950 resultados para school development project


Relevância:

100.00% 100.00%

Publicador:

Resumo:

An IAPT service and a clinical health psychology team piloted a service development providing Step 2 and Step 3 services for individuals with long-term health conditions. Results indicate that such services may be offered with access to specialist training and supervision.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Journey in the Landscape of Sustainable School Development “A Journey in the Landscape of Sustainable School Development” is a story of the Sorrila School development process. This research deals with a school development project as a process, and as a part of international projects on Education for Sustainable Development, with ENSI (Environment and School Initiatives) being the most important. The main purpose of the study was to analyze the change process as a general phenomenon as well as the learning connected to it. The research describes the development period 2001–2008 at the Sorrila Primary school. The research questions are as follows: 1. What did pupils learn during the research and development period? 2. How did the coordinating teacher develop personally? 3. How were the ENSI targets and other closely linked projects reached? 4. What was the feedback from the pupils, their parents and other teachers at the school? 5. How did the developing process proceed in 2001–2008? The method used was integrating action research, which also had ethnographical elements. Narrative was the form of the data as well as the manner of reporting. The method as a whole was integrating, ethnographical action research as a story. The research data consisted mostly of Knowledge Forum notes written by the teacher-researcher. Knowledge Forum is an Internetbased collaborative knowledge-building programme. Pupils’, parents’ and other teachers’ feedback, newspaper articles and students’ writings complied the data, which consists of material from seven years. Sustainable development was the basis of the school improvement. The targets of the United Nations Decade of Education for Sustainable Development (2005–2014) were part of the development projects. According to the research results the school was seen as part of complex systems where manifold and interactive learning took place. The learning of pupils, teachers and the school as a community can be characterised socioculturally. The school was able to reach a level of collaborative transformative learning. As well as several concrete projects, such as Comenius school project, school development consisted of networking at many levels. Along with the projects and networking, the school was able to apply the pedagogy of connection, by carrying out integrative and cross-disciplinary themes and using various learning and teaching methods. International cooperation was a natural part of the work. A figure of Aunt Green, the role model of the teacher researcher, was an innovation which resembled a change agent. The other role of the teacherresearcher as a coordinator, was important for her own professional development. According to the results the change process, which relied on sustainable school development, led the school along a road of positive renewals. It was not a series of projects but an ongoing process. The objectives of the international projects were accomplished to a great extent during the research period. According to the principles of action research, the main results were put forward in order to help others to develop their schools. Frictions and problems as well as positive experiences and rejecting dualities were seen as change forces. Keywords: education for sustainable development (ESD), sustainable school development, teacher professional development, integrating, pedagogy of connection, transformative learning

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This dissertation is a case study dealing with a school development project that took place in an upper secondary school as a result of a merger of two schools with different cultures. The project used a method called “Frirumsmodellen” and was planned to be conducted in three steps. The first was to carry out a cultural analysis in order to map the preconditions to start a school development project. The second was to carry out concrete actions and finally study eventual effects from such activities by doing a second cultural analysis. My role was to be a supervisor in the school development work, but at the same time study how this work was conducted and its impact in the ordinary school day. The dissertation takes its departure in the fact that schools are political governed. The mission of schools is never neutral; it is always an expression of behind laying social forces, ideologies and ideals of the contemporary society. Of this reason, there is a close connection between the macro political level and the micro political level. Another point of departure is the transition from a modern to a post modern society that gives the character to the changes that take place in schools. Steering of schools has partly been treated as a technical implementation problem. Schools contain on going conflicts between different interest groups that, more or less regularly, end up in educational reforms. These reforms generate school development activities in the single school. Undoubtedly, this makes school development to a complex process. At a rather late stage of the study I decided not to fulfil my task to follow the original plan. I instead let the school development project as a model to be in focus. The over all purpose was formulated: How is it possible to understand what happened in the school development project in the Falkgymnasiet and why was it not possible to carry it out as it was said in the project plan? To interpret what took place during the project I did create an interpretation frame of implementation and complexity theory that also made it possible to critically scrutinise the “Frirumsmodellen”. Already in an early stage of the process it was obvious that the “Frirumsmodellen” did not supply any tools to use and it became disconnected from the project. The project in it selves was marginalised and made invisible. The headmaster used the situation to change things she thought were important to develop. As a result, things happened, but most of the involved people did not at first hand connect this to the project. It is, of course, difficult in detail to say what caused what. The complexity theory successively made the hidden patterns revealed, hidden unofficial potentates visible, as well as unpredictable conditions that generated reactions from the personnel in front of a development work. Together this was rather efficient obstacles for not changing this school. I also discuss school development and implementation problems on a general level, for example, the possibility to transform a top-down initiated project to be bottom-up driven and using project as a tool for school development work. It was obvious that headmasters and teachers must be prepared to handle the ideological dimensions of problems schools have to face. Consequently, development work is about making problems visible and to handle these in the intersection point between the intentions of educational policies, pedagogical researchers, school administrators, headmasters, teachers and pupils. The ideological dimension also contains an existential issue. Do I as a teacher share the intentions for the development work? If not, how must I act?

