772 resultados para government procurement


Relevância:

30.00% 30.00%

Publicador:

Resumo:

In many countries, the main providers for major infrastructure projects are government or public agencies. Public infrastructure projects includes economic and social infrastructure such as transportation, education and health facilities. Most decision-making models for delivery of public infrastructure projects are heavily weighted towards financial/economic factors. In Australia, public participation is an essential instrument in the procurement of infrastructure and development within Australia. This study reviews the public participation, values and interests in the procurement of infrastructure projects in Australia, and identifies the research direction in this research area in order to improve the decision-making models that capture stakeholder social, economical and environmental concerns in infrastructure projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry plays a substantial role in a country’s national economy, irrespective of the country’s levels of economic development. The Malaysian Government has given a much needed boost to the country’s construction projects under the 9th Malaysian Plan where a total of 880 projects worth RM15billion (US$48billion) is to be tendered (The Star, 2006). However, Malaysia has not escaped the problems of project failure. In 2005, 17.3% of 417 Malaysian government contracts projects were considered “sick”. Project procurement is one of the most important stages of project delivery. Even though ethics in project procurement has been identified as one of the contributors to project failure, it has not been systematically studied before from the perspective of client in Malaysia. The aim of this paper is to present an exploration to the ethical issues in project procurement in Malaysian public sector projects. By exploring ethical issues from client perspective, this could provide an ethical standpoint for the project life cycle and could maintain a good affiliation between the clients and the customers. It is expected that findings from this review will be somewhat representative of other developing countries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The significant challenge faced by government in demonstrating value for money in the delivery of major infrastructure resolves around estimating costs and benefits of alternative modes of procurement. Faced with this challenge, one approach is to focus on a dominant performance outcome visible on the opening day of the asset, as the means to select the procurement approach. In this case, value for money becomes a largely nominal concept and determined by selected procurement mode delivering, or not delivering, the selected performance outcome, and notwithstanding possible under delivery on other desirable performance outcomes, as well as possibly incurring excessive transaction costs. This paper proposes a mind-set change in this particular practice, to an approach in which the analysis commences with the conditions pertaining to the project and proceeds to deploy transaction cost and production cost theory to indicate a procurement approach that can claim superior value for money relative to other competing procurement modes. This approach to delivering value for money in relative terms is developed in a first-order procurement decision making model outlined in this paper. The model developed could be complementary to the Public Sector Comparator (PSC) in terms of cross validation and the model more readily lends itself to public dissemination. As a possible alternative to the PSC, the model could save time and money in preparation of project details to lesser extent than that required in the reference project and may send a stronger signal to the market that may encourage more innovation and competition.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Project Procurement is a ‘great’ environment for ethical issues with its low-price state of mind and competition. It has many opportunities that could contribute to illegal activities or unethical behavior especially in the construction industry. In 2006 alone, 17.3% of 417 Malaysian government contract projects were considered sick due to the poor performance by the contractors. Therefore it is important to govern the project procurement, especially the plan procurement stage to ensure the accountability and transparency of the decision made in awarding the right contract to the best contractor. This is where project governance framework (PGF) is really needed in project procurement planning. Project governance is a subset of corporate governance focusing on the areas of corporate governance related to project activities, including: portfolio direction, project sponsorship, project and program management and efficiency and disclosure and reporting. This paper highlights the importance of implementing project governance framework (PGF) to ensure that the decision makers are answerable and accountable to the stakeholders, and the decision making is transparent to avoid any ethical issues arises. A comprehensive preliminary literature is carried out to discover the importance of executing PGF in project procurement in Malaysian public sector. By understanding the important of PGF, it is hoped that this will bring a signal to other developing countries to implement the similar method in ensuring the transparency of the decision making in project procurement planning in their countries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is a lack of research which identifies the role of the public-sector client in relation to ethical practice in plan procurement. This paper discusses a conceptual framework for ethical decision making in project procurement, focusing on public sector clients within the Malaysian construction industry. A