917 resultados para Tidal power industry
Resumo:
Rapid development of plug-in hybrid electric vehicles (PHEVs) brings new challenges and opportunities to the power industry. A large number of idle PHEVs can potentially be employed to form a distributed energy storage system for supporting renewable generation. To reduce the negative effects of unsteady renewable generation outputs, a stochastic optimization-based dispatch model capable of handling uncertain outputs of PHEVs and renewable generation is formulated in this paper. The mathematical expectations, second-order original moments, and variances of wind and photovoltaic (PV) generation outputs are derived analytically. Incorporated all the derived uncertainties, a novel generation shifting objective is proposed. The cross-entropy (CE) method is employed to solve this optimal dispatch model. Multiple patterns of renewable generation depending on seasons and renewable market shares are investigated. The feasibility and efficiency of the developed optimal dispatch model, as well as the CE method, are demonstrated with a 33-node distribution system.
Resumo:
This report provides an overview of the tornado impact on the safe operation and shutdown of nuclear power plants in the United States. The motivation for this review stems from the damage and failure of the Fukushima nuclear power plant on March 11, 2011. That disaster warrants comparison of the safety measures in place within the global nuclear power industry.
Resumo:
An estuarine model is described which computes the dispersive and advective properties of the Severn Estuary. It was calibrated and validated using 50 measured salinity distributions and then used to predict the magnitude and sitings of the major inputs of dissolved cadmium levels throughout the estuary. The results provided an impetus for implementing tighter controls on effluents and for improving estimates of cadmium discharges from industrial sources. The model has also been used to investigate the sensitivity of the estuarine system to changes in dispersion; by considering large reductions in the dispersion coefficients it is hoped that the results might be indicative of the environmental consequences following the construction of a tidal power generating scheme.
Resumo:
Ecosystem services provided by the marine environment are fundamental to human health and well-being. Despite this, many marine systems are being degraded to an extent that may reduce their capacity to provide these ecosystem services. The ecosystem approach is a strategy for the integrated management of land, water and living resources that promotes conservation and sustainable use in an equitable way (UN Convention on Biological Diversity, 2000). Its application to marine management and spatial planning has been proposed as a means of maintaining the economic and social value of the oceans, not only in the present but for generations to come. Characterising the susceptibility of services (and combinations of services) to particular human activities based on knowledge of impacts on biodiversity and ecosystem functioning (as described in preceding chapters) is a challenge for future management of the oceans. In this chapter, we highlight the existing, but limited knowledge of how ecosystem services may be impacted by different human activities. We discuss how impacts on one service can impact multiple services and explore how the impacts on services can vary both spatially and temporally and according to context. We focus particularly on the effects on ecosystem services of activities whose impacts on biodiversity and ecosystem functioning have already been considered in previous chapters. Some of these activities are associated with poor management of ecosystem benefits, for example, from provisioning services (aquaculture and fisheries), or with excessive input of wastes, fertilisers and contaminants into the system overburdening the waste treatment and assimilation services. Other impacts are associated with the construction of structures or use of space designed to generate benefits from environmental services such as the presence of water as a carrier for shipping, or sources of wind, wave and tidal power. We discuss the trade-offs that are made, consciously or otherwise, between different ecosystem services, which arise from human activities to optimise or manage specific ecosystem services.
Resumo:
Geraint Ellis and Richard Cowell explain the findings of the ‘Delivering renewable energy under devolution’ project, including some reasons for Scotland’s lead.
The UK has seen massive increases in renewable energy since 1998, with installed capacity growing from 2,600 MW to 12,300 MW in 2011. This has coincided with devolution and it is within Northern Ireland, Scotland and Wales that the greatest increases have been seen.
As devolved administrations now host half of the UK’s renewable energy capacity, their policies are critical to achieving the broader UK targets. This also provides a fascinating insight into what sort of approach works best, and why. This has been the focus of a two-year study, funded by the Economic and Social Research Council, involving universities from across the UK, which indicates that Scotland is leading the way on renewable energy.
All devolved governments have offered significant support to renewable energy but have different degrees of powers in relation to energy. Scotland’s success seems to be based on the centrality of energy issues to current political aspirations, particularly the SNP, but also has cross-party support. The research suggests that the consensus on the importance of renewable energy amongst élite interests in Scotland helps to explain why Scottish governments have been empowered and enabled to make robust use of the powers available.
As it has achieved successful growth in the sector, this too helps cultivate credibility among key business interests and gives increased leverage to its position in policy discussions with the UK Government. Scotland has been more consistent over time in presenting the expansion of renewable energy as a national economic agenda, rather than just an environmental or rural development agenda. The availability of larger, windy, but relatively less contested sites for onshore wind in Scotland has meant that more projects went through central consenting procedures rather than local planning authorities. Its enhanced support for wave and tidal power technologies is also notable. These political conditions have been harder to find in the rest of the UK, making progress a little more uncertain.
