987 resultados para contract theory
Resumo:
Scanning tunneling microscopy permits us to image the Kondo resonance of a single magnetic atom adsorbed on a metallic surface. When the magnetic impurity is placed at the focus of an elliptical quantum corral, a Kondo resonance has been recently observed both on top of the impurity and on top of the focus where no magnetic impurity is present. This projection of the Kondo resonance to a remote point on the surface is referred to as quantum mirage. We present a quantum mechanical theory for the quantum mirage inside an ideal quantum corral and predict that the mirage will occur in corrals with shapes other than elliptical.
Resumo:
From the Introduction. This contribution will focus on the core question if, how and to what extent the EU procurement rules and principles (may) affect the national health care systems. We start our analysis by summarizing the applicable EU public procurement legislation, principles and soft law and its exact scope in relation to health care. (section 2). Subsequently, we turn to the parties in a contract, subject to procurement rules in the field of health care, addressing both the definition of contracting authorities and relevant case law (section 3). This will then lead to an analysis of possible justifications for not holding a tender procedure in the field of health care (section 4). Finally, we illustrate the impact of EU public procurement rules on health care by analysing a Dutch case study, in which the question whether public hospitals in the Netherlands qualify as contracting authorities in terms of the Public Sector Directive stood central (section 5). Our conclusions will follow in section 6.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
"This work has been supported in part by the Office of Naval Research under Contract NR 044 001"
Resumo:
"Contract AF33(616)-6079 Project No. 9-(13-6278) Task 40572. Sponsored by: Wright Air Development Center"
Resumo:
"This work has been supported in part by the Office of Naval Research under Contract NR 044 001"
Resumo:
Issued also as thesis (M.S.) University of Illinois.
Resumo:
Final report; July 1978.
Resumo:
"AEC Contract AT930-1)-2137."
Resumo:
"Department of Army Project no. 5B99-01-004, Ordnance R and D Project no. TB2-0001, Office of Ordnance Research Project no. 1348, Contract no. DA-19-020-ORD-3250."
Resumo:
"Resaerch...sponsored by the National Aeronautics and Space Administration under Contract no. NAS 3-2121."
Resumo:
"Contract AT-11-1-GEN-14. Bettis PLant, Pittsburgh, Pa., operated for the U. S. Atomic Energy Commission by Westinghouse Electric Corporation."
Resumo:
Contract no. DA-19-020-ORD-3520."
Resumo:
"Prepared under Contract AT(04-3)-165 with the United States Atomic Energy Commission."
Resumo:
"These notes were prepared at Cornell University from lectures given in Mathematics 742 in 1953 ... and were recorded by J. Sacks. The notes are intended only for the convenience of the student and are not intended to be considered as a text on the subject matter. These notes were mimeographed under a contract with the Office of Naval Research."