941 resultados para Process model alignment


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Investigation of high pressure pretreatment process for gold leaching is the objective of the present master's thesis. The gold ores and concentrates which cannot be easily treated by leaching process are called "refractory". These types of ores or concentrates often have high content of sulfur and arsenic that renders the precious metal inaccessible to the leaching agents. Since the refractory ores in gold manufacturing industry take a considerable share, the pressure oxidation method (autoclave method) is considered as one of the possible ways to overcome the related problems. Mathematical modeling is the main approach in this thesis which was used for investigation of high pressure oxidation process. For this task, available information from literature concerning this phenomenon, including chemistry, mass transfer and kinetics, reaction conditions, applied apparatus and application, was collected and studied. The modeling part includes investigation of pyrite oxidation kinetics in order to create a descriptive mathematical model. The following major steps are completed: creation of process model by using the available knowledge; estimation of unknown parameters and determination of goodness of the fit; study of the reliability of the model and its parameters.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The development of carbon capture and storage (CCS) has raised interest towards novel fluidised bed (FB) energy applications. In these applications, limestone can be utilized for S02 and/or CO2 capture. The conditions in the new applications differ from the traditional atmospheric and pressurised circulating fluidised bed (CFB) combustion conditions in which the limestone is successfully used for SO2 capture. In this work, a detailed physical single particle model with a description of the mass and energy transfer inside the particle for limestone was developed. The novelty of this model was to take into account the simultaneous reactions, changing conditions, and the effect of advection. Especially, the capability to study the cyclic behaviour of limestone on both sides of the calcination-carbonation equilibrium curve is important in the novel conditions. The significances of including advection or assuming diffusion control were studied in calcination. Especially, the effect of advection in calcination reaction in the novel combustion atmosphere was shown. The model was tested against experimental data; sulphur capture was studied in a laboratory reactor in different fluidised bed conditions. Different Conversion levels and sulphation patterns were examined in different atmospheres for one limestone type. The Conversion curves were well predicted with the model, and the mechanisms leading to the Conversion patterns were explained with the model simulations. In this work, it was also evaluated whether the transient environment has an effect on the limestone behaviour compared to the averaged conditions and in which conditions the effect is the largest. The difference between the averaged and transient conditions was notable only in the conditions which were close to the calcination-carbonation equilibrium curve. The results of this study suggest that the development of a simplified particle model requires a proper understanding of physical and chemical processes taking place in the particle during the reactions. The results of the study will be required when analysing complex limestone reaction phenomena or when developing the description of limestone behaviour in comprehensive 3D process models. In order to transfer the experimental observations to furnace conditions, the relevant mechanisms that take place need to be understood before the important ones can be selected for 3D process model. This study revealed the sulphur capture behaviour under transient oxy-fuel conditions, which is important when the oxy-fuel CFB process and process model are developed.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The main objective of the study was to form a strategic process model and project management tool to help IFRS change implementation projects in the future. These research results were designed based on the theoretical framework of Total Quality Management and leaning on the facts that were collected during the empirical case study of IAS 17 change. The us-age of the process oriented approach in IFRS standard change implementation after the initial IFRS implementation is rationalized with the following arguments: 1) well designed process tools lead to optimization of resources 2) With the help of process stages and related tasks it is easy to ensure the efficient way of working and managing the project as well as make sure to include all necessary stakeholders to the change process. This research is following the qualitative approach and the analysis is in describing format. The first part of the study is a literature review and the latter part has been conducted as a case study. The data has been col-lected in the case company with interviews and observation. The main findings are a process model for IFRS standard change process and a check-list formatted management tool for up-coming IFRS standard change projects. The process flow follows the main cornerstones in IASB’s standard setting process and the management tool has been divided to stages accordingly.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This thesis studies the possibility to use lean tools and methods in a quotation process which is carried out in an office environment. The aim of the study was to find out and test the relevant lean tools and methods which can help to balance and standardize the quotation process, and reduce the variance in quotation lead times and in quality. Seminal works, researches and guide books related to the topic were used as the basis for the theory development. Based on the literature review and the case company’s own lean experience, the applicable lean tools and methods were selected to be tested by a sales support team. Leveling production, by product categorization and value stream mapping, was a key method to be used to balance the quotation process. 5S method was started concurrently for standardizing the work. Results of the testing period showed that lean tools and methods are applicable in office process and selected tools and methods helped to balance and standardize the quotation process. Case company’s sales support team decided to implement new lean based quotation process model.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