framework is proposed to ensure that effective ethical decision making strategies are deployed to ensure that plan procurement is carried out with a transparent process so that the public sector clients are able to adopt. The conceptual framework adopts various factors that contribute to ethical decision making at the early stage of procurement and consists of the procurement system, individual factors, project characteristics, and organizational culture as the internal factors and professional code of conduct and government policies as the external factors. This framework rationalizes the relationships between systems, psychology and organizational theory to form an innovative understanding of making ethical decisions in plan procurement. It is expected that this proposed framework will be useful as a foundation for identifying the factors that contribute to ethical decision making focusing on the planning stage of procurement process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Management of change in construction organisations to capture internal knowledge and maximise innovation is central to construction process re-engineering. Recent international trends toward privatisation and outsourcing of many government functions has seen wholesale changes to the role of government departments. In Brisbane, Australia, the Port of Brisbane Corporation has responsibilities for development and maintenance of all port and harbour facilities in the Brisbane region. The PBC is an acknowledged leader in encouraging internal technical development. Yet 20 years ago, this organisation operated as a small division within a large and bureaucratic Queensland Government public service department. This paper reviews construction project procurement strategies for the port’s civil and structural facilities since a separate organisational entity with responsibilities for Port of Brisbane was formed in 1976. The Port of Brisbane Corporation serves as an initial case study setting for a larger research project studying innovative practices in the context of the trend towards corporatising and privatising public sector organisations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Social procurement provides a key source of income for the Third Sector, and is vital for the sustainability of many nonprofit organisations. Social procurement involves the exchange of economic capital from one organisation, typically government (although for-profit and non-profit organisations can also purchase), with a nonprofit organisations in order to deliver other forms of. It is this transformation of economic capital into other forms of capital (cultural, human, social) in the social procurement process, which is the focus of this paper. Four case studies, which are representative of the four main types of social procurement, will be examined in order to trace how economic capital is transformed into other types of capital in each of these cases. In so doing, the paper will advance our understanding of social procurement theoretically, and lead to a wider discussion about the role of social procurement in ensuring the sustainability of nonprofit organisations, and the civil societies in which they operate.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Organisations within the not-for-profit sector provide services to individuals and groups government and for-profit organisations cannot or will not consider. This response by the not-for-profit sector to market failure and government failure is a well understood contribution to society by the nonprofit sector. Over time, this response has resulted in the development of a vibrant and rich agglomeration of services and programs that operate under a myriad of philosophical stances, service orientations, client groupings and operational capacities. In Australia, these organisations and services provide social support and service assistance to many people in the community; often targeting their assistance to clients facing the most difficult of clients with complex problems. Initially, in undertaking this role, the not-for-profit sector received limited sponsorship from government, relying on primarily on public donations to fund the delivery of services. (Lyons 2001). Over time governments assumed greater responsibility in the form of service grants to particular groups: ‘the worthy poor’. More recently, government has engaged in widespread procurement of services from the not-for-profit sector, which specify the nature of the outcomes to be achieved and, to a degree, the way in which the services will be provided. A consequence of this growing shift to a more marketised model of service contracting, often offered-up under the label of enhanced collaborative practice, has been increased competitiveness between agencies that had previously worked well together (Keast and Brown, 2006). One of the challenges which emerge from the procurement of services by government from third sector organisations is that public values such as effectiveness, efficiency, transparency and professionalism can be neglected (Jørgensen and Bozeman 2002), although this is not always the case (Brown, Furneaux and Gudmundsson 2012). While some approaches to the examination of social procurement - the intentional purchasing of social outcomes (Furneaux and Barraket 2011) - assumes that public values are lost in social procurement arrangements (Bozeman 2002; Jørgensen and Bozeman 2002), alternative approach suggest such inevitability is not the case. Instead, social procurement is seen to involve a set of tensions (Brown, Potoski and Slyke 2006) or a set of trade offs (Charles et al. 2007), which must be managed, and through such management, public values can be potentially safeguarded (Bruin and Dicke 2006). The potential trade-offs of public values in social procurement is an area in