en los sistemas móviles actuales ejecutar simultaneamente diferentes aplicaciones y tener, para una de ellas, un objetivo de tiempo de uso de la batería. Tradicionalmente, las políticas de gestión de consumo de potencia de los sistemas operativos hacen lo que está en sus manos para ahorrar energía y satisfacer sus requisitos de prestaciones, pero no son capaces de proporcionar un objetivo de tiempo de utilización del sistema, dejando al usuario la difícil tarea de buscar un compromiso entre prestaciones y tiempo de utilización del sistema. Esta tesis, como contribución, proporciona una nueva manera de afrontar el problema. En ella se establece que un esquema de gestión de consumo de energía debería, en primer lugar, garantizar, para una aplicación dada, un tiempo mínimo de utilización de la batería que estuviera especificado por el usuario, restringiendo la potencia media consumida por las aplicaciones que se puedan considerar menos importantes y, en segundo lugar, maximizar las prestaciones globales sin comprometer la garantía de utilización de la batería. Como soporte de lo anterior, la energía, en lugar del tiempo de CPU o el ancho de banda, debería gestionarse globalmente por el sistema operativo como recurso de primera clase. Como primera fase en el desarrollo completo de un esquema de gestión de consumo, esta tesis presenta un algoritmo de planificación de encolado equitativo (fair queueing) basado en el consumo de energía, es decir, una nueva clase de algoritmos de planificación que, en combinación con mecanismos que restrinjan la tasa de descarga de una batería, gestionen de forma sistemática la energía como recurso de primera clase, con el objetivo de garantizar, para una aplicación dada, un tiempo de uso de la batería, definido por el usuario, en sistemas móviles empotrados. El encolado equitativo de energía es una extensión al dominio de la energía del encolado equitativo tradicional. Esta clase de algoritmos asigna una reserva de potencia a cada tarea y gestiona la energía sirviéndola de manera proporcional a su reserva. Este uso proporcional de la energía garantiza que cada tarea reciba una porción de potencia y evita que haya tareas que se vean privadas de recibir energía por otras con un comportamiento más ambicioso. Esta clase de algoritmos trata a todas las tareas por igual y puede planificar tareas periódicas en tiempo real asignando a cada una de ellas una reserva de potencia que es adecuada para proporcionar la mayor de las cantidades de energía demandadas por período. Sin embargo, es posible demostrar que sólo se consigue cumplir con los requisitos impuestos por todos los plazos temporales con reservas de potencia extremadamente conservadoras. En esta tesis, para proporcionar un soporte más flexible y eficiente para diferentes tipos de tareas de tiempo real junto con el resto de tareas, se combina un mecanismo de planificación basado en prioridades con el encolado equitativo basado en energía. En esta clase de algoritmos, gracias al método introducido, que controla el tiempo que se ejecuta con prioridad una tarea de tiempo real, se puede establecer un compromiso entre el cumplimiento de los requisitos de tiempo real y el consumo de potencia. Para evaluar los algoritmos, se ha diseñado en SystemC un banco de pruebas. Los resultados muestran que el algoritmo de encolado equitativo basado en el consumo de energía consigue el balance entre el uso proporcional a la energía reservada y el cumplimiento de los requisitos de tiempo real.
Resumo:
Since 1996, when the first agricultural tractor with CVT transmission was shown, the presence of this type of transmissions has been increasing. All companies offer them in their products range. Nevertheless, there is little technical documentation that explains the basics of its operation. This report shows all types of CVT transmissions: non-power-split type and power-split ones, as well as the three types used in agricultural tractors, hydro-mechanical power-split transmissions (3 active shafts, input coupled planetary; 3 active shafts, output coupled planetary and 4 active shafts). The report also describes the design parameters of a type of CVT transmission, which use a power-split system with 3 active shafts as well as the fundamental relations among them. Crown Copyright 2010 Published by Elsevier Ltd. on behalf of ISTVS. All rights reserved.