years 8 months) and 24 older (M == 7 years 4 months) children. A Monitoring Process Model (MPM) was developed and tested in order to ascertain at which component process ofthe MPM age differences would emerge. The MPM had four components: (1) assessment; (2) evaluation; (3) planning; and (4) behavioural control. The MPM was assessed directly using a referential communication task in which the children were asked to make a series of five Lego buildings (a baseline condition and one building for each MPM component). Children listened to instructions from one experimenter while a second experimenter in the room (a confederate) intetjected varying levels ofverbal feedback in order to assist the children and control the component ofthe MPM. This design allowed us to determine at which "stage" ofprocessing children would most likely have difficulty monitoring themselves in this social-cognitive task. Developmental differences were obselVed for the evaluation, planning and behavioural control components suggesting that older children were able to be more successful with the more explicit metacomponents. Interestingly, however, there was no age difference in terms ofLego task success in the baseline condition suggesting that without the intelVention ofthe confederate younger children monitored the task about as well as older children. This pattern ofresults indicates that the younger children were disrupted by the feedback rather than helped. On the other hand, the older children were able to incorporate the feedback offered by the confederate into a plan ofaction. Another aim ofthis study was to assess similar processing components to those investigated by the MPM Lego task in a more naturalistic observation. Together the use ofthe Lego Task ( a social cognitive task) and the naturalistic social interaction allowed for the appraisal of cross-domain continuities and discontinuities in monitoring behaviours. In this vein, analyses were undertaken in order to ascertain whether or not successful performance in the MPM Lego Task would predict cross-domain competence in the more naturalistic social interchange. Indeed, success in the two latter components ofthe MPM (planning and behavioural control) was related to overall competence in the naturalistic task. However, this cross-domain prediction was not evident for all levels ofthe naturalistic interchange suggesting that the nature ofthe feedback a child receives is an important determinant ofresponse competency. Individual difference measures reflecting the children's general cognitive capacity (Working Memory and Digit Span) and verbal ability (vocabulary) were also taken in an effort to account for more variance in the prediction oftask success. However, these individual difference measures did not serve to enhance the prediction oftask performance in either the Lego Task or the naturalistic task. Similarly, parental responses to questionnaires pertaining to their child's temperament and social experience also failed to increase prediction oftask performance. On-line measures ofthe children's engagement, positive affect and anxiety also failed to predict competence ratings.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

We present a statistical image-based shape + structure model for Bayesian visual hull reconstruction and 3D structure inference. The 3D shape of a class of objects is represented by sets of contours from silhouette views simultaneously observed from multiple calibrated cameras. Bayesian reconstructions of new shapes are then estimated using a prior density constructed with a mixture model and probabilistic principal components analysis. We show how the use of a class-specific prior in a visual hull reconstruction can reduce the effect of segmentation errors from the silhouette extraction process. The proposed method is applied to a data set of pedestrian images, and improvements in the approximate 3D models under various noise conditions are shown. We further augment the shape model to incorporate structural features of interest; unknown structural parameters for a novel set of contours are then inferred via the Bayesian reconstruction process. Model matching and parameter inference are done entirely in the image domain and require no explicit 3D construction. Our shape model enables accurate estimation of structure despite segmentation errors or missing views in the input silhouettes, and works even with only a single input view. Using a data set of thousands of pedestrian images generated from a synthetic model, we can accurately infer the 3D locations of 19 joints on the body based on observed silhouette contours from real images.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to propose a process model for knowledge transfer in using theories relating knowledge communication and knowledge translation. Design/methodology/approach – Most of what is put forward in this paper is based on a research project titled “Procurement for innovation and knowledge transfer (ProFIK)”. The project is funded by a UK government research council – The Engineering and Physical Sciences Research Council (EPSRC). The discussions are mainly grounded on a thorough review of literature accomplished as part of the research project. Findings – The process model developed in this paper has built upon the theory of knowledge transfer and the theory of communication. Knowledge transfer, per se, is not a mere transfer of knowledge. It involves different stages of knowledge transformation. Depending on the context of knowledge transfer, it can also be influenced by many factors; some positive and some negative. The developed model of knowledge transfer attempts to encapsulate all these issues in order to create a holistic framework. Originality/value of paper – An attempt has been made in the paper to combine some of the significant theories or findings relating to knowledge transfer together, making the paper an original and valuable one.