876 resultados para Credit risk management
Resumo:
This article designs what it calls a Credit-Risk Balance Sheet (the risk being that of default by customers), a tool which, in principle, can contribute to revealing, controlling and managing the bad debt risk arising from a company¿s commercial credit, whose amount can represent a significant proportion of both its current and total assets.To construct it, we start from the duality observed in any credit transaction of this nature, whose basic identity can be summed up as Credit = Risk. ¿Credit¿ is granted by a company to its customer, and can be ranked by quality (we suggest the credit scoring system) and ¿risk¿ can either be assumed (interiorised) by the company itself or transferred to third parties (exteriorised).What provides the approach that leads to us being able to talk with confidence of a real Credit-Risk Balance Sheet with its methodological robustness is that the dual vision of the credit transaction is not, as we demonstrate, merely a classificatory duality (a double risk-credit classification of reality) but rather a true causal relationship, that is, a risk-credit causal duality.Once said Credit-Risk Balance Sheet (which bears a certain structural similarity with the classic net asset balance sheet) has been built, and its methodological coherence demonstrated, its properties ¿static and dynamic¿ are studied.Analysis of the temporal evolution of the Credit-Risk Balance Sheet and of its applications will be the object of subsequent works.
Resumo:
This article designs what it calls a Credit-Risk Balance Sheet (the risk being that of default by customers), a tool which, in principle, can contribute to revealing, controlling and managing the bad debt risk arising from a company¿s commercial credit, whose amount can represent a significant proportion of both its current and total assets.To construct it, we start from the duality observed in any credit transaction of this nature, whose basic identity can be summed up as Credit = Risk. ¿Credit¿ is granted by a company to its customer, and can be ranked by quality (we suggest the credit scoring system) and ¿risk¿ can either be assumed (interiorised) by the company itself or transferred to third parties (exteriorised).What provides the approach that leads to us being able to talk with confidence of a real Credit-Risk Balance Sheet with its methodological robustness is that the dual vision of the credit transaction is not, as we demonstrate, merely a classificatory duality (a double risk-credit classification of reality) but rather a true causal relationship, that is, a risk-credit causal duality.Once said Credit-Risk Balance Sheet (which bears a certain structural similarity with the classic net asset balance sheet) has been built, and its methodological coherence demonstrated, its properties ¿static and dynamic¿ are studied.Analysis of the temporal evolution of the Credit-Risk Balance Sheet and of its applications will be the object of subsequent works.
Resumo:
The choice to adopt risk-sensitive measurement approaches for operational risks: the case of Advanced Measurement Approach under Basel II New Capital Accord This paper investigates the choice of the operational risk approach under Basel II requirements and whether the adoption of advanced risk measurement approaches allows banks to save capital. Among the three possible approaches for operational risk measurement, the Advanced Measurement Approach (AMA) is the most sophisticated and requires the use of historical loss data, the application of statistical tools, and the engagement of a highly qualified staff. Our results provide evidence that the adoption of AMA is contingent on the availability of bank resources and prior experience in risk-sensitive operational risk measurement practices. Moreover, banks that choose AMA exhibit low requirements for capital and, as a result might gain a competitive advantage compared to banks that opt for less sophisticated approaches. - Internal Risk Controls and their Impact on Bank Solvency Recent cases in financial sector showed the importance of risk management controls on risk taking and firm performance. Despite advances in the design and implementation of risk management mechanisms, there is little research on their impact on behavior and performance of firms. Based on data from a sample of 88 banks covering the period between 2004 and 2010, we provide evidence that internal risk controls impact the solvency of banks. In addition, our results show that the level of internal risk controls leads to a higher degree of solvency in banks with a major shareholder in contrast to widely-held banks. However, the relationship between internal risk controls and bank solvency is negatively affected by BHC growth strategies and external restrictions on bank activities, while the higher regulatory requirements for bank capital moderates positively this relationship. - The Impact of the Sophistication of Risk Measurement Approaches under Basel II on Bank Holding Companies Value Previous research showed the importance of external regulation on banks' behavior. Some inefficient standards may accentuate risk-taking in banks and provoke a financial crisis. Despite the growing literature on the potential effects of Basel II rules, there is little empirical research on the efficiency of risk-sensitive capital measurement approaches and their impact on bank profitability and market valuation. Based on data from a sample of 66 banks covering the period between 2008 and 2010, we provide evidence that prudential ratios computed under Basel II standards predict the value of banks. However, this relation is contingent on the degree of sophistication of risk measurement approaches that banks apply. Capital ratios are effective in predicting bank market valuation when banks adopt the advanced approaches to compute the value of their risk-weighted assets.
