976 resultados para Secure Multi-Party Computation


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This work aims at proposing the use of the evolutionary computation methodology in order to jointly solve the multiuser channel estimation (MuChE) and detection problems at its maximum-likelihood, both related to the direct sequence code division multiple access (DS/CDMA). The effectiveness of the proposed heuristic approach is proven by comparing performance and complexity merit figures with that obtained by traditional methods found in literature. Simulation results considering genetic algorithm (GA) applied to multipath, DS/CDMA and MuChE and multi-user detection (MuD) show that the proposed genetic algorithm multi-user channel estimation (GAMuChE) yields a normalized mean square error estimation (nMSE) inferior to 11%, under slowly varying multipath fading channels, large range of Doppler frequencies and medium system load, it exhibits lower complexity when compared to both maximum likelihood multi-user channel estimation (MLMuChE) and gradient descent method (GrdDsc). A near-optimum multi-user detector (MuD) based on the genetic algorithm (GAMuD), also proposed in this work, provides a significant reduction in the computational complexity when compared to the optimum multi-user detector (OMuD). In addition, the complexity of the GAMuChE and GAMuD algorithms were (jointly) analyzed in terms of number of operations necessary to reach the convergence, and compared to other jointly MuChE and MuD strategies. The joint GAMuChE-GAMuD scheme can be regarded as a promising alternative for implementing third-generation (3G) and fourth-generation (4G) wireless systems in the near future. Copyright (C) 2010 John Wiley & Sons, Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Effective legislation and standards for the coordination procedures between consumers, producers and the system operator supports the advances in the technologies that lead to smart distribution systems. In short-term (ST) maintenance scheduling procedure, the energy producers in a distribution system access to the long-term (LT) outage plan that is released by the distribution system operator (DSO). The impact of this additional information on the decision-making procedure of producers in ST maintenance scheduling is studied in this paper. The final ST maintenance plan requires the approval of the DSO that has the responsibility to secure the network reliability and quality, and other players have to follow the finalized schedule. Maintenance scheduling in the producers’ layer and the coordination procedure between them and the DSO is modelled in this paper. The proposed method is applied to a 33-bus distribution system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Negotiation is a fundamental tool for reaching understandings that allow each involved party to gain an advantage for themselves by the end of the process. In recent years, with the increasing of compe-titiveness in most sectors, negotiation procedures become present in practically all of them. One particular environment in which the competitiveness has been increasing exponentially is the electricity markets sector. This work is directed to the study of electricity markets’ partici-pating entities interaction, namely in what concerns the formation, management and operation of aggregating entities – Virtual Power Players (VPPs). VPPs are responsible for managing coalitions of market players with small market negotiating influence, which take strategic advantage in entering such aggregations, to increase their negotiating power. This chapter presents a negotiation methodology for the creation and management of coalitions in Electricity Markets. This approach is tested using MASCEM, taking advantage of its ability to provide the means to model and simulate VPPs. VPPs are represented as coalitions of agents, with the capability of negotiating both in the market, and internally, with their members, in order to combine and manage their individual specific characteristics and goals, with the strategy and objectives of the VPP itself.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Secure group communication is a paradigm that primarily designates one-to-many communication security. The proposed works relevant to secure group communication have predominantly considered the whole network as being a single group managed by a central powerful node capable of supporting heavy communication, computation and storage cost. However, a typical Wireless Sensor Network (WSN) may contain several groups, and each one is maintained by a sensor node (the group controller) with constrained resources. Moreover, the previously proposed schemes require a multicast routing support to deliver the rekeying messages. Nevertheless, multicast routing can incur heavy storage and communication overheads in the case of a wireless sensor network. Due to these two major limitations, we have reckoned it necessary to propose a new secure group communication with a lightweight rekeying process. Our proposal overcomes the two limitations mentioned above, and can be applied to a homogeneous WSN with resource-constrained nodes with no need for a multicast routing support. Actually, the analysis and simulation results have clearly demonstrated that our scheme outperforms the previous well-known solutions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Este artigo apresenta uma nova abordagem (MM-GAV-FBI), aplicável ao problema da programação de projectos com restrições de recursos e vários modos de execução por actividade, problema conhecido na literatura anglo-saxónica por MRCPSP. Cada projecto tem um conjunto de actividades com precedências tecnológicas definidas e um conjunto de recursos limitados, sendo que cada actividade pode ter mais do que um modo de realização. A programação dos projectos é realizada com recurso a um esquema de geração de planos (do inglês Schedule Generation Scheme - SGS) integrado com uma metaheurística. A metaheurística é baseada no paradigma dos algoritmos genéticos. As prioridades das actividades são obtidas a partir de um algoritmo genético. A representação cromossómica utilizada baseia-se em chaves aleatórias. O SGS gera planos não-atrasados. Após a obtenção de uma solução é aplicada uma melhoria local. O objectivo da abordagem é encontrar o melhor plano (planning), ou seja, o plano que tenha a menor duração temporal possível, satisfazendo as precedências das actividades e as restrições de recursos. A abordagem proposta é testada num conjunto de problemas retirados da literatura da especialidade e os resultados computacionais são comparados com outras abordagens. Os resultados computacionais validam o bom desempenho da abordagem, não apenas em termos de qualidade da solução, mas também em termos de tempo útil.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do Grau de Mestre em Engenharia Electrotécnica e de Computadores

Relevância:

30.00% 30.00%

Publicador:

Resumo:

4th International Conference, SIMPAR 2014, Bergamo, Italy, October 20-23, 2014

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia Informática

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia Informática

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Earthworks involve the levelling or shaping of a target area through the moving or processing of the ground surface. Most construction projects require earthworks, which are heavily dependent on mechanical equipment (e.g., excavators, trucks and compactors). Often, earthworks are the most costly and time-consuming component of infrastructure constructions (e.g., road, railway and airports) and current pressure for higher productivity and safety highlights the need to optimize earthworks, which is a nontrivial task. Most previous attempts at tackling this problem focus on single-objective optimization of partial processes or aspects of earthworks, overlooking the advantages of a multi-objective and global optimization. This work describes a novel optimization system based on an evolutionary multi-objective approach, capable of globally optimizing several objectives simultaneously and dynamically. The proposed system views an earthwork construction as a production line, where the goal is to optimize resources under two crucial criteria (costs and duration) and focus the evolutionary search (non-dominated sorting genetic algorithm-II) on compaction allocation, using linear programming to distribute the remaining equipment (e.g., excavators). Several experiments were held using real-world data from a Portuguese construction site, showing that the proposed system is quite competitive when compared with current manual earthwork equipment allocation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

La gestión de recursos en los procesadores multi-core ha ganado importancia con la evolución de las aplicaciones y arquitecturas. Pero esta gestión es muy compleja. Por ejemplo, una misma aplicación paralela ejecutada múltiples veces con los mismos datos de entrada, en un único nodo multi-core, puede tener tiempos de ejecución muy variables. Hay múltiples factores hardware y software que afectan al rendimiento. La forma en que los recursos hardware (cómputo y memoria) se asignan a los procesos o threads, posiblemente de varias aplicaciones que compiten entre sí, es fundamental para determinar este rendimiento. La diferencia entre hacer la asignación de recursos sin conocer la verdadera necesidad de la aplicación, frente a asignación con una meta específica es cada vez mayor. La mejor manera de realizar esta asignación és automáticamente, con una mínima intervención del programador. Es importante destacar, que la forma en que la aplicación se ejecuta en una arquitectura no necesariamente es la más adecuada, y esta situación puede mejorarse a través de la gestión adecuada de los recursos disponibles. Una apropiada gestión de recursos puede ofrecer ventajas tanto al desarrollador de las aplicaciones, como al entorno informático donde ésta se ejecuta, permitiendo un mayor número de aplicaciones en ejecución con la misma cantidad de recursos. Así mismo, esta gestión de recursos no requeriría introducir cambios a la aplicación, o a su estrategia operativa. A fin de proponer políticas para la gestión de los recursos, se analizó el comportamiento de aplicaciones intensivas de cómputo e intensivas de memoria. Este análisis se llevó a cabo a través del estudio de los parámetros de ubicación entre los cores, la necesidad de usar la memoria compartida, el tamaño de la carga de entrada, la distribución de los datos dentro del procesador y la granularidad de trabajo. Nuestro objetivo es identificar cómo estos parámetros influyen en la eficiencia de la ejecución, identificar cuellos de botella y proponer posibles mejoras. Otra propuesta es adaptar las estrategias ya utilizadas por el Scheduler con el fin de obtener mejores resultados.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, different recovery methods applied at different network layers and time scales are used in order to enhance the network reliability. Each layer deploys its own fault management methods. However, current recovery methods are applied to only a specific layer. New protection schemes, based on the proposed partial disjoint path algorithm, are defined in order to avoid protection duplications in a multi-layer scenario. The new protection schemes also encompass shared segment backup computation and shared risk link group identification. A complete set of experiments proves the efficiency of the proposed methods in relation with previous ones, in terms of resources used to protect the network, the failure recovery time and the request rejection ratio

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper focuses on QoS routing with protection in an MPLS network over an optical layer. In this multi-layer scenario each layer deploys its own fault management methods. A partially protected optical layer is proposed and the rest of the network is protected at the MPLS layer. New protection schemes that avoid protection duplications are proposed. Moreover, this paper also introduces a new traffic classification based on the level of reliability. The failure impact is evaluated in terms of recovery time depending on the traffic class. The proposed schemes also include a novel variation of minimum interference routing and shared segment backup computation. A complete set of experiments proves that the proposed schemes are more efficient as compared to the previous ones, in terms of resources used to protect the network, failure impact and the request rejection ratio

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article presents a formal model of policy decision-making in an institutional framework of separation of powers in which the main actors are pivotal political parties with voting discipline. The basic model previously developed from pivotal politics theory for the analysis of the United States lawmaking is here modified to account for policy outcomes and institutional performances in other presidential regimes, especially in Latin America. Legislators' party indiscipline at voting and multi-partism appear as favorable conditions to reduce the size of the equilibrium set containing collectively inefficient outcomes, while a two-party system with strong party discipline is most prone to produce 'gridlock', that is, stability of socially inefficient policies. The article provides a framework for analysis which can induce significant revisions of empirical data, especially regarding the effects of situations of (newly defined) unified and divided government, different decision rules, the number of parties and their discipline. These implications should be testable and may inspire future analytical and empirical work.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In moment structure analysis with nonnormal data, asymptotic valid inferences require the computation of a consistent (under general distributional assumptions) estimate of the matrix $\Gamma$ of asymptotic variances of sample second--order moments. Such a consistent estimate involves the fourth--order sample moments of the data. In practice, the use of fourth--order moments leads to computational burden and lack of robustness against small samples. In this paper we show that, under certain assumptions, correct asymptotic inferences can be attained when $\Gamma$ is replaced by a matrix $\Omega$ that involves only the second--order moments of the data. The present paper extends to the context of multi--sample analysis of second--order moment structures, results derived in the context of (simple--sample) covariance structure analysis (Satorra and Bentler, 1990). The results apply to a variety of estimation methods and general type of statistics. An example involving a test of equality of means under covariance restrictions illustrates theoretical aspects of the paper.