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The notion of academic performance renders account of the results achieved by the students during their school education.  Internally, there are two opposed phenomena:  school success and school failure.  Sociology of education has contributed to the discussion of both notions revealing their social nature closely related to the institutional and socio-cultural contexts in which education is developed.  This paper is the result of a research project conducted for our doctoral thesis.  Its purpose is to contribute to enlighten the scopes of this discussion, by analyzing the school development of a group of working class women from Mendoza. We were interested, in the first place, in knowing the reasons why they quit school when they were young girls or adolescents.  Subsequently, we have approached the opportunities they had to access the system again during their adulthood, the obstacles they had to face and the resources to be able to complete the medium level.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is known to be an important contributor towards the gross domestic product of many countries. Moreover, the health of the construction industry is positively correlated to the economic growth of a country and in many economies public sector clients account for a major share of construction works. Given this strength, it is important for public sector clients to initiate innovations aimed at the betterment of the industry. In this context, concern about sustainable development has been a major driver of some innovative initiatives in construction industries worldwide. Furthermore, the Government of Hong Kong regards both sustainability and community development as important criteria when planning and procuring construction projects. This paper is based on a case study of a public sector development project in Hong Kong, and presents the salient features of the procurement and contractual systems adopted in the project, which foster sustainability and community development. The reported interim findings are based on a preliminary document analysis that is part of an ongoing longitudinal case study into the project. The document analysis takes a three-pronged approach in terms of how the procurement and contractual systems foster economic, environmental and social sustainability, and sums up their impact on the community as a whole.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose, Design/methodology / approach The acknowledgement of state significance in relation to development projects can result in special treatment by regulatory authorities, particularly in terms of environmental compliance and certain economic and other government support measures. However, defining just what constitutes a “significant project”, or a project of “state significance”, varies considerably between Australian states. In terms of establishing threshold levels, in Queensland there is even less clarity. Despite this lack of definition, the implications of “state significance” can nevertheless be considerable. For example, in Queensland if the Coordinator-General declares a project to be a “significant project” under the State Development and Public Works Organisation Act 1971, the environmental impact assessment process may become more streamlined – potentially circumventing certain provisions under The Integrated Planning Act 1997. If the project is not large enough to be so deemed, an extractive resource under the State Planning Policy 2/07 - Protection of Extractive Resources 2007 may be considered to be of State or regional significance and subsequently designated as a “Key Resource Area”. As a consequence, such a project is afforded some measure of resource protection but remains subject to the normal assessment process under the Integrated Development Assessment System, as well as the usual requirements of the vegetation management codes, and other regulations. Findings (Originality/value) & Research limitations / implications This paper explores the various meanings of “state significance” in Queensland and the ramifications for development projects in that state. It argues for a streamlining of the assessment process in order to avoid or minimise constraints acting on the state’s development. In so doing, it questions the existence of a strategic threat to the delivery of an already over-stretched infrastructure program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many of the costs associated with greenfield residential development are apparent and tangible. For example, regulatory fees, government taxes, acquisition costs, selling fees, commissions and others are all relatively easily identified since they represent actual costs incurred at a given point in time. However, identification of holding costs are not always immediately evident since by contrast they characteristically lack visibility. One reason for this is that, for the most part, they are typically assessed over time in an ever-changing environment. In addition, wide variations exist in development pipeline components: they are typically represented from anywhere between a two and over sixteen years time period - even if located within the same geographical region. Determination of the starting and end points, with regards holding cost computation, can also prove problematic. Furthermore, the choice between application of prevailing inflation, or interest rates, or a combination of both over time, adds further complexity. Although research is emerging in these areas, a review of the literature reveals attempts to identify holding cost components are limited. Their quantification (in terms of relative weight or proportionate cost to a development project) is even less apparent; in fact, the computation and methodology behind the calculation of holding costs varies widely and in some instances completely ignored. In addition, it may be demonstrated that ambiguities exists in terms of the inclusion of various elements of holding costs and assessment of their relative contribution. Yet their impact on housing affordability is widely acknowledged to be profound, with their quantification potentially maximising the opportunities for delivering affordable housing. This paper seeks to build on earlier investigations into those elements related to holding costs, providing theoretical modelling of the size of their impact - specifically on the end user. At this point the research is reliant upon quantitative data sets, however additional qualitative analysis (not included here) will be relevant to account for certain variations between expectations and actual outcomes achieved by developers. Although this research stops short of cross-referencing with a regional or international comparison study, an improved understanding of the relationship between holding costs, regulatory charges, and housing affordability results.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.