Resumo:
OBJECTIVE: To assess the prevalence of cardiovascular (CV) risk factors in Seychelles, a middle-income African country, and compare the cost-effectiveness of single-risk-factor management (treating individuals with arterial blood pressure >/= 140/90 mmHg and/or total serum cholesterol >/= 6.2 mmol/l) with that of management based on total CV risk (treating individuals with a total CV risk >/= 10% or >/= 20%).METHODS: CV risk factor prevalence and a CV risk prediction chart for Africa were used to estimate the 10-year risk of suffering a fatal or non-fatal CV event among individuals aged 40-64 years. These figures were used to compare single-risk-factor management with total risk management in terms of the number of people requiring treatment to avert one CV event and the number of events potentially averted over 10 years. Treatment for patients with high total CV risk (>/= 20%) was assumed to consist of a fixed-dose combination of several drugs (polypill). Cost analyses were limited to medication.FINDINGS: A total CV risk of >/= 10% and >/= 20% was found among 10.8% and 5.1% of individuals, respectively. With single-risk-factor management, 60% of adults would need to be treated and 157 cardiovascular events per 100 000 population would be averted per year, as opposed to 5% of adults and 92 events with total CV risk management. Management based on high total CV risk optimizes the balance between the number requiring treatment and the number of CV events averted.CONCLUSION: Total CV risk management is much more cost-effective than single-risk-factor management. These findings are relevant for all countries, but especially for those economically and demographically similar to Seychelles.
Resumo:
Highway construction is among the most dangerous industries in the US. Internal traffic control design, along with how construction equipment and vehicles interact with the traveling public, have a significant effect on how safe a highway construction work zone can be. An integrated approach was taken to research work-zone safety issues and mobility, including input from many personnel, ranging from roadway designers to construction laborers and equipment operators. The research team analyzed crash data from Iowa work-zone incident reports and Occupational Safety and Health Administration data for the industry in conjunction with the results of personal interviews, a targeted work-zone ingress and egress survey, and a work-zone pilot project.
Resumo:
The progress in prenatal medicine raises complex questions with respect to the physician-patient relationship. The physician needs to reconcile medical aspects, ethical principles as well as judicial norms. Already, during the first trimester, the physician has to put into practice the schedule combining for each individual pregnancy physical, laboratory and other appropriate exams. Physicians are under the obligation to inform in a clear and comprehensive way without creating unnecessary anxiety for their patients. Legal requirements include informed consent, the respect for the patient's right to self-determination, and compliance with the Swiss federal law on genetic testing, especially with its articles on prenatal screening and diagnosis. This article discusses the complexity of obstetrical practice when it comes to delivering adequate information within the scope of ethical and legal requirements in Switzerland. L'évolution de la médecine prénatale soulève des enjeux complexes dans la relation médecin-patient. Il s'agit de concilier à la fois les aspects médicaux, les principes éthiques et les normes juridiques. Dès le premier trimestre de la grossesse le médecin doit poser le cadre du suivi et des examens appropriés pour chaque grossesse. Son devoir est d'informer de manière claire et précise sans inquiéter inutilement, en respectant l'exigence légale d'un consentement éclairé et plus largement le droit de la patiente à l'autodétermination ainsi que le cadre de la loi fédérale suisse sur l'analyse génétique humaine dans le domaine du dépistage et du diagnostic prénatal. Cet article discute de la complexité de l'information et de l'application des principes éthiques et légaux dans la pratique obstétricale en Suisse.