Resumo:
A complete simulation of the transmission performance for Equalized Holographic ROADM (Reconfigurable Optical Add-Drop Multiplexer) designs is presented in this paper. These devices can address several wavelengths from the input to different output fibres, according to the holograms stored in a SLM (Spatial Light Modulator), where all the outputs are equalized in power. All combinations of the input wavelengths are possible at the different output fibres. To simulate the transmission performance of the EH-ROADM, a software program, from Optiwave, has been used. The correspondence between physical blocks of the device (grating, SLM, lens...) and those simulated in the program (filters, losses, splitters...) has been defined in order to obtain a close agreement between the theoretical transmission performance and the simulated one. To complete the review about Equalized Holographic ROADMs some guidelines about its design have been done.
Resumo:
In this paper, the dynamic response of a hydro power plant for providing secondary regulation reserve is studied in detail. S pecial emphasis is given to the elastic water column effects both in the penstock and the tailrace tunnel. For this purpose, a nonline ar model based on the analogy between mass and momentum conservation equations of a water conduit and those of wave propagation in transmission lines is used. The influence of the plant configuration and design parameters on the fulfilment of the Spanish Electrical System Operator requirem ents is analysed.
Resumo:
In this paper, implementation and testing of non- commercial GaN HEMT in a simple buck converter for envelope amplifier in ET and EER transmission techn iques has been done. Comparing to the prototypes with commercially available EPC1014 and 1015 GaN HEMTs, experimentally demonstrated power supply provided better thermal management and increased the switching frequency up to 25MHz. 64QAM signal with 1MHz of large signal bandw idth and 10.5dB of Peak to Average Power Ratio was gener ated, using the switching frequency of 20MHz. The obtaine defficiency was 38% including the driving circuit an d the total losses breakdown showed that switching power losses in the HEMT are the dominant ones. In addition to this, some basic physical modeling has been done, in order to provide an insight on the correlation between the electrical characteristics of the GaN HEMT and physical design parameters. This is the first step in the optimization of the HEMT design for this particular application.
Resumo:
The location of ground faults in railway electric lines in 2 × 5 kV railway power supply systems is a difficult task. In both 1 × 25 kV and transmission power systems it is common practice to use distance protection relays to clear ground faults and localize their positions. However, in the particular case of this 2 × 25 kV system, due to the widespread use of autotransformers, the relation between the distance and the impedance seen by the distance protection relays is not linear and therefore the location is not accurate enough. This paper presents a simple and economical method to identify the subsection between autotransformers and the conductor (catenary or feeder) where the ground fault is happening. This method is based on the comparison of the angle between the current and the voltage of the positive terminal in each autotransformer. Consequently, after the identification of the subsection and the conductor with the ground defect, only the subsection where the ground fault is present will be quickly removed from service, with the minimum effect on rail traffic. This method has been validated through computer simulations and laboratory tests with positive results.
Resumo:
At the level of the cochlear nucleus (CN), the auditory pathway divides into several parallel circuits, each of which provides a different representation of the acoustic signal. Here, the representation of the power spectrum of an acoustic signal is analyzed for two CN principal cells—chopper neurons of the ventral CN and type IV neurons of the dorsal CN. The analysis is based on a weighting function model that relates the discharge rate of a neuron to first- and second-order transformations of the power spectrum. In chopper neurons, the transformation of spectral level into rate is a linear (i.e., first-order) or nearly linear function. This transformation is a predominantly excitatory process involving multiple frequency components, centered in a narrow frequency range about best frequency, that usually are processed independently of each other. In contrast, type IV neurons encode spectral information linearly only near threshold. At higher stimulus levels, these neurons are strongly inhibited by spectral notches, a behavior that cannot be explained by level transformations of first- or second-order. Type IV weighting functions reveal complex excitatory and inhibitory interactions that involve frequency components spanning a wider range than that seen in choppers. These findings suggest that chopper and type IV neurons form parallel pathways of spectral information transmission that are governed by two different mechanisms. Although choppers use a predominantly linear mechanism to transmit tonotopic representations of spectra, type IV neurons use highly nonlinear processes to signal the presence of wide-band spectral features.
Resumo:
This collection of short essays arose from the inaugural meeting of the Idaho Symposium on Energy in the West, which was held in November, 2014. The topic for this first Symposium was Transmission and Transport of Energy in the Western U.S. and Canada: A Law and Policy Road Map. The essays in this collection provide a notable introduction to the major energy issues facing the West today. Topics include: building a resilient legal architecture for western energy production; natural gas flaring; transmission planning for wind energy; utilities and rooftop solar; special considerations for western states and the Clean Power Plan; the Clean Power Plan's implications for the western grid; siting renewable energy on public lands; and implications of utility reform in New York and Hawaii for the Northwest.