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Nowadays, more than half of the computer development projects fail to meet the final users' expectations. One of the main causes is insufficient knowledge about the organization of the enterprise to be supported by the respective information system. The DEMO methodology (Design and Engineering Methodology for Organizations) has been proved as a well-defined method to specify, through models and diagrams, the essence of any organization at a high level of abstraction. However, this methodology is platform implementation independent, lacking the possibility of saving and propagating possible changes from the organization models to the implemented software, in a runtime environment. The Universal Enterprise Adaptive Object Model (UEAOM) is a conceptual schema being used as a basis for a wiki system, to allow the modeling of any organization, independent of its implementation, as well as the previously mentioned change propagation in a runtime environment. Based on DEMO and UEAOM, this project aims to develop efficient and standardized methods, to enable an automatic conversion of DEMO Ontological Models, based on UEAOM specification into BPMN (Business Process Model and Notation) models of processes, using clear semantics, without ambiguities, in order to facilitate the creation of processes, almost ready for being executed on workflow systems that support BPMN.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper presents a new model for the representation of electrodes' filaments of hot-cathode fluorescent lamps, during preheating processes based on the injection of currents with constant root mean square (rms) values. The main improvement obtained with this model is the prediction of the R-h/R-c ratio during the preheating process, as a function of the preheating time and of the rms current injected in the electrodes. Using the proposed model, it is possible to obtain an estimate of the time interval and the current that should be provided by the electronic ballast, in order to ensure a suitable preheating process. is estimate of time and current can be used as input data in the design of electronic ballasts with programmed lamp start, permitting the prediction of the R-h/R-c ratio during the initial steps of the design (theoretical analysis and digital simulation). Therefore, the use of the proposed model permits to reduce the necessity of several empirical adjustments in the prototype, in order to set the operation of electronic ballasts during the preheating process. This fact reduces time and costs associated to the global design procedure of electronic ballasts.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In electronic commerce, systems development is based on two fundamental types of models, business models and process models. A business model is concerned with value exchanges among business partners, while a process model focuses on operational and procedural aspects of business communication. Thus, a business model defines the what in an e-commerce system, while a process model defines the how. Business process design can be facilitated and improved by a method for systematically moving from a business model to a process model. Such a method would provide support for traceability, evaluation of design alternatives, and seamless transition from analysis to realization. This work proposes a unified framework that can be used as a basis to analyze, to interpret and to understand different concepts associated at different stages in e-Commerce system development. In this thesis, we illustrate how UN/CEFACT’s recommended metamodels for business and process design can be analyzed, extended and then integrated for the final solutions based on the proposed unified framework. Also, as an application of the framework, we demonstrate how process-modeling tasks can be facilitated in e-Commerce system design. The proposed methodology, called BP3 stands for Business Process Patterns Perspective. The BP3 methodology uses a question-answer interface to capture different business requirements from the designers. It is based on pre-defined process patterns, and the final solution is generated by applying the captured business requirements by means of a set of production rules to complete the inter-process communication among these patterns.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Business strategy is important to all organizations. Nearly all Fortune 500 firms are implementing Enterprise Resource Planning (ERP) systems to improve the execution of their business strategy and to improve integration with its information technology (IT) strategy. Successful implementation of these multi-million dollar software systems are requiring new emphasis on change management and on Business and IT strategic alignment. This paper examines business and IT strategic alignment and seeks to explore whether an ERP implementation can drive business process reengineering and business and IT strategic alignment. An overview of business strategy and strategic alignment are followed by an analysis of ERP. The “As-Is/To-Be” process model is then presented and explained as a simple, but vital tool for improving business strategy, strategic alignment, and ERP implementation success.