Northern Ireland has used its powers (which are more extensive than Scotland’s) to facilitate small-scale renewables and bio-fuel processes, with its liberalised planning regime offering an initial boost to expanding capacity.
This has contrasted with the position in Wales, which has least control over energy but the Welsh Government has adopted a more innovative approach to strategic spatial zoning; this appears to have pulled in a larger volume of onshore wind development interest than could be expected in a comparable region of England. A downside of the Welsh approach appears to be the fact that the concentration of these wind projects in these zones has triggered public opposition and political conflict.
It therefore appears that the powers available to the devolved governments do not seem to determine which country has been able to make greatest headway, with broader political commitments being more significant. Despite this, the research does not conclude that the actions and activities undertaken by the devolved governments are necessarily the most important factors in shaping the development of renewable energy in the UK. This is because devolution is still a relatively new dimension of energy governance in the UK and decisions affecting key drivers for renewable energy investment are still made mainly in Westminster, with the Treasury exercising close budgetary control. In all areas of the UK, grid capacity expansion remains slow to achieve. The major growth in offshore wind to date has been driven mainly by Westminster and cross-UK bodies with the most significant capacity growth being in English territorial waters.
Resumo:
In competitive electricity markets with deep concerns for the efficiency level, demand response programs gain considerable significance. As demand response levels have decreased after the introduction of competition in the power industry, new approaches are required to take full advantage of demand response opportunities. Grid operators and utilities are taking new initiatives, recognizing the value of demand response for grid reliability and for the enhancement of organized spot markets’ efficiency. This paper proposes a methodology for the selection of the consumers that participate in an event, which is the responsibility of the Portuguese transmission network operator. The proposed method is intended to be applied in the interruptibility service implemented in Portugal, in convergence with Spain, in the context of the Iberian electricity market. This method is based on the calculation of locational marginal prices (LMP) which are used to support the decision concerning the consumers to be schedule for participation. The proposed method has been computationally implemented and its application is illustrated in this paper using a 937 bus distribution network with more than 20,000 consumers.
Resumo:
Sustainable development concerns are being addressed with increasing attention, in general, and in the scope of power industry, in particular. The use of distributed generation (DG), mainly based on renewable sources, has been seen as an interesting approach to this problem. However, the increasing of DG in power systems raises some complex technical and economic issues. This paper presents ViProd, a simulation tool that allows modeling and simulating DG operation and participation in electricity markets. This paper mainly focuses on the operation of Virtual Power Producers (VPP) which are producers’ aggregations, being these producers mainly of DG type. The paper presents several reserve management strategies implemented in the scope of ViProd and the results of a case study, based on real data.
Resumo:
Electricity markets are complex environments, involving numerous entities trying to obtain the best advantages and profits while limited by power-network characteristics and constraints.1 The restructuring and consequent deregulation of electricity markets introduced a new economic dimension to the power industry. Some observers have criticized the restructuring process, however, because it has failed to improve market efficiency and has complicated the assurance of reliability and fairness of operations. To study and understand this type of market, we developed the Multiagent Simulator of Competitive Electricity Markets (MASCEM) platform based on multiagent simulation. The MASCEM multiagent model includes players with strategies for bid definition, acting in forward, day-ahead, and balancing markets and considering both simple and complex bids. Our goal with MASCEM was to simulate as many market models and player types as possible. This approach makes MASCEM both a short- and mediumterm simulation as well as a tool to support long-term decisions, such as those taken by regulators. This article proposes a new methodology integrated in MASCEM for bid definition in electricity markets. This methodology uses reinforcement learning algorithms to let players perceive changes in the environment, thus helping them react to the dynamic environment and adapt their bids accordingly.
Resumo:
In competitive electricity markets with deep concerns for the efficiency level, demand response programs gain considerable significance. As demand response levels have decreased after the introduction of competition in the power industry, new approaches are required to take full advantage of demand response opportunities. This paper presents DemSi, a demand response simulator that allows studying demand response actions and schemes in distribution networks. It undertakes the technical validation of the solution using realistic network simulation based on PSCAD. The use of DemSi by a retailer in a situation of energy shortage, is presented. Load reduction is obtained using a consumer based price elasticity approach supported by real time pricing. Non-linear programming is used to maximize the retailer’s profit, determining the optimal solution for each envisaged load reduction. The solution determines the price variations considering two different approaches, price variations determined for each individual consumer or for each consumer type, allowing to prove that the approach used does not significantly influence the retailer’s profit. The paper presents a case study in a 33 bus distribution network with 5 distinct consumer types. The obtained results and conclusions show the adequacy of the used methodology and its importance for supporting retailers’ decision making.
Resumo:
Wind resource evaluation in two sites located in Portugal was performed using the mesoscale modelling system Weather Research and Forecasting (WRF) and the wind resource analysis tool commonly used within the wind power industry, the Wind Atlas Analysis and Application Program (WAsP) microscale model. Wind measurement campaigns were conducted in the selected sites, allowing for a comparison between in situ measurements and simulated wind, in terms of flow characteristics and energy yields estimates. Three different methodologies were tested, aiming to provide an overview of the benefits and limitations of these methodologies for wind resource estimation. In the first methodology the mesoscale model acts like “virtual” wind measuring stations, where wind data was computed by WRF for both sites and inserted directly as input in WAsP. In the second approach, the same procedure was followed but here the terrain influences induced by the mesoscale model low resolution terrain data were removed from the simulated wind data. In the third methodology, the simulated wind data is extracted at the top of the planetary boundary layer height for both sites, aiming to assess if the use of geostrophic winds (which, by definition, are not influenced by the local terrain) can bring any improvement in the models performance. The obtained results for the abovementioned methodologies were compared with those resulting from in situ measurements, in terms of mean wind speed, Weibull probability density function parameters and production estimates, considering the installation of one wind turbine in each site. Results showed that the second tested approach is the one that produces values closest to the measured ones, and fairly acceptable deviations were found using this coupling technique in terms of estimated annual production. However, mesoscale output should not be used directly in wind farm sitting projects, mainly due to the mesoscale model terrain data poor resolution. Instead, the use of mesoscale output in microscale models should be seen as a valid alternative to in situ data mainly for preliminary wind resource assessments, although the application of mesoscale and microscale coupling in areas with complex topography should be done with extreme caution.
Resumo:
The research towards efficient, reliable and environmental-friendly power supply solutions is producing growing interest to the “Smart Grid” approach for the development of the electricity networks and managing the increasing energy consumption. One of the novel approaches is an LVDC microgrid. The purpose of the research is to analyze the possibilities for the implementation of LVDC microgrids in public distribution networks in Russia. The research contains the analysis of the modern Russian electric power industry, electricity market, electricity distribution business, regulatory framework and standardization, related to the implementation of LVDC microgrid concept. For the purpose of the economic feasibility estimation, a theoretical case study for comparing low voltage AC and medium voltage AC with LVDC microgrid solutions for a small settlement in Russia is presented. The results of the market and regulatory framework analysis along with the economic comparison of AC and DC solutions show that implementation of the LVDC microgrid concept in Russia is possible and can be economically feasible. From the electric power industry and regulatory framework point of view, there are no serious obstacles for the LVDC microgrids in Russian distribution networks. However, the most suitable use cases at the moment are expected to be found in the electrification of remote settlements, which are isolated from the Unified Energy System of Russia.
Resumo:
Análisis del riesgo de oportunismo del gobierno Colombiano planteado por el diseño institucional y normativo de la CREG, y favorecido por una notoria concentración de calidades en cabeza del Estado Colombiano como agente de mercado y regulador.
Resumo:
Objetivo: Evaluar la percepción que tienen los trabajadores acerca del sistema de seguridad y salud en el trabajo en la población asistencial y administrativa en un Hospital de III nivel de atención., Bogotá-Colombia. Materiales y métodos: Estudio de corte transversal en población de trabajadores asistenciales y administrativos. Se aplicó el “Cuestionario Nórdico Sobre Seguridad en el Trabajo NOSACQ 50 Spanish” validado. La muestra fue probabilística estratificada aleatoria, en 308 trabajadores (230 asistenciales y 78 administrativos). Resultados: El promedio de edad fue 39.5± 12 años, con mayor frecuencia de género femenino (74.68%), estado civil soltero (38.96%) y nivel educativo técnico (34.40%). La percepción que tienen los trabajadores acerca del sistema de seguridad y salud en el trabajo fue independiente de su tipo de actividad laboral administrativa y asistencial (p>0.05), la mayor percepción en ambos grupos fue la confianza de los trabajadores en la eficacia del sistema de seguridad (2.71 y 2.77), y las de menor percepción presentaron el empoderamiento de seguridad de gestión (2.35 y 2.46) y la seguridad como prioridad de los empleados y rechazo del riesgo (2.35 y 2.40). Conclusiones: Los trabajadores del Hospital tienen un nivel adecuado de buena percepción acerca de los aspectos de seguridad y salud en el trabajo donde se evidenció que la fortaleza es la confianza de los trabajadores en la eficacia del sistema y la debilidad del sistema se encuentra en la falta de empoderamiento y rechazo al riesgo.