Numerous techniques have been developed to control cost and time of construction projects. However, there is limited research on issues surrounding the practical usage of these techniques. To address this, a survey was conducted on the top 150 construction companies and 100 construction consultancies in the UK aimed at identifying common project control practices and factors inhibiting effective project control in practice. It found that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: The purpose of this paper is to investigate the relations between perceived business uncertainty (PBU), use of external risk management (RM) consultants, formalisation of RM, magnitude of RM methods and perceived organisational outcomes. Design/methodology/approach: This paper is based on a questionnaire survey of members of the Chartered Institute of Management Accountants in the UK. Using AMOS 17.0, the paper tests the strength of the direct and indirect effects among the variables and explores the fit of the overall path model. Findings: The results indicate significant and positive associations exist between the extent of PBU and the level ofRMformalisation, as well as between the level ofRMformalisation and the magnitude of RMmethods adopted. The use of externalRMconsultants is also found to have a significant and positive impact on the magnitude of RM methods adopted. Finally, both the extent of RM formalisation and the magnitude of RM methods adopted are seen to be significantly associated with overall improvement in organisational outcomes. Research limitations/implications: The study uses perceptual measures of the level of business uncertainty, usage of RM and organisational outcomes. Further, the respondents are members of a management accounting professional body and the views of other managers, such as risk managers, who are also important to the governance process are not incorporated. Originality/value: This study provides empirical evidence on the impact ofRMdesign and usage on improvements in organisational outcomes. It contributes to the RM literature where empirical research is needed in order to be comparable with the traditional management control system literature.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We develop a multi-theoretic approach, drawing on economic, institutional, managerial power and social comparison literatures to explain the role of the external compensation consultant in the top management pay setting institutional field. Taking advantage of recent disclosure requirements in the UK, we collect data on compensation consultant use in 232 large companies. We show that consultants are a prevalent part of the CEO pay setting scene, and document evidence of all advisor use. Our econometric results show that consultant use is associated with firm size and the equity pay mix. We also show that CEO pay is positively associated with peer firms that share consultants, with higher board and consultant interlocks, and some evidence that where firms supply other business services to the firm, CEO pay is greater. © 2009 Springer Science+Business Media, LLC.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Little research has been done on how well prepared occupational therapists feel to perform the role of consultant. This study investigated the perceptions of occupational therapists acting as consultants in Florida schools, how much education/training they have received and how they perceive their consultation skills. Participants in the study were sent a questionnaire and measures of central tendency were calculated on each item. Crosstabulations using Fisher's exact test were completed to investigate any relationship between type of consultation model used and relationships with educators. A one way ANOVA was conducted to investigate any relationship between self-perceived consultant skills and age, amount of experience, and training. The results indicate that occupational therapists providing consultative services rate their abilities as more than adequate and believe formal training in consultation is only mildly important. No significant relationships were found between training and skills or model used and relationships with educators.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Travail dirigé présenté à la Faculté des études supérieures et postdoctorales en vue de l’obtention du grade de Maître ès sciences (M. SC.) en Criminologie, option Sécurité Intérieure

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Travail dirigé présenté à la Faculté des études supérieures et postdoctorales en vue de l’obtention du grade de Maître ès sciences (M. SC.) en Criminologie, option Sécurité Intérieure

Relevância:

10.00% 10.00%

Publicador:

Resumo:

John Frazer, Professor, trained at the Architectural Association, taught first at Cambridge University and then the AA in the 1970s and again in the '90s. He was Head of School of Design Research History and Criticism at the University of Ulster in the 1980s, he also ran a systems and design consultancy with his wife Julia (including projects for Cedric Price and Walter Segal) and was founder and chairman of Autographics software. He is currently Swire Chair Professor and Head of School of Design in Hong Kong.----- This is a very personal perspective on a concept of universal and future significance. It is personal, both is the sense that it is an unashamedly biased view of both the significance of the project, and the nature of that significance and because the author was personally involved as one of the consultants on GENERATOR and subsequently involved Cedric Price in its educational application at the Architectural Association. GENERATOR is still very much alive and was still developing whilst this chapter was being written.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