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The aim of our study was to develop a modeling framework suitable to quantify the incidence, absolute number and economic impact of osteoporosis-attributable hip, vertebral and distal forearm fractures, with a particular focus on change over time, and with application to the situation in Switzerland from 2000 to 2020. A Markov process model was developed and analyzed by Monte Carlo simulation. A demographic scenario provided by the Swiss Federal Statistical Office and various Swiss and international data sources were used as model inputs. Demographic and epidemiologic input parameters were reproduced correctly, confirming the internal validity of the model. The proportion of the Swiss population aged 50 years or over will rise from 33.3% in 2000 to 41.3% in 2020. At the total population level, osteoporosis-attributable incidence will rise from 1.16 to 1.54 per 1,000 person-years in the case of hip fracture, from 3.28 to 4.18 per 1,000 person-years in the case of radiographic vertebral fracture, and from 0.59 to 0.70 per 1,000 person-years in the case of distal forearm fracture. Osteoporosis-attributable hip fracture numbers will rise from 8,375 to 11,353, vertebral fracture numbers will rise from 23,584 to 30,883, and distal forearm fracture numbers will rise from 4,209 to 5,186. Population-level osteoporosis-related direct medical inpatient costs per year will rise from 713.4 million Swiss francs (CHF) to CHF946.2 million. These figures correspond to 1.6% and 2.2% of Swiss health care expenditures in 2000. The modeling framework described can be applied to a wide variety of settings. It can be used to assess the impact of new prevention, diagnostic and treatment strategies. In Switzerland incidences of osteoporotic hip, vertebral and distal forearm fracture will rise by 33%, 27%, and 19%, respectively, between 2000 and 2020, if current prevention and treatment patterns are maintained. Corresponding absolute fracture numbers will rise by 36%, 31%, and 23%. Related direct medical inpatient costs are predicted to increase by 33%; however, this estimate is subject to uncertainty due to limited availability of input data.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

IS outsourcing projects often fail to achieve project goals. To inhibit this failure, managers need to design formal controls that are tailored to the specific contextual demands. However, the dynamic and uncertain nature of IS outsourcing projects makes the design of such specific formal controls at the outset of a project challenging. Hence, the process of translating high-level project goals into specific formal controls becomes crucial for success or failure of IS outsourcing projects. Based on a comparative case study of four IS outsourcing projects, our study enhances current understanding of such translation processes and their consequences by developing a process model that explains the success or failure to achieve high-level project goals as an outcome of two unique translation patterns. This novel process-based explanation for how and why IS outsourcing projects succeed or fail has important implications for control theory and IS project escalation literature.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Information systems (IS) outsourcing projects often fail to achieve initial goals. To avoid project failure, managers need to design formal controls that meet the specific contextual demands of the project. However, the dynamic and uncertain nature of IS outsourcing projects makes it difficult to design such specific formal controls at the outset of a project. It is hence crucial to translate high-level project goals into specific formal controls during the course of a project. This study seeks to understand the underlying patterns of such translation processes. Based on a comparative case study of four outsourced software development projects, we inductively develop a process model that consists of three unique patterns. The process model shows that the performance implications of emergent controls with higher specificity depend on differences in the translation process. Specific formal controls have positive implications for goal achievement if only the stakeholder context is adapted, while they are negative for goal achievement if in the translation process tasks are unintendedly adapted. In the latter case projects incrementally drift away from their initial direction. Our findings help to better understand control dynamics in IS outsourcing projects. We contribute to a process theoretic understanding of IS outsourcing governance and we derive implications for control theory and the IS project escalation literature.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Abstract?Background: There is no globally accepted open source software development process to define how open source software is developed in practice. A process description is important for coordinating all the software development activities involving both people and technology. Aim: The research question that this study sets out to answer is: What activities do open source software process models contain? The activity groups on which it focuses are Concept Exploration, Software Requirements, Design, Maintenance and Evaluation. Method: We conduct a systematic mapping study (SMS). A SMS is a form of systematic literature review that aims to identify and classify available research papers concerning a particular issue. Results: We located a total of 29 primary studies, which we categorized by the open source software project that they examine and by activity types (Concept Exploration, Software Requirements, Design, Maintenance and Evaluation). The activities present in most of the open source software development processes were Execute Tests and Conduct Reviews, which belong to the Evaluation activities group. Maintenance is the only group that has primary studies addressing all the activities that it contains. Conclusions: The primary studies located by the SMS are the starting point for analyzing the open source software development process and proposing a process model for this community. The papers in our paper pool that describe a specific open source software project provide more regarding our research question than the papers that talk about open source software development without referring to a specific open source software project.