877 resultados para software management infrastructure


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objective:

The aim of this study was to identify sources of anatomical misrepresentation due to the location of camera mounting, tumour motion velocity and image processing artefacts in order to optimise the 4DCT scan protocol and improve geometrical-temporal accuracy.

Methods:

A phantom with an imaging insert was driven with a sinusoidal superior-inferior motion of varying amplitude and period for 4DCT scanning. The length of a high density cube within the insert was measured using treatment planning software to determine the accuracy of its spatial representation. Scan parameters were varied including the tube rotation period and the cine time between reconstructed images. A CT image quality phantom was used to measure various image quality signatures under the scan parameters tested.

Results:

No significant difference in spatial accuracy was found for 4DCT scans carried out using the wall mounted or couch mounted camera for sinusoidal target motion. Greater spatial accuracy was found for 4DCT scans carried out using a tube rotation speed of 0.5s rather than 1.0s. The reduction in image quality when using a faster rotation speed was not enough to require an increase in patient dose.

Conclusions:

4DCT accuracy may be increased by optimising scan parameters, including choosing faster tube rotation speeds. Peak misidentification in the recorded breathing trace leads to spatial artefacts and this risk can be reduced by using a couch mounted infrared camera.

Advances in knowledge:

This study explicitly shows that 4DCT scan accuracy is improved by scanning with a faster CT tube rotation speed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes an end-user model for a domestic pervasive computing platform formed by regular home objects. The platform does not rely on pre-planned infrastructure; instead, it exploits objects that are already available in the home and exposes their joint sensing, actuating and computing capabilities to home automation applications. We advocate an incremental process of the platform formation and introduce tangible, object-like artifacts for representing important platform functions. One of those artifacts, the application pill, is a tiny object with a minimal user interface, used to carry the application, as well as to start and stop its execution and provide hints about its operational status. We also emphasize streamlining the user's interaction with the platform. The user engages any UI-capable object of his choice to configure applications, while applications issue notifications and alerts exploiting whichever available objects can be used for that purpose. Finally, the paper briefly describes an actual implementation of the presented end-user model. © (2010) by International Academy, Research, and Industry Association (IARIA).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many of the societal challenges that current spatial planning practice claims to be addressing (climate change, peak oil, obesity, aging society etc) encompass issues and timescales that lie beyond the traditional scope planning policy (Campbell 2006). The example of achieving a low carbon economy typifies this in that it demands a process of society-wide transition, involving steering a wide range of factors (markets, infrastructure, governance, individual behaviour etc). Such a process offers a challenge to traditional approaches to planning as they cannot be guided by a fixed blueprint, given the timescales involved (up to 50 years) and an enhanced level of uncertainty, social resistance, lack of control over implementation and a danger of ‘policy lock in’ (Kemp et al 2007). One approach to responding to these challenges is the concept of transition management which has emerged from studies of science, technology and innovation (Geels 2002, Markard et al 2012). Although not without criticism, this perspective attempts to uncertainty and complexity encompassing long term visions that integrates multi-level, multi-actor and multi-domain perspectives (Rotmans et al 2001).
 
Given its origins, research on transition management has tended to neglect spatial contexts (Coenen et al 2012) and, related to this, it’s relationship with spatial planning is poorly understood. Using the example of the low carbon transition, this paper will review the relationships between the concepts, methodologies and goals of transition management and spatial planning to explore whether a closer integration of the two fields offers benefits to achieving the long term challenges facing society.
 

Relevância:

30.00% 30.00%

Publicador:

Resumo:

DRAM technology faces density and power challenges to increase capacity because of limitations of physical cell design. To overcome these limitations, system designers are exploring alternative solutions that combine DRAM and emerging NVRAM technologies. Previous work on heterogeneous memories focuses, mainly, on two system designs: PCache, a hierarchical, inclusive memory system, and HRank, a flat, non-inclusive memory system. We demonstrate that neither of these designs can universally achieve high performance and energy efficiency across a suite of HPC workloads. In this work, we investigate the impact of a number of multilevel memory designs on the performance, power, and energy consumption of applications. To achieve this goal and overcome the limited number of available tools to study heterogeneous memories, we created HMsim, an infrastructure that enables n-level, heterogeneous memory studies by leveraging existing memory simulators. We, then, propose HpMC, a new memory controller design that combines the best aspects of existing management policies to improve performance and energy. Our energy-aware memory management system dynamically switches between PCache and HRank based on the temporal locality of applications. Our results show that HpMC reduces energy consumption from 13% to 45% compared to PCache and HRank, while providing the same bandwidth and higher capacity than a conventional DRAM system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Landslides and debris flows, commonly triggered by rainfall, pose a geotechnical risk causing disruption to transport routes and incur significant financial expenditure. With infrastructure maintenance budgets becoming ever more constrained, this paper provides an overview of some of the developing methods being implemented by Queen’s University, Belfast in collaboration with the Department for Regional Development to monitor the stability of two distinctly different infrastructure slopes in Northern Ireland. In addition to the traditional, intrusive ground investigative and laboratory testing methods, aerial LiDAR, terrestrial LiDAR, geophysical techniques and differential Global Positioning Systems have been used to monitor slope stability. Finally, a comparison between terrestrial LiDAR, pore water pressure and soil moisture deficit (SMD) is presented to outline the processes for a more informed management regime and to highlight the season relationship between landslide activity and the aforementioned parameters.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Demand Side Management (DSM) plays an important role in Smart Grid. It has large scale access points, massive users, heterogeneous infrastructure and dispersive participants. Moreover, cloud computing which is a service model is characterized by resource on-demand, high reliability and large scale integration and so on and the game theory is a useful tool to the dynamic economic phenomena. In this study, a scheme design of cloud + end technology is proposed to solve technical and economic problems of the DSM. The architecture of cloud + end is designed to solve technical problems in the DSM. In particular, a construct model of cloud + end is presented to solve economic problems in the DSM based on game theories. The proposed method is tested on a DSM cloud + end public service system construction in a city of southern China. The results demonstrate the feasibility of these integrated solutions which can provide a reference for the popularization and application of the DSM in china.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Network management tools must be able to monitor and analyze traffic flowing through network systems. According to the OpenFlow protocol applied in Software-Defined Networking (SDN), packets are classified into flows that are searched in flow tables. Further actions, such as packet forwarding, modification, and redirection to a group table, are made in the flow table with respect to the search results. A novel hardware solution for SDN-enabled packet classification is presented in this paper. The proposed scheme is focused on a label-based search method, achieving high flexibility in memory usage. The implemented hardware architecture provides optimal lookup performance by configuring the search algorithm and by performing fast incremental update as programmed the software controller.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Cloud data centres are implemented as large-scale clusters with demanding requirements for service performance, availability and cost of operation. As a result of scale and complexity, data centres typically exhibit large numbers of system anomalies resulting from operator error, resource over/under provisioning, hardware or software failures and security issus anomalies are inherently difficult to identify and resolve promptly via human inspection. Therefore, it is vital in a cloud system to have automatic system monitoring that detects potential anomalies and identifies their source. In this paper we present a lightweight anomaly detection tool for Cloud data centres which combines extended log analysis and rigorous correlation of system metrics, implemented by an efficient correlation algorithm which does not require training or complex infrastructure set up. The LADT algorithm is based on the premise that there is a strong correlation between node level and VM level metrics in a cloud system. This correlation will drop significantly in the event of any performance anomaly at the node-level and a continuous drop in the correlation can indicate the presence of a true anomaly in the node. The log analysis of LADT assists in determining whether the correlation drop could be caused by naturally occurring cloud management activity such as VM migration, creation, suspension, termination or resizing. In this way, any potential anomaly alerts are reasoned about to prevent false positives that could be caused by the cloud operator’s activity. We demonstrate LADT with log analysis in a Cloud environment to show how the log analysis is combined with the correlation of systems metrics to achieve accurate anomaly detection.