“SOH see significant benefit in digitising its drawings and operation and maintenance manuals. Since SOH do not currently have digital models of the Opera House structure or other components, there is an opportunity for this national case study to promote the application of Digital Facility Modelling using standardized Building Information Models (BIM)”. The digital modelling element of this project examined the potential of building information models for Facility Management focusing on the following areas: • The re-usability of building information for FM purposes • BIM as an Integrated information model for facility management • Extendibility of the BIM to cope with business specific requirements • Commercial facility management software using standardised building information models • The ability to add (organisation specific) intelligence to the model • A roadmap for SOH to adopt BIM for FM The project has established that BIM – building information modelling - is an appropriate and potentially beneficial technology for the storage of integrated building, maintenance and management data for SOH. Based on the attributes of a BIM, several advantages can be envisioned: consistency in the data, intelligence in the model, multiple representations, source of information for intelligent programs and intelligent queries. The IFC – open building exchange standard – specification provides comprehensive support for asset and facility management functions, and offers new management, collaboration and procurement relationships based on sharing of intelligent building data. The major advantages of using an open standard are: information can be read and manipulated by any compliant software, reduced user “lock in” to proprietary solutions, third party software can be the “best of breed” to suit the process and scope at hand, standardised BIM solutions consider the wider implications of information exchange outside the scope of any particular vendor, information can be archived as ASCII files for archival purposes, and data quality can be enhanced as the now single source of users’ information has improved accuracy, correctness, currency, completeness and relevance. SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. There have been remarkably few technical difficulties in converting the House’s existing conventions and standards to the new model based environment. This demonstrates that the IFC model represents world practice for building data representation and management (see Sydney Opera House – FM Exemplar Project Report Number 2005-001-C-3, Open Specification for BIM: Sydney Opera House Case Study). Availability of FM applications based on BIM is in its infancy but focussed systems are already in operation internationally and show excellent prospects for implementation systems at SOH. In addition to the generic benefits of standardised BIM described above, the following FM specific advantages can be expected from this new integrated facilities management environment: faster and more effective processes, controlled whole life costs and environmental data, better customer service, common operational picture for current and strategic planning, visual decision-making and a total ownership cost model. Tests with partial BIM data – provided by several of SOH’s current consultants – show that the creation of a SOH complete model is realistic, but subject to resolution of compliance and detailed functional support by participating software applications. The showcase has demonstrated successfully that IFC based exchange is possible with several common BIM based applications through the creation of a new partial model of the building. Data exchanged has been geometrically accurate (the SOH building structure represents some of the most complex building elements) and supports rich information describing the types of objects, with their properties and relationships.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The construction industry is categorised as being an information-intensive industry and described as one of the most important industries in any developed country, facing a period of rapid and unparalleled change (Industry Science Resources 1999) (Love P.E.D., Tucker S.N. et al. 1996). Project communications are becoming increasingly complex, with a growing need and fundamental drive to collaborate electronically at project level and beyond (Olesen K. and Myers M.D. 1999; Thorpe T. and Mead S. 2001; CITE 2003). Yet, the industry is also identified as having a considerable lack of knowledge and awareness about innovative information and communication technology (ICT) and web-based communication processes, systems and solutions which may prove beneficial in the procurement, delivery and life cycle of projects (NSW Government 1998; Kajewski S. and Weippert A. 2000). The Internet has debatably revolutionised the way in which information is stored, exchanged and viewed, opening new avenues for business, which only a decade ago were deemed almost inconceivable (DCITA 1998; IIB 2002). In an attempt to put these ‘new avenues of business’ into perspective, this report provides an overall ‘snapshot’ of current public and private construction industry sector opportunities and practices in the implementation and application of web-based ICT tools, systems and processes (e-Uptake). Research found that even with a reserved uptake, the construction industry and its participating organisations are making concerted efforts (fortunately with positive results) in taking up innovative forms of doing business via the internet, including e-Tendering (making it possible to manage the entire tender letting process electronically and online) (Anumba C.J. and Ruikar K. 2002; ITCBP 2003). Furthermore, Government (often a key client within the construction industry),and with its increased tendency to transact its business electronically, undoubtedly has an effect on how various private industry consultants, contractors, suppliers, etc. do business (Murray M. 2003) – by offering a wide range of (current and anticipated) e-facilities / services, including e-Tendering (Ecommerce 2002). Overall, doing business electronically is found to have a profound impact on the way today’s construction businesses operate - streamlining existing processes, with the growth in innovative tools, such as e-Tender, offering the construction industry new responsibilities and opportunities for all parties involved (ITCBP 2003). It is therefore important that these opportunities should be accessible to as many construction industry businesses as possible (The Construction Confederation 2001). Historically, there is a considerable exchange of information between various parties during a tendering process, where accuracy and efficiency of documentation is critical. Traditionally this process is either paper-based (involving large volumes of supporting tender documentation), or via a number of stand-alone, non-compatible computer systems, usually costly to both the client and contractor. As such, having a standard electronic exchange format that allows all parties involved