need of further research, and one which carries both theoretical and practical significance. Additionally, the juxtaposition of policies – horizontal integration and vertical efficiency – results in a complex, crowded and contested policy and practice environment (Keast et al., 2007),, with the potential for set of unintentional consequences arising from these arrangements. Further the involvement of for-profit, non-profit, and hybrid organisations such as social enterprises, adds further complexity in the number of different organisational forms engaged in service delivery on behalf of government. To address this issue, this paper uses information gleaned from a state-wide survey of not-for-profit organisations in Queensland, Australia which included within its focus organisational size, operational scope, funding arrangements and governance/management approaches. Supplementing this information is qualitative data derived from 17 focus groups and 120 interviews conducted over ten years of study of this sector. The findings contribute to greater understanding of the practice and theory of the future provision of social services.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Australian Government and most Australian road authorities have set ambitious greenhouse gas emission (GHGe) reduction targets for the near future, many of which have translated into action plans. However, previous research has shown that the various Australian state road authorities are at different stages of implementing ‘green’ initiatives in construction planning and development, with considerable gaps in their monitoring, tendering, and contracting. This study illustrates the differences between procurement standards and project specific practices that aim to reduce GHGe from road construction projects in three of the largest Australian road construction clients, with a focus on the tools used, contract type and incentives for better performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to investigate whether new and young firms are different from older firms. This analysis is undertaken to explore general characteristics, use of external resources and growth orientation. Design/methodology/approach – Data from the 2008 UK Federation of Small Businesses survey provided 8,000 responses. Quantitative analysis identified significantly different characteristics of firms from 0-4, 4-9, 9-19 and 20+ years. Factor analysis was utilised to identify the advice sets, finance and public procurement customers of greatest interest, with ANOVA used to statistically compare firms in the identified age groups with different growth aspirations. Findings – The findings reveal key differences between new, young and older firms in terms of characteristics including business sector, owner/manager age, education/business experience, legal status, intellectual property and trading performance. New and young firms were more able to access beneficial resources in terms of finance and advice from several sources. New and young firms were also able to more easily access government and external finance, as well as government advice, but less able to access public procurement. Research limitations/implications – New and young firms are utilising external networks to access several resources for development purposes, and this differs for older firms. This suggests that a more explicit age-differentiated focus is required for government policies aimed at supporting firm growth. Originality/value – The study provides important baseline data for future quantitative and qualitative studies focused on the impact of firm age and government policy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Managing public sector projects in Malaysia is a unique challenge. This is because of the ethical issues involved during the project procurement process. These ethical issues need attention because they will have an impact on the quality, cost and time of the project itself. The ethical issues here include conflict of interest, bid shopping, collusive tendering, bid cutting, corruption and the payment game. In 2006, 17.3% of 417 Malaysian government contract projects were considered sick due to contractors' performances that failed to conduct the project according to the project plan. Some of the sick projects from these statistics are due to the ethical issues involved. These construction projects have low quality due to the selection of the contractors, done unethically due to personal relationships instead of professional qualifications. That is why it is important to govern the project procurement processes to ensure the accountability and transparency of the decision making process to ensure that these ethical issues can be avoided. Extensive research has been conducted on the ethical issues in the tendering process or the award phase of project management. There is a lack of studies looking at the role of clients, including the government client, in relation to unethical practice in project procurement in the public sector. It is important to understand that ethical issues not only involve the contractors and suppliers but also the clients. Even though there are codes of ethics in the public sectors, ethical issues still arise. Therefore, this research develops a project governance framework (PGEDM) for ethical decision making in the Malaysian public sectors. This framework combines the ethical decision making process together with the project governance principals in guiding the public sectors with ethical decision making in project procurement. A triangulation of questionnaire survey and Delphi study was employed in this research to collect required qualitative and quantitative data. A questionnaire survey was conducted among the public officials (the practitioners) who are currently working in the procurement area in the Malaysian