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Large construction projects create numerous hazards, making it one of the most dangerous industries in which to work. This element of risk increases in urban areas and can have a negative impact on the external stakeholders associated with the project, along with their surrounding environments. The aim of this paper is to identify and document, in an urban context, the numerous issues encountered by on-site project managers from external stakeholders and how they affect a construction project. In addressing this aim, the core objective is to identify what issues are involved in the management of these stakeholders. In order to meet this requirement, a qualitative methodology encompassing an informative literature review followed by five individual case study interviews. The data gathered is assessed qualitatively using mind mapping software. A number of issues are identified which have an impact on the external stakeholders involved, and also how they affected proceedings on site. Collectively the most commonly occurring issues are environmental, legal, health and safety and communication issues. These ranged from road closures and traffic disruption to noise, dust and vibrations from site works. It is anticipated that the results of this study will assist and aid project managers in identifying issues considering external stakeholders, particularly on urban construction projects. A wide range of issues can develop depending on the complexity and nature of each project, but this research will illustrate and reinforce to project managers, that identifying issues early, effective communication and appropriate liaising can be used to manage the issues considering external stakeholders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Os sistemas distribuídos embarcados (Distributed Embedded Systems – DES) têm sido usados ao longo dos últimos anos em muitos domínios de aplicação, da robótica, ao controlo de processos industriais passando pela aviónica e pelas aplicações veiculares, esperando-se que esta tendência continue nos próximos anos. A confiança no funcionamento é uma propriedade importante nestes domínios de aplicação, visto que os serviços têm de ser executados em tempo útil e de forma previsível, caso contrário, podem ocorrer danos económicos ou a vida de seres humanos poderá ser posta em causa. Na fase de projecto destes sistemas é impossível prever todos os cenários de falhas devido ao não determinismo do ambiente envolvente, sendo necessária a inclusão de mecanismos de tolerância a falhas. Adicionalmente, algumas destas aplicações requerem muita largura de banda, que também poderá ser usada para a evolução dos sistemas, adicionandolhes novas funcionalidades. A flexibilidade de um sistema é uma propriedade importante, pois permite a sua adaptação às condições e requisitos envolventes, contribuindo também para a simplicidade de manutenção e reparação. Adicionalmente, nos sistemas embarcados, a flexibilidade também é importante por potenciar uma melhor utilização dos, muitas vezes escassos, recursos existentes. Uma forma evidente de aumentar a largura de banda e a tolerância a falhas dos sistemas embarcados distribuídos é a replicação dos barramentos do sistema. Algumas soluções existentes, quer comerciais quer académicas, propõem a replicação dos barramentos para aumento da largura de banda ou para aumento da tolerância a falhas. No entanto e quase invariavelmente, o propósito é apenas um, sendo raras as soluções que disponibilizam uma maior largura de banda e um aumento da tolerância a falhas. Um destes raros exemplos é o FlexRay, com a limitação de apenas ser permitido o uso de dois barramentos. Esta tese apresentada e discute uma proposta para usar a replicação de barramentos de uma forma flexível com o objectivo duplo de aumentar a largura de banda e a tolerância a falhas. A flexibilidade dos protocolos propostos também permite a gestão dinâmica da topologia da rede, sendo o número de barramentos apenas limitado pelo hardware/software. As propostas desta tese foram validadas recorrendo ao barramento de campo CAN – Controller Area Network, escolhido devido à sua grande implantação no mercado. Mais especificamente, as soluções propostas foram implementadas e validadas usando um paradigma que combina flexibilidade com comunicações event-triggered e time-triggered: o FTT – Flexible Time- Triggered. No entanto, uma generalização para CAN nativo é também apresentada e discutida. A inclusão de mecanismos de replicação do barramento impõe a alteração dos antigos protocolos de replicação e substituição do nó mestre, bem como a definição de novos protocolos para esta finalidade. Este trabalho tira partido da arquitectura centralizada e da replicação do nó mestre para suportar de forma eficiente e flexível a replicação de barramentos. Em caso de ocorrência de uma falta num barramento (ou barramentos) que poderia provocar uma falha no sistema, os protocolos e componentes propostos nesta tese fazem com que o sistema reaja, mudando para um modo de funcionamento degradado. As mensagens que estavam a ser transmitidas nos barramentos onde ocorreu a falta são reencaminhadas para os outros barramentos. A replicação do nó mestre baseia-se numa estratégia líder-seguidores (leaderfollowers), onde o líder (leader) controla todo o sistema enquanto os seguidores (followers) servem como nós de reserva. Se um erro ocorrer no nó líder, um dos nós seguidores passará a controlar o sistema de uma forma transparente e mantendo as mesmas funcionalidades. As propostas desta tese foram também generalizadas para CAN nativo, tendo sido para tal propostos dois componentes adicionais. É, desta forma possível ter as mesmas capacidades de tolerância a falhas ao nível dos barramentos juntamente com a gestão dinâmica da topologia de rede. Todas as propostas desta tese foram implementadas e avaliadas. Uma implementação inicial, apenas com um barramento foi avaliada recorrendo a uma aplicação real, uma equipa de futebol robótico onde o protocolo FTT-CAN foi usado no controlo de movimento e da odometria. A avaliação do sistema com múltiplos barramentos foi feita numa plataforma de teste em laboratório. Para tal foi desenvolvido um sistema de injecção de faltas que permite impor faltas nos barramentos e nos nós mestre, e um sistema de medida de atrasos destinado a medir o tempo de resposta após a ocorrência de uma falta.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In an information-driven society where the volume and value of produced and consumed data assumes a growing importance, the role of digital libraries gains particular importance. This work analyzes the limitations in current digital library management systems and the opportunities brought by recent distributed computing models. The result of this work is the implementation of the University of Aveiro integrated system for digital libraries and archives. It concludes by analyzing the system in production and proposing a new service oriented digital library architecture supported in a peer-to-peer infrastructure