in an electronic tender process to access one system only via the Internet, saves both time and money, eliminates transcription errors and increases speed of bid analysis (The Construction Confederation 2001). Supporting this research project’s aims and objectives, researchers set to determine today’s construction industry ‘current state-of-play’ in relation to e-Tendering opportunities. The report also provides brief introductions to several Australian and International e-Tender systems identified during this investigation. e-Tendering, in its simplest form, is described as the electronic publishing, communicating, accessing, receiving and submitting of all tender related information and documentation via the internet, thereby replacing the traditional paper-based tender processes, and achieving a more efficient and effective business process for all parties involved (NT Governement 2000; NT Government 2000; NSW Department of Commerce 2003; NSW Government 2003). Although most of the e-Tender websites investigated at the time, maintain their tendering processes and capabilities are ‘electronic’, research shows these ‘eTendering’ systems vary from being reasonably advanced to more ‘basic’ electronic tender notification and archiving services for various industry sectors. Research also indicates an e-Tender system should have a number of basic features and capabilities, including: • All tender documentation to be distributed via a secure web-based tender system – thereby avoiding the need for collating paperwork and couriers. • The client/purchaser should be able to upload a notice and/or invitation to tender onto the system. • Notification is sent out electronically (usually via email) for suppliers to download the information and return their responses electronically (online). • During the tender period, updates and queries are exchanged through the same e-Tender system. • The client/purchaser should only be able to access the tenders after the deadline has passed. • All tender related information is held in a central database, which should be easily searchable and fully audited, with all activities recorded. • It is essential that tender documents are not read or submitted by unauthorised parties. • Users of the e-Tender system are to be properly identified and registered via controlled access. In simple terms, security has to be as good as if not better than a manual tender process. Data is to be encrypted and users authenticated by means such as digital signatures, electronic certificates or smartcards. • All parties must be assured that no 'undetected' alterations can be made to any tender. • The tenderer should be able to amend the bid right up to the deadline – whilst the client/purchaser cannot obtain access until the submission deadline has passed. • The e-Tender system may also include features such as a database of service providers with spreadsheet-based pricing schedules, which can make it easier for a potential tenderer to electronically prepare and analyse a tender. Research indicates the efficiency of an e-Tender process is well supported internationally, with a significant number, yet similar, e-Tender benefits identified during this investigation. Both construction industry and Government participants generally agree that the implementation of an automated e-Tendering process or system enhances the overall quality, timeliness and cost-effectiveness of a tender process, and provides a more streamlined method of receiving, managing, and submitting tender documents than the traditional paper-based process. On the other hand, whilst there are undoubtedly many more barriers challenging the successful implementation and adoption of an e-Tendering system or process, researchers have also identified a range of challenges and perceptions that seem to hinder the uptake of this innovative approach to tendering electronically. A central concern seems to be that of security - when industry organisations have to use the Internet for electronic information transfer. As a result, when it comes to e-Tendering, industry participants insist these innovative tendering systems are developed to ensure the utmost security and integrity. Finally, if Australian organisations continue to explore the competitive ‘dynamics’ of the construction industry, without realising the current and future, trends and benefits of adopting innovative processes, such as e-Tendering, it will limit their globalising opportunities to expand into overseas markets and allow the continuation of international firms successfully entering local markets. As such, researchers believe increased knowledge, awareness and successful implementation of innovative systems and processes raises great expectations regarding their contribution towards ‘stimulating’ the globalisation of electronic procurement activities, and improving overall business and project performances throughout the construction industry sectors and overall marketplace (NSW Government 2002; Harty C. 2003; Murray M. 2003; Pietroforte R. 2003). Achieving the successful integration of an innovative e-Tender solution with an existing / traditional process can be a complex, and if not done correctly, could lead to failure (Bourn J. 2002).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This document reports on an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in NSW, Vic and Qld, covering main contractors, trade contractors, consultants, suppliers and clients. One-third of this population was sampled and a response rate of 30% was achieved. The survey investigates innovation determinants in the industry, comprising various aspects of business strategy and business environment.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report summarises the fi ndings of an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The BRITE Innovation Survey can be viewed in full at www.brite.crcci.info.The objective of the BRITE project is to improve the incidence and quality of innovation in the Australian construction industry. Many stakeholders in the industry are sceptical about the potential for innovation and its likely benefi ts. Many also lack the linkages and capabilities required for successful innovation. The BRITE Project is redressing this situation through demonstration and benchmarking activities. The term ‘innovation’ is defi ned as a new or signifi cantly improved technology or advanced business practice. Innovation may be technological or organisational, and it may be new to the world, or just new to the industry or business concerned. The defi nition includes the adoption of existing advancements developed outside a particular business. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in New South Wales, Victoria and Queensland, covering main contractors, trade contractors, consultants, suppliers and clients. Onethird of this population was sampled and a response rate of almost 30% was achieved. The survey collected information about respondents’ perceptions of innovation determinants in the industry, comprising various aspects of business strategy and business environment.