Resumo:
Reactive power is critical to the operation of the power networks on both safety aspects and economic aspects. Unreasonable distribution of the reactive power would severely affect the power quality of the power networks and increases the transmission loss. Currently, the most economical and practical approach to minimizing the real power loss remains using reactive power dispatch method. Reactive power dispatch problem is nonlinear and has both equality constraints and inequality constraints. In this thesis, PSO algorithm and MATPOWER 5.1 toolbox are applied to solve the reactive power dispatch problem. PSO is a global optimization technique that is equipped with excellent searching capability. The biggest advantage of PSO is that the efficiency of PSO is less sensitive to the complexity of the objective function. MATPOWER 5.1 is an open source MATLAB toolbox focusing on solving the power flow problems. The benefit of MATPOWER is that its code can be easily used and modified. The proposed method in this thesis minimizes the real power loss in a practical power system and determines the optimal placement of a new installed DG. IEEE 14 bus system is used to evaluate the performance. Test results show the effectiveness of the proposed method.
Resumo:
From the Introduction. The Media Sector has experienced a technological revolution in the last 15 years. Digital encoding of television signals made possible a more efficient use of the radiospectrum. Digital terrestrial television (hereinafter, “DTT”) allows now for the reception of a significant number of free-to-air channels.1 Moreover, the use of new transmission platforms (hereinafter,“platforms”), namely cable and direct-to-home satellite (hereinafter, “DTH”) paved the way for the arrival in Europe of pay-TV operators, which finance their activities mainly via subscription fees. This changing technological landscape is subject to further evolution in the near future, as incumbent telecommunications operators become increasingly interested in making available broadcasting content2 as part of their broadband offer and 3G mobile handsets can be used for the reception of TV signals....The present paper seeks to ascertain whether the Commission “regulatory approach” towards the exclusive sale of premium content is a sound one, in particular in view of the constant technological evolution outlined above. The assumptions underlying landmark Commission decisions will be compared with recent developments of the media sector in Italy. In the NewsCorp./Telepiù case, decided in 2003, the Commission imposed very strict conditions to allow the merger giving birth to Sky Italia, on the assumption that the operation created a lasting near-monopsony in the different upstream markets for the acquisition of premium intervened against the media conglomerate Mediaset (which controls, inter alia, the main three private free-to-air channels in Italy) for an alleged abuse of dominant position.17 In fact, and contrary to the forecasts made by the Commission, Mediaset was in a position to acquire the broadcasting rights of the main Italian football teams, thereby excluding the incumbent (and near-monopolist) pay-TV operator, Sky Italia. This may go to show that the reality of the sector is more complex and evolves faster than one may infer from the Commission practice, thus putting into question its stance regarding exclusivity. The experience of the evolution of the Italian media sector will be used as the starting point for the evaluation of alternative regulatory options.
Resumo:
During Russian PM Dmitry Medvedev’s working visit to Minsk on 18 July, Russia and Belarus signed a general contract for the construction of a nuclear power plant in Belarus. The signature brought to an end the complex negotiations which had been underway since January 2009 involving the leadership in Minsk, the Russian government and Atomstroyexport, the Russian company that will be the main contractor of the investment. However, the power plant’s future ownership structure, management arrangements and terms and conditions of profit sharing remain unclear. The Belarusian leadership hopes that with the launch of the nuclear power plant, it will be able to reduce gas imports from Russia, gas being the main resource used in producing heat and electricity in Belarus. This should in turn reduce the costs of energy generation. In addition, Minsk expects that the new investment will allow it to export electricity surpluses to the European Union, including Poland. Agreements concerning the power plant have been concluded over the last year or so and, according to these, Russia has acquired partial control of the Belarusian electricity grid, especially with regard to the transmission of energy to foreign markets. Russia is also the sole creditor and contractor for the investment, and the sole future provider of nuclear fuel. Therefore, implementation of the project will exacerbate Minsk’s already significant dependence on Moscow in energy and political terms.
Resumo:
Mode of access: Internet.
Resumo:
At head of title FCST energy R&D goals study.
Resumo:
National Highway Traffic Safety Administration, Office of Research and Development, Washington, D.C.