Resumo:
Background: There may be a considerable gap between LDL cholesterol (LDL-C) and blood pressure (BP) goal values recommended by the guidelines and results achieved in daily practice. Design Prospective cross-sectional survey of cardiovascular disease risk profiles and management with focus on lipid lowering and BP lowering in clinical practice. Methods: In phase 1, the cardiovascular risk of patients with known lipid profile visiting their general practitioner was anonymously assessed in accordance to the PROCAM-score. In phase 2, high-risk patients who did not achieve LDL-C goal less than 2.6 mmol/l in phase 1 could be further documented. Results: Six hundred thirty-five general practitioners collected the data of 23 892 patients with known lipid profile. Forty percent were high-risk patients (diabetes mellitus or coronary heart disease or PROCAM-score >20%), compared with 27% estimated by the physicians. Goal attainment rate was almost double for BP than for LDL-C in high-risk patients (62 vs. 37%). Both goals were attained by 25%. LDL-C values in phase 1 and 2 were available for 3097 high-risk patients not at LDL-C goal in phase 1; 32% of patients achieved LDL-C goal of less than 2.6 mmol/l after a mean of 17 weeks. The most successful strategies for LDL-C reduction were implemented in only 22% of the high-risk patients. Conclusion: Although patients at high cardiovascular risk were treated more intensively than low or medium risk patients, the majority remained insufficiently controlled, which is an incentive for intensified medical education. Adequate implementation of Swiss and International guidelines would expectedly contribute to improved achievement of LDL-C and BP goal values in daily practice.
Resumo:
Tutkielman tavoitteena on määritellä projektikontrolloinnin ja - riskijohtamisen roolit ja toiminnot saksalaisissa kone- ja tehdassuunnitteluteollisuusyrityksissä. Tämä on kvalitatiivinen tutkielma, jossa käytetään voimakkaasti kuvailevia metodeita. Materiaali tutkimuksen empiiriseen osaan kerättiin kyselykaavakkeen avulla. Kyselykaavakkeiden tulokset käsiteltiin Microsoft Office Access- ohjelmalla ja analysoitiin Microsoft Office Excel- ohjelmalla ja Pivot table- työkalun avulla. Tutkimustulokset osoittavat, että asianmukaisessa projektikontrollointi- ja riskijohtamismetodien käytössä ja käyttötiheydessä esiintyy puutteita saksalaisissa kone- ja tehdassuunnitteluteollisuusyrityksissä. Tehostamalla ja keskittymällä enemmän projektikontrollointi- ja riskijohtamismetodeihin ja prosesseihin sekä projektien että yritysten suorituskyky paranisi.
Resumo:
This article draws on empirical material to reflect on what drives rapid change in flood risk management practice, reflecting wider interest in the way that scientific practices make risk landscapes and a specific focus on extreme events as drivers of rapid change. Such events are commonly referred to as a form of creative destruction, ones that reveal both the composition of socioenvironmental assemblages and provide a creative opportunity to remake those assemblages in alternate ways, therefore rapidly changing policy and practice. Drawing on wider thinking in complexity theory, we argue that what happens between events might be as, if not more, important than the events themselves. We use two empirical examples concerned with flood risk management practice: a rapid shift in the dominant technologies used to map flood risk in the United Kingdom and an experimental approach to public participation tested in two different locations, with dramatically different consequences. Both show that the state of the socioenvironmental assemblage in which the events take place matters as much as the magnitude of the events themselves. The periods between rapid changes are not simply periods of discursive consolidation but involve the ongoing mutation of such assemblages, which could either sensitize or desensitize them to rapid change. Understanding these intervening periods matters as much as the events themselves. If events matter, it is because of the ways in which they might bring into sharp focus the coding or framing of a socioenvironmental assemblage in policy or scientific practice irrespective of whether or not those events evolve the assemblage in subtle or more radical ways.
Resumo:
Työ käsittelee energian tuotannossa esiintyviä tärkeimpiä taloudellisia ja teknisiä riskejä sekä niiden hallitsemista energian tuottajan näkökulmasta. Ensiksi käsitellään yleisesti riskienhallintaa, eri riskityyppejä ja esitetään periaatteellinen riskienhallintaprosessi. Sen jälkeen tarkastellaan energiamarkkinoiden nykytilannetta lähinnä Pohjoismaiden tasolla ja verrataan sitä aikaisempaan tilanteeseen energian tuottajan kannalta. Tämä siksi, että energiamarkkinoiden vapautuminen on muuttanut merkittävästi energian tuotantoon liittyviä taloudellisia riskejä, käytännössä lisännyt niitä. Pääpaino on energian tuotannossa esiintyvien olennaisten riskien tarkastelussa ja niiden hallitsemisessa. Ensin esitellään työn kannalta olennaiset riskit ja tekijät joista ne aiheutuvat. Jokainen riski ja sen aiheuttamat haitat liiketoiminnalle kuvataan lyhyesti. Sen jälkeen kiinnitetään huomiota asioihin, jotka ovat tyypillisiä energian tuotannolle ja aiheuttavat samalla erikoisvaatimuksia riskienhallinnalle. Sitten käydään läpi sopivat riskienhallinnan menetelmät, jotka ovat yleisesti käytössä energian tuotannossa, aiemmin esitetyille olennaisille riskeille. Esitetyistä riskienhallinta menetelmistä useimpia ei ole kohdistettu millekään yksittäiselle riskille, vaan monia niistä voidaan käyttää useammankin riskin hallintaan.
