989 resultados para Project performance Infrastructure


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The content and context of work significantly influences an employees’ satisfaction. While managers see work motivation as a tool to engage the employees so that they perform better, academicians value work motivation for its contribution to human behaviour. Though the relationship between employee motivation and project success has been extensively covered in the literature, more research focusing on the nature of job design on project success may have been wanting. We address this gap through this study. The present study contributes to the extant literature by suggesting an operational framework of work motivation for project—based organizations. We are also advancing the conceptual understanding of this variable by understanding how the different facets of work motivation have a differing impact of the various parameters of project performance. A survey instrument using standardized scales of work motivation and project success was used. 199 project workers from various industries completed the survey. We first ‘operationalized’ the definition of work motivation for the purpose of our study through a principal component analysis of work motivation items. We obtained a five factor structure that had items pertaining to employee development, work climate, goal clarity, and job security. We then performed a Pearson’s correlation analysis which revealed moderate to significant relationship between project outcomes ad work climate; project outcomes & employee development. In order to establish a causality between work motivation and project management success, we employed linear regression analysis. The results show that work climate is a significant predictor of client satisfaction, while it moderately influences the project quality. Further, bringing in objectivity to project work is important for a successful implementation.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Data mining techniques extract repeated and useful patterns from a large data set that in turn are utilized to predict the outcome of future events. The main purpose of the research presented in this paper is to investigate data mining strategies and develop an efficient framework for multi-attribute project information analysis to predict the performance of construction projects. The research team first reviewed existing data mining algorithms, applied them to systematically analyze a large project data set collected by the survey, and finally proposed a data-mining-based decision support framework for project performance prediction. To evaluate the potential of the framework, a case study was conducted using data collected from 139 capital projects and analyzed the relationship between use of information technology and project cost performance. The study results showed that the proposed framework has potential to promote fast, easy to use, interpretable, and accurate project data analysis.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The role of individuals in the innovation process is highlighted as system integrator and/or champion in literature, however, little is known about championing role of a project manager. Our contention is that the role of the project manager (PM) is essentially of a champion to enable innovation and achieve desired project performance in construction project environment. Hypothesizing that championing behaviour is determined by a number of individual and situational factors, which in turn effects on level of innovation and project performance, we used correlation and regression analysis to test the hypotheses. A survey was carried out with project managers and project team members in 32 building and civil engineering projects in Singapore to test the hypothesized relationships. The results corroborate the importance of championing behaviour to fostering innovation and achieve better project performance.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