public sectors, in identifying the ethical behaviours and factors influencing further ethical behaviour to occur. A Delphi study was also conducted with the assistance of a panel of experts consisting of practitioners that have expertise in the area of project governance and project procurement as well as academician, which further considered the relationship and the influence of the criteria and indicators of ethical decision making (EDM) and project governance (project criteria, organisational culture, contract award criteria, individual criteria, client's requirements, government procedures and professional ethics). Through the identification and integration of the factors and EDM criteria as well as the project governance criteria and EDM steps for ethical issues, a PGEDM framework was developed to promote, and drive consistent decision outcome in project procurement in the public sector. The framework contributes significantly to ethical decision making in the project procurement process. These findings not only give benefit to the people involved in project procurement but also to the public officials in guiding them to be more accountable in handling ethical issues in the future and to have a more transparent decision making process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose Most barriers and enablers of sustainable projects are related to procurement. This study proposes a framework for evaluating green procurement practices throughout the lifecycle of road construction projects and demonstrates its application through an Australian case study. Design/methodology/approach The study is based on linking the phases of road construction with incentive mechanisms for proactively motivating behavioural change. A holistic view on utilised and potential incentives is attempted with a literature review and a state-of-practice review. The latter is based on interviews and 90 policy and procurement documents across five Australian states. Findings An evaluation framework with seven procurement stages is suggested to describe current state green procurement incentives throughout the delivery lifecycle of road construction projects. The Australian case study was found to provide useful data to identify gaps and strong points of the different states regarding their level of integration of sustainability and greenhouse gas emissions GHG) reduction elements in their procurement practices. This understanding was used to draw recommendations on future advancement of green procurement. Originality/value: Government entities across the globe can impact considerably the achievement of sustainability and GHG targets, by using their procurement practices and requirements to create incentives for contractors and suppliers to engage in more GHG conscious practices. The present study provides a systematic account of how green procurement practices can be underpinned using the Australian road construction industry as a case study, and distinguish between strong and weak links in the green procurement chain to draw recommendations for future initiatives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Social procurement has gained attention in modern public management; however, considerable differences exist in understanding what social procurement actually is. Divergent definitions of social procurement inhibit effective policy implementation, and can result in imprecision in empirical research. This paper develops a typology of social procurement implementation, and advances a coherent single definition of social procurement. Clarifying the intent and approaches to social procurement will assist policy implementation and empirical evaluation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A procurement decision-making model is developed based on a novel integration of leading-edge microeconomic theory and empirically tested in major road and health projects. The model provides a more reliable approach to identifying projects suited to Public-Private-Partnerships (PPPs) and it is expected that the model will enable government to deliver improved value-for-money from their portfolio of PPP projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Funded by an Australian Research Council (ARC) Linkage grant over four years (2009–13), the Major Infrastructure Procurement project sought to find more effective and efficient ways of procuring and delivering the nation’s social and economic infrastructure by investigating constraints relating to construction capacity, competition, and finance in new public sector major infrastructure.1 The research team comprised researchers in construction economics and finance from Queensland University of Technology (QUT), Griffith University (GU), The University of Hong Kong (UHK), and The University of Newcastle (UoN). Project partners included state government departments and agencies responsible for infrastructure procurement and delivery from all Australian mainland states, and private sector companies and peak bodies in the infrastructure sector (see “Introduction” for complete list). There are a number of major outcomes from this research project. The first of these is a scientifically developed decisionmaking model for procurement of infrastructure that deploys a novel and state-of-the-art integration of dominant microeconomic theory (including theories developed by two Nobel Prize winners). The model has been established through empirical testing and substantial experiential evidence as a valid and reliable guide to configuring procurement of new major and mega infrastructure projects in pursuance of superior Valuefor- Money (VfM). The model specifically addresses issues of project size, bundling of contracts, and exchange relationships. In so doing, the model determines the suitability of adopting a Public-Private Partnership (PPP) mode.