Resumo:
Euroopan energiamarkkinat ovat olleet viimeisen kymmenen vuoden aikana suurten muutosten alla. Markkinoiden kehitys on ollut huomattavaa myös Iso-Britanniassa, jossa sähkö- ja kaasumarkkinat ovat olleet avoinna kilpailulle jo muutamia vuosia. Ennen markkinoiden avautumista energiyhtiöt pystyivät siirtämään kaikki riskit suoraan asiakkaan kannettaviksi. Markkinoiden avautumisen myötä lisääntynyt kilpailu on kuitenkin pakottanut energiayhtiöitä ajanmukaistamaan näkemyksiään riskeistä. Riskitekijät, joista ei aiemmin tarvinnut välittää, on nyt pystyttävä tunnistamaan ja hallitsemaan. Tämä työ keskittyy hinta- ja volyymiriskien hallintaan. Rahoitusmarkkinoilla pitkään käytettyjä riskienhallintatyökaluja on otettu käyttöön myös energiamarkkinoilla. Energiamarkkinoiden piirteet poikkeavat kuitenkin rahoitusmarkkinoista, eikä näitä työkaluja voida ottaa käyttöön muutoksitta. Silti, jopa muutosten jälkeen rahoitusmarkkinoiden riskienhallitavälineet aliarvioivat energiamarkkinoiden hinta- ja volyymiriskejä. Tässä yhteydessä työssä esitetään Profit at Risk, PaR. PaR on skenaariopohjainen riskienhallinnan työkalu, joka on kehitetty erityisesti energiamarkkinoille ja täten huomioi niiden erikoispiirteet. Työn rungon muodostavat energiamarkkinoiden käyttäytyminen, hinta- ja volyymiriskitekijät sekä pohdinta miten hinta- ja volyymiriskeiltä voidaan suojautua ja miten niitä voidaan hallita. PaR-metodologiaa verrataan perinteisiin riskienhallintamenetelmiin ja työn tavoitteena on tuoda esiin ne tekijät, joiden ansiosta PaR on sopivampi työkalu energiamarkkinoiden riskienhallintaan kuin perinteiset menetelmät. Käytännön esimerkkinä työssä toimii Fortum Energy plus’n PaR –malli. Koska PaR on kehitetty erityisesti energiamarkkinoille, se huomioi täysin markkinoiden aiheuttamat hinta- ja volyymiriskit. Käytännön esimerkki kuitenkin osoittaa, että PaR menetelmästä ei ole riskienhallinnallista hyötyä ellei työkalun käyttäjällä ole täydellistä tietämystä niin energiamarkkinoista kuin markkinoiden muutoksiin vaikuttavien tekijöiden käyttäytymisestä.
Resumo:
This paper presents the current state and development of a prototype web-GIS (Geographic Information System) decision support platform intended for application in natural hazards and risk management, mainly for floods and landslides. This web platform uses open-source geospatial software and technologies, particularly the Boundless (formerly OpenGeo) framework and its client side software development kit (SDK). The main purpose of the platform is to assist the experts and stakeholders in the decision-making process for evaluation and selection of different risk management strategies through an interactive participation approach, integrating web-GIS interface with decision support tool based on a compromise programming approach. The access rights and functionality of the platform are varied depending on the roles and responsibilities of stakeholders in managing the risk. The application of the prototype platform is demonstrated based on an example case study site: Malborghetto Valbruna municipality of North-Eastern Italy where flash floods and landslides are frequent with major events having occurred in 2003. The preliminary feedback collected from the stakeholders in the region is discussed to understand the perspectives of stakeholders on the proposed prototype platform.