As sustainability becomes an important principle guiding various human activities around the globe, the higher education sector is being asked to take an active part in educating and promoting sustainability due to its moral responsibility, social obligation and its own needs to adapt to new circumstances. There is a global trend of higher education institutions embarking on responses to the sustainability challenge. On-campus building performance is one of the most important indicators for “sustainable universities”, because buildings carry substantially environmental burden such as considerable consumption of raw materials and energy as well as huge amount of waste generation and greenhouse gas emission. Plus, much research proves that building performance can impact on students and staff’s awareness about and behaviours related to sustainability. The past studies rarely discussed about sustainable construction projects in universities’ unique context. Universities are labeled with distinct characteristics such as complex governance, multiple cultures and juggling missions and so on. It is necessary and meaningful to examine the project management system in terms of universities’ organizational environment. Thus, this research project applies Delphi study to identify primary barriers to green technology application in on-campus buildings, critical factors for sustainable project success, key actions in project phases and strategies for project improvement. Through three rounds of questionnaires among panel experts, the authors obtain a profound understanding of project delivery system in universities. The research results are expected to provide sustainability practitioners with holistic understanding and generic information about sustainable construction project performance on campus as an assistance tool.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose - Cultural issues in the construction industry have attracted growing attention from both practitioners and academia. However, there are few studies on culture issues at the project level. The influence of project culture has not traditionally been on the research radar. This research aims to investigate the impacts of project culture on the performance of construction projects. Design/methodology/approach - A case study approach, utilising questionnaire surveys, in-depth interviews and review of project documents, was employed to investigate project culture and its associated impacts in two major hospital projects. Findings - The results indicated that project culture played an important role in achieving harmonious relationships between project participants and better project outcomes in terms of schedule, functionality, satisfaction with the process, satisfaction with the relationships, environmental issues addressed commercial success, further business opportunities and overall performance. Case 1 outperformed Case 2 in these performance indicators. Similarly, it became clear that the project’s culture should be developed from the outset and sustained during the project period. Furthermore, it was also highlighted that the project culture should be translated to all levels of the supply chain i.e. sub-contractors and suppliers. Practical implications – The findings enabled the client to understand the role of project culture and actively commit towards the development and maintenance of the project culture from very early on. It also helps project teams to understand how to deal with cultural issues at the project level. Originality/value- This study is one of limited empirical studies that offer in-depth insights of how project culture affects the performance of construction projects. It is also the first study of hospital projects on the research topic.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Background Value for money (VfM) on collaborative construction projects is dependent on the learning capabilities of the organisations and people involved. Within the context of infrastructure delivery, there is little research about the impact of organisational learning capability on project value. The literature contains a multiplicity of often un-testable definitions about organisational learning abilities. This paper defines learning capability as a dynamic capability that participant organisations purposely develop to add value to collaborative projects. The paper reports on a literature review that proposes a framework that conceptualises learning capability to explore the topic. This work is the first phase of a large-scale national survey funded by the Alliancing Association of Australasia and the Australian Research Council. Methodology Desk-top review of leading journals in the areas of strategic management, strategic alliances and construction management, as well as recent government documents and industry guidelines, was undertaken to synthesise, conceptualise and operationalise the concept of learning capability. The study primarily draws on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991; Wernerfelt 1984), absorptive capacity (e.g. Cohen and Levinthal 1990; Zahra and George 2002); and dynamic capabilities (e.g. Helfat et al. 2007; Teece et al. 1997; Winter 2003). Content analysis of the literature was undertaken to identify key learning routines. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Findings and Future Research The review process resulted in a framework for the conceptualisation of learning capability that shows three phases of learning: (1) exploratory learning, (2) transformative learning and (3) exploitative learning. These phases combine both internal and external learning routines to influence project performance outcomes and thus VfM delivered under collaborative contracts. Sitting within these phases are eight categories of learning capability comprising knowledge articulation, identification, acquisition, dissemination, codification, internationalisation, transformation and application. The learning routines sitting within each category will be disaggregated in future research as the basis for measureable items in a large-scale survey study. The survey will examine the extent to which various learning routines influence project outcomes, as well as the relationships between them. This will involve identifying the routines that exist within organisations in the construction industry, their resourcing and rate of renewal, together with the extent of use and perceived value within the organisation. The target population is currently estimated to be around 1,000 professionals with experience in relational contracting in Australia. This future research will build on the learning capability framework to provide data that will assist construction organisations seeking to maximise VfM on construction projects.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

For design-build (DB) projects, owners normally use lump sum and Guaranteed Maximum Price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteristics affect the owners’ selection of contract arrangement. Project information from Design-build Institute of America (DBIA) database was collected to reveal the statistical relationship between different project characteristics and contract types and to compare project performance between lump sum and GMP contract. The results show that lump sum is still the most frequently used contract method for DB projects, especially in the public sector. However, projects using GMP contract are more likely to have less schedule delay and cost overrun as compared to those with lump sum contract. The chi-square tests of cross tabulations reveal that project type, owner type, and procurement method affect the selection of contract types significantly. Civil infrastructure rather than industrial engineering project tends to use lump sum more frequently; and qualification-oriented contractor selection process resorts to GMP more often compared with cost-oriented process. The findings of this research contribute to the current body of knowledge concerning the effect of associated project characteristics on contract type selection. Overall, the results of this study provide empirical evidence from real DB projects that can be used by owners to select appropriate contract types and eventually improve future project performance.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This research was undertaken to encompass and identify challenges and impact factors that affect the successful outcomes of heritage building projects, especially those related to finding major causes of delays and cost overruns across projects in all Australian states. This project determined and analysed the causes of such delays and programme issues emanating from the planning and execution phases, whilst also analysing the requirements for management of multiple stakeholder relationships and the influence of unforeseen technical factors. The research proposes "call for action" guidance and was validated by experienced experts in heritage building projects in Australia. The proposed guidance is designed to ensure that realistic cost targets and delivery timeframes are set in future heritage projects, and necessary interventions made at appropriate project stages to ensure decisions are made that will help to prevent overtime and cost overuns.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A baseline survey for the project which had been conducted in 2009 had gaps that could not allow assessment of project performance in the outcome and impact indicators to be made. This study was, therefore, commissioned to reconstruct the baseline data, aligned to the impact and outcome indicators on the project logframe and results framework, against which project achievements could be assessed. The purpose and scope of the study was to reconstruct the baseline data and analysis describing the situation prior to QAFM Project inception, taking 2008 as the baseline year, which was aligned to the project logframe outcome and impact indicators; to collect data on current status to compare project outcome (and where possible impact) in improved fish handling sites in comparison with the baseline as well as with comparable non-improved fish landing sites as control group. The study was conducted through secondary data search from sources at NaFIRRI, DFR and ICEIDA. Field data collection was carried out using a sample survey covering 312 respondents including boat and gear owners, crew members, processors and traders at eight project and two control landing sites. Key Informant Interviews were conducted with DFOs and BMU leaders in the study districts and landing sites respectively.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Infrastructure project sustainability assessment typically entails the use of specialised assessment tools to measure and rate project performance against a set of criteria. This paper looks beyond the prevailing approaches to sustainability assessments and explores sustainability principles in terms of project risks and opportunities. Taking a risk management approach to applying sustainability concepts to projects has the potential to reconceptualise decision structures for sustainability from bespoke assessments to becoming a standard part of the project decisionmaking process. By integrating issues of sustainability into project risk management for project planning, design and construction, sustainability is considered within a more traditional business and engineering language. Currently, there is no widely practised approach for objectively considering the environmental and social context of projects alongside the more traditional project risk assessments of time, cost and quality. A risk-based approach would not solve all the issues associated with existing sustainability assessments but it would place sustainability concerns alongside other key risks and opportunities, integrating sustainability with other project decisions.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The overall intent of this research is to provide architects with information that can be used to improve their performance so as to optimally satisfy the client's requirements and achieve high-quality overall project performance in Nigerian construction industry. Architect performance criteria were identified based on literature within the domain of architect responsibilities. The assessment of architects’ performance was carried out through a questionnaire survey of clients of recently completed building projects in Nigeria. Analysis of data includes comparison of criteria using importance–performance index analysis. Factor analysis was carried out on criteria where architects are falling below average, to group and explore the latent structure of the criteria in the data. The results showed that the architect needs to focus on management skills and ability, buildability, design quality, project communication, project integration and client focus. These results would encourage architects to perform better within their full responsibilities in the building delivery process and deliver high-quality projects within Nigerian construction industry.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The WASP project and infrastructure supporting the SuperWASP Facility are described. As the instrument, reduction pipeline and archive system are now fully operative we expect the system to have a major impact in the discovery of bright exo-planet candidates as well in more general variable star projects.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

he Science of Lost Medieval Gaelic Graveyard tells the story of the discovery in 2003 of a graveyard and the foundations of a small forgotten stone church at Ballyhanna, in Ballyshannon, Co. Donegal, as part of the N15 Bundoran–Ballyshannon Bypass archaeological works. This led to the excavation of one of the largest collections of medieval burials ever undertaken on this island. Over 1,200 individuals were excavated from the site at Ballyhanna during the winter of 2003–4, representing 1,000 years of burial through the entire Irish medieval period. The discovery led to the establishment of a cross-border research collaboration—the Ballyhanna Research Project—between Queen’s University Belfast and the Institute of Technology, Sligo, which has brought to life this lost Gaelic graveyard.

This book shows how cutting-edge scientific research may aid our understanding and interpretation of archaeology and reveal new insights into past societies. For example, the use of ancient DNA analysis represented the first biomolecular archaeological evaluation of a medieval population to date and provided evidence that cystic fibrosis was much less prevalent in the medieval period than today. The Science of Lost Medieval Gaelic Graveyard is about a community who lived in Gaelic Ireland, about their lifestyles, health and diet. It tells us of their deaths and of their burial traditions, and through examining all of these aspects, it reveals the ebb and flow of their lives.

The book is accompanied by a CD-ROM which includes supplementary information from the Ballyhanna Research Project and the original excavation and survey reports for all of the archaeological sites on the N15 Bundoran–Ballyshannon Bypass.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The importance of inter-organizational trust to project success has been increasingly highlighted in the construction industry. This study aims to explore the role of trust between project parties. It adopts a combination of quantitative and qualitative methodologies. Based on the analysis of the responses of a questionnaire survey, trust is demonstrated to have a significant contribution to the development of cooperative or collaborative relationships; fostering trust proves to have a major influence on the improvement of project performance; and some relationship and performance indicators are found to have closer associations with trust than others so that trust is more important to
the development of relationship and the improvement of performance in these aspects. The analysis of questionnaire responses also provides significant evidence for the reduction in monitoring and control following the increase of mutual trust. The questionnaire survey is followed by a series of expert interviews, both of which contribute to the establishment of a model that links trust with relationship and performance and distinguishes the new approach that is based on trust from the traditional mechanism